Suitability Evaluation of a Train’s Scheduled Section Travel Time
Abstract
:1. Introduction
2. Evaluation Criterion
- a.
- Suitability measurement
- b.
- Reliability measurement
3. Data Description
4. Fitting Distribution of Train Running Time
5. Suitability of TSSTT
6. Conclusions
Author Contributions
Funding
Acknowledgments
Conflicts of Interest
References
- Higgins, A.; Kozan, E. Modeling train delays in urban networks. Transp. Sci. 1998, 32, 346–357. [Google Scholar] [CrossRef]
- Chang, Y.H.; Yeh, C.H.; Shen, C.C. A multi-objective model for passenger train services planning: Application to Taiwan’s high-speed rail line. Transport. Res. B Meth. 2000, 34, 91–106. [Google Scholar] [CrossRef]
- Abril, M.; Barber, F.; Ingolotti, L.; Salido, M.; Tormos, P.; Lova, A. An assessment of railway capacity. Transp. Res. Part E Logist. Transp. Rev. 2008, 44, 774–806. [Google Scholar] [CrossRef] [Green Version]
- Castillo, C.; Gallego, I.; Ureña, J.M.; Coronado, J.M. Timetabling optimization of a mixed double-and single-tracked railway network. Appl. Math. Model. 2011, 35, 859–878. [Google Scholar] [CrossRef]
- Cacchiani, V.; Toth, P. Nominal and robust train timetabling problems. Eur. J. Oper. Res. 2012, 219, 727–737. [Google Scholar] [CrossRef]
- Barrena, E.; Canca, D.; Coelho, L.C.; Laporte, G. Exact formulations and algorithm for the train timetabling problem with dynamic demand. Comput. Oper. Res. 2014, 44, 66–74. [Google Scholar] [CrossRef]
- Jovanovic, P.; Kecman, P.; Bojović, N.J.; Mandić, D. Optimal allocation of buffer times to increase train schedule robustness. Eur. J. Oper. Res. 2017, 256, 44–54. [Google Scholar] [CrossRef]
- Luan, X.; Miao, J.; Meng, L.; Corman, F.; Lodewijks, G. Integrated optimization on train scheduling and preventive maintenance time slots planning. Transp. Res. Part C Emerg. Technol. 2017, 80, 329–359. [Google Scholar] [CrossRef]
- Song, Y.; Liu, Z.; Wang, H.; Zhang, J.; Lu, X.; Duan, F. Analysis of the galloping behaviour of an electrified railway overhead contact line using the non-linear finite element method. Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit 2018, 232, 2339–2352. [Google Scholar] [CrossRef]
- Goossens, J.-W.; Van Hoesel, C.; Kroon, L. On solving multi-type railway line planning problems. Eur. J. Oper. Res. 2006, 168, 403–424. [Google Scholar] [CrossRef]
- Vansteenwegen, P.; Van Oudheusden, D. Developing railway timetables which guarantee a better service. Eur. J. Oper. Res. 2006, 173, 337–350. [Google Scholar] [CrossRef]
- Kroon, L.; Maroti, G.; Helmrich, M.R.; Vromans, M.; Dekker, R. Stochastic improvement of cyclic railway timetables. Transp. Res. Part B Methodol. 2008, 42, 553–570. [Google Scholar] [CrossRef] [Green Version]
- Espinosa-Aranda, J.L.; Garcia-Rodenas, R.; Ramírez-Flores, M.D.C.; Lopez-Garcia, M.L.; Angulo, E. High-speed railway scheduling based on user preferences. Eur. J. Oper. Res. 2015, 246, 772–786. [Google Scholar] [CrossRef]
- Yang, L.; Qi, J.; Li, S.; Gao, Y. Collaborative optimization for train scheduling and train stop planning on high-speed railways. Omega 2016, 64, 57–76. [Google Scholar] [CrossRef]
- Guo, X.; Wu, J.; Zhou, J.; Yang, X.; Wu, D.; Gao, Z. First-train timing synchronisation using multi-objective optimisation in urban transit networks. Int. J. Prod. Res. 2018, 57, 3522–3537. [Google Scholar] [CrossRef]
- Howlett, P.; Pudney, P.; Vu, X. Local energy minimization in optimal train control. Automatica 2009, 45, 2692–2698. [Google Scholar] [CrossRef]
- Albrecht, A.; Howlett, P.; Pudney, P.; Vu, X. Energy-efficient train control: From local convexity to global optimization and uniqueness. Automatica 2013, 49, 3072–3078. [Google Scholar] [CrossRef]
- Albrecht, A.; Howlett, P.; Pudney, P.; Vu, X.; Zhou, P. The key principles of optimal train control—Part 1: Formulation of the model, strategies of optimal type, evolutionary lines, location of optimal switching points. Transp. Res. Part B Methodol. 2016, 94, 482–508. [Google Scholar] [CrossRef]
- Ye, H.; Liu, R. A multiphase optimal control method for multi-train control and scheduling on railway lines. Transp. Res. Part B Methodol. 2016, 93, 377–393. [Google Scholar] [CrossRef] [Green Version]
- Huisman, T.; Boucherie, R.J. Running times on railway sections with heterogeneous train traffic. Transp. Res. Part B Methodol. 2001, 35, 271–292. [Google Scholar] [CrossRef]
- Sun, H.; Wu, J.; Ma, H.; Yang, X.; Gao, Z. A Bi-objective timetable optimization model for urban rail transit based on the time-dependent passenger volume. IEEE Trans. Intell. Transp. Syst. 2018, 20, 604–615. [Google Scholar] [CrossRef]
- Yuan, J.; Medeossi, G. Statistical analysis of train delays and movements. In Railway Timetabling & Operations; Hansen, I., Pachl, J., Eds.; DVV Media Group Eurail Press: Hamburg, Germany, 2014; pp. 217–236. [Google Scholar]
- Kecman, P.; Goverde, R.M.P. Train delay prediction. In Railway Timetabling & Operations; Hansen, I., Pachl, J., Eds.; DVV Media Group Eurail Press: Hamburg, Germany, 2014; pp. 237–252. [Google Scholar]
- Hu, S.J. The Train Operation Organization and Capacity Theory; China Railway Press: Beijing, China, 1993; pp. 101–162. [Google Scholar]
- Bury, K. Statistical Distributions in Engineering; Cambridge University Press (CUP): Cambridge, UK, 1999; pp. 178–207. [Google Scholar]
- Salido, M.; Barber, F.; Ingolotti, L. Robustness for a single railway line: Analytical and simulation methods. Expert Syst. Appl. 2012, 39, 13305–13327. [Google Scholar] [CrossRef] [Green Version]
- Yuan, J.; Hansen, I.A. Closed form expressions of optimal buffer times between scheduled trains at railway bottlenecks. In Proceedings of the 2008 11th International IEEE Conference on Intelligent Transportation Systems, Beijing, China, 12–15 October 2008; pp. 675–680. [Google Scholar]
- Goverde, R.M.P.; Hansen, I.A.; Hooghiemstra, G.; Lopuhaä, H.P. Delay distributions in railway stations. In Proceedings of the 9th World Conference on Transport Research, Seoul, Korea, 22–27 July 2001. [Google Scholar]
- Yuan, J. Stochastic Modelling of Train Delays and Delay Propagation in Stations; Eburon Uitgeverij BV: Vredenburg, The Netherlands, 2006. [Google Scholar]
- Flier, H.; Gelashvili, R.; Graffagnino, T.; Nunkesser, M. Mining railway delay dependencies in large-scale real-world delay data. In Robust and Online Large-Scale Optimization: Models and Techniques for Transportation Systems; Ahuja, R.K., Möhring, R.H., Zaroliagis, C.D., Eds.; Springer: Berlin, Germany, 2009; pp. 354–368. [Google Scholar]
- Hansen, I.A.; Goverde, R.; Van Der Meer, D.J. Online train delay recognition and running time prediction. In Proceedings of the 13th International IEEE Conference on Intelligent Transportation Systems, Funchal, Portugal, 19–22 September 2010; pp. 1783–1788. [Google Scholar]
- Li, M.-S.; Liu, Z.; Zhang, Y.; Liu, W.; Shi, F. Distribution analysis of train interval journey time employing the censored model with shifting character. J. Appl. Stat. 2016, 44, 1–19. [Google Scholar] [CrossRef]
Station | Arrival Time | Departure Time | Arrival Trips | Departure Trips | Scheduled Arrival Time | Scheduled Departure Time | |
---|---|---|---|---|---|---|---|
1 | North Chibi | 2016/3/12 Saturday 15:50:00 | 2016/3/12 Saturday 15:50:00 | G80 | G80 | 2016/3/12 Saturday 15:50:00 | 2016/3/12 Saturday 15:50:00 |
2 | North Xianning | 2016/3/12 Saturday 16:02:00 | 2016/3/12 Saturday 16:03:00 | G80 | G80 | 2016/3/12 Saturday 16:01:00 | 2016/3/12 Saturday 16:03:00 |
3 | East Wulongquan | 2016/3/12 Saturday 16:14:00 | 2016/3/12 Saturday 16:14:00 | G80 | G80 | 2016/3/12 Saturday 16:13:00 | 2016/3/12 Saturday 16:13:00 |
4 | Wuhan Gaosuchang | 2016/3/12 Saturday 16:27:00 | 2016/3/12 Saturday 16:32:00 | G80 | G80 | 2016/3/12 Saturday 16:28:00 | 2016/3/12 Saturday 16:33:00 |
5 | L1L2 Block Post | 2016/3/12 Saturday 16:37:00 | 2016/3/12 Saturday 16:37:00 | G80 | G80 | 2016/3/12 Saturday 16:38:00 | 2016/3/12 Saturday 16:38:00 |
6 | East Xuchang | 2016/3/12 Saturday 18:07:00 | 2016/3/12 Saturday 18:09:00 | G80 | G80 | 2016/3/12 Saturday 18:07:00 | 2016/3/12 Saturday 18:09:00 |
7 | North Chibi | 2016/3/11 Friday 15:49:00 | 2016/3/11 Friday 15:49:00 | G80 | G80 | 2016/3/11 Friday 15:50:00 | 2016/3/11 Friday 15:50:00 |
8 | North Xianning | 2016/3/11 Friday 16:01:00 | 2016/3/11 Friday 16:02:00 | G80 | G80 | 2016/3/11 Friday 16:01:00 | 2016/3/11 Friday 16:03:00 |
9 | East Wulongquan | 2016/3/11 Friday 16:12:00 | 2016/3/11 Friday 16:12:00 | G80 | G80 | 2016/3/11 Friday 16:13:00 | 2016/3/11 Friday 16:13:00 |
10 | Wuhan Gaosuchang | 2016/3/11 Friday 16:26:00 | 2016/3/11 Friday 16:31:00 | G80 | G80 | 2016/3/11 Friday 16:28:00 | 2016/3/11 Friday 16:33:00 |
11 | L1L2 Block Post | 2016/3/11 Friday 16:36:00 | 2016/3/11 Friday 16:36:00 | G80 | G80 | 2016/3/11 Friday 16:38:00 | 2016/3/11 Friday 16:38:00 |
12 | East Xuchang | 2016/3/11 Friday 18:07:00 | 2016/3/11 Friday 18:09:00 | G80 | G80 | 2016/3/11 Friday 18:07:00 | 2016/3/11 Friday 18:09:00 |
Trips | North Chibi | North Xianning | East Wulongquan | Wuhan Gaosuchang | L1/L2 Block Post | East Hengdian | North Xiaogan | East Xinyang | East Minggang | West Zhumadian | West Luohe | East Xuchang |
---|---|---|---|---|---|---|---|---|---|---|---|---|
G554 | 0 | 0 | 0 | 2 | 1 | 1 | 1 | 2 | 2 | 2 | 1 | 0 |
G580 | 0 | 0 | 0 | 2 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
G546 | 0 | 0 | 0 | 2 | 1 | 1 | 1 | 2 | 2 | 2 | 1 | 2 |
G544 | 0 | 0 | 0 | 2 | 1 | 1 | 1 | 2 | 1 | 2 | 2 | 1 |
Section | Type | Schedule Time (min) | Range | Average (s) | Standard Deviation | Skewness | Kurtosis | ||
---|---|---|---|---|---|---|---|---|---|
North Chibi–North Xianning | (2,2) | 13 | 13 | 25 | 12 | 14.63 | 1.61 | 4.91 | 31.66 |
14 | 14 | 18 | 4 | 14.75 | 0.83 | 1.31 | 5.08 | ||
(2,1) | 10 | 11 | 13 | 2 | 11.44 | 0.56 | 0.72 | 2.43 | |
11 | 11 | 16 | 5 | 11.62 | 0.89 | 1.70 | 6.30 | ||
13 | 11 | 16 | 5 | 11.63 | 0.83 | 2.62 | 14.20 | ||
(1,1) | 8 | 8 | 43 | 35 | 9.05 | 1.74 | 13.70 | 263.56 | |
9 | 8 | 15 | 7 | 9.12 | 1.04 | 1.45 | 5.82 | ||
10 | 8 | 22 | 14 | 9.32 | 1.23 | 3.85 | 32.86 | ||
(1,2) | 11 | 11 | 17 | 6 | 12.41 | 1.13 | 1.55 | 5.94 | |
12 | 10 | 16 | 6 | 12.49 | 1.01 | 1.23 | 4.61 | ||
Wuhan Gaosuchang–L1L2 Block Post | (2,1) | 5 | 4 | 25 | 21 | 5.39 | 0.86 | 6.36 | 111.13 |
6 | 4 | 7 | 3 | 5.08 | 0.43 | 0.64 | 5.97 | ||
(1,1) | 5 | 4 | 13 | 9 | 5.70 | 0.69 | 1.89 | 15.76 | |
L1L2 Block Post–East Hengdian | (1,1) | 3 | 3 | 10 | 7 | 3.94 | 1.09 | 2.60 | 12.36 |
4 | 3 | 25 | 22 | 3.81 | 0.91 | 5.74 | 104.26 | ||
5 | 4 | 8 | 4 | 4.85 | 0.48 | 0.025 | 6.58 | ||
East Hengdian–North Xiaogan | (1,1) | 18 | 17 | 43 | 26 | 18.23 | 1.54 | 6.23 | 57.45 |
19 | 18 | 27 | 9 | 20.02 | 1.43 | 2.22 | 12.00 | ||
(1,2) | 21 | 20 | 32 | 12 | 21.96 | 1.16 | 4.78 | 39.29 | |
22 | 21 | 31 | 10 | 22.50 | 1.46 | 3.38 | 20.52 | ||
North Xiaogan–East Xinyang | (2,2) | 18 | 18 | 27 | 9 | 19.12 | 1.02 | 2.98 | 20.80 |
(2,2) | 15 | 15 | 36 | 21 | 15.65 | 2.06 | 8.24 | 80.04 | |
18 | 18 | 25 | 7 | 18.86 | 1.02 | 3.82 | 24.05 | ||
(1,1) | 13 | 12 | 34 | 22 | 12.93 | 1.41 | 7.94 | 101.72 | |
18 | 12 | 24 | 12 | 13.13 | 1.66 | 4.84 | 31.80 | ||
(1,2) | 16 | 15 | 40 | 25 | 16.66 | 1.49 | 7.06 | 85.55 | |
17 | 15 | 27 | 12 | 17.07 | 1.54 | 3.34 | 19.05 | ||
East Xinyang–East Minggang | (2,2) | 13 | 13 | 19 | 6 | 14.07 | 0.72 | 2.65 | 16.34 |
14 | 14 | 19 | 5 | 14.82 | 0.76 | 2.57 | 15.89 | ||
(2,2) | 10 | 10 | 15 | 5 | 10.80 | 0.62 | 2.33 | 18.06 | |
11 | 10 | 17 | 7 | 11.07 | 1.02 | 3.95 | 21.02 | ||
(1,1) | 8 | 7 | 16 | 9 | 8.01 | 0.77 | 5.17 | 41.73 | |
10 | 11 | 15 | 4 | 11.70 | 0.99 | 2.23 | 8.44 | ||
(1,2) | 13 | 14 | 16 | 2 | 15.05 | 0.73 | -0.08 | 1.91 | |
East Minggang–West Zhumadian | (2,2) | 17 | 16 | 25 | 9 | 18.02 | 0.88 | 4.07 | 32.25 |
18 | 17 | 25 | 8 | 18.52 | 1.01 | 4.29 | 28.86 | ||
(2,1) | 14 | 14 | 23 | 9 | 14.72 | 1.06 | 5.45 | 42.60 | |
(1,1) | 12 | 10 | 26 | 16 | 11.90 | 1.32 | 5.78 | 45.25 | |
13 | 11 | 20 | 9 | 11.58 | 0.87 | 5.39 | 51.25 | ||
14 | 11 | 20 | 9 | 11.67 | 1.20 | 5.62 | 39.79 | ||
(1,2) | 15 | 13 | 26 | 13 | 15.33 | 1.09 | 4.03 | 27.71 | |
16 | 15 | 22 | 7 | 15.72 | 0.98 | 4.45 | 29.80 | ||
West Zhumadian–West Luohe | (2,2) | 18 | 15 | 27 | 12 | 19.12 | 1.14 | 3.08 | 17.23 |
19 | 18 | 19 | 1 | 18.63 | 0.49 | -0.55 | 1.31 | ||
21 | 18 | 24 | 6 | 18.88 | 1.06 | 2.91 | 13.81 | ||
(2,1) | 15 | 13 | 25 | 12 | 15.72 | 1.42 | 3.96 | 22.40 | |
16 | 15 | 24 | 9 | 15.64 | 1.34 | 4.14 | 23.24 | ||
18 | 15 | 24 | 9 | 15.60 | 1.38 | 4.20 | 24.17 | ||
19 | 18 | 41 | 23 | 19.29 | 2.95 | 6.93 | 51.61 | ||
(1,1) | 13 | 10 | 25 | 15 | 13.06 | 1.52 | 5.05 | 34.27 | |
14 | 11 | 23 | 12 | 13.10 | 1.52 | 4.44 | 27.60 | ||
17 | 13 | 18 | 5 | 16.33 | 0.82 | -2.00 | 10.07 | ||
(1,2) | 16 | 14 | 27 | 13 | 16.60 | 1.52 | 3.72 | 20.89 | |
West Luohe–East Xuchang | (2,2) | 16 | 11 | 22 | 11 | 16.39 | 1.20 | -0.07 | 9.01 |
17 | 13 | 23 | 10 | 16.94 | 1.07 | 0.46 | 8.86 | ||
19 | 16 | 21 | 5 | 17.34 | 0.65 | 2.10 | 11.41 | ||
(2,1) | 13 | 10 | 21 | 11 | 13.49 | 1.18 | 2.73 | 15.91 | |
15 | 10 | 20 | 10 | 13.96 | 1.12 | 1.84 | 10.84 | ||
16 | 10 | 19 | 9 | 13.95 | 1.24 | 1.51 | 8.37 | ||
(1,1) | 11 | 7 | 20 | 13 | 10.86 | 1.23 | 3.36 | 23.73 | |
13 | 8 | 20 | 12 | 11.09 | 0.99 | 4.66 | 40.26 | ||
15 | 10 | 18 | 8 | 11.48 | 1.10 | 3.37 | 20.15 | ||
(1,2) | 14 | 10 | 22 | 12 | 14.20 | 1.34 | 2.14 | 15.20 | |
15 | 11 | 21 | 10 | 14.25 | 1.34 | 3.15 | 16.78 | ||
17 | 14 | 23 | 9 | 15.89 | 1.58 | 2.53 | 10.87 |
Section | Dwelling Type | % | Time | Lognormal Distribution | Normal Distribution | Weibull Distribution | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
1th Parameter | 2th Parameter | SRLSM | 1th Parameter | 2th Parameter | SRLSM | 1th Parameter | 2th Parameter | SRLSM | ||||
West Luohe-East Xuchang | (1,1) | 0.03 | 11 | 2.3700 | 0.0688 | 0.4864 | 10.7225 | 0.7596 | 0.4619 | 11.0943 | 8.0244 | 0.4937 |
0.05 | 13 | 2.3957 | 0.0426 | 0.5023 | 10.9862 | 0.4663 | 0.4871 | 11.2102 | 22.9762 | 0.4035 | ||
0.03 | 15 | 2.4270 | 0.0587 | 0.2823 | 11.3438 | 0.6719 | 0.2706 | 11.6679 | 16.5326 | 0.2385 | ||
0.07 | 14 | 2.6492 | 0.0415 | 0.3581 | 14.1552 | 0.5941 | 0.3469 | 14.4509 | 19.3307 | 0.3321 | ||
(1,2) | 0.07 | 15 | 2.6404 | 0.0380 | 0.4224 | 14.0282 | 0.5319 | 0.4092 | 14.2857 | 26.7533 | 0.3281 | |
0.08 | 17 | 2.7421 | 0.0527 | 0.2311 | 15.5410 | 0.8281 | 0.2275 | 15.9460 | 18.9575 | 0.2471 | ||
0.06 | 13 | 2.5881 | 0.0433 | 0.3397 | 13.3172 | 0.5742 | 0.3360 | 13.5899 | 26.5844 | 0.3148 | ||
(2,1) | 0.04 | 15 | 2.6276 | 0.0540 | 0.2341 | 13.8605 | 0.7595 | 0.2197 | 14.2346 | 17.1068 | 0.1882 | |
0.10 | 16 | 2.6266 | 0.0526 | 0.2582 | 13.8459 | 0.7389 | 0.2427 | 14.2119 | 17.1762 | 0.2066 | ||
0.03 | 16 | 2.7944 | 0.0544 | 0.3563 | 16.3769 | 0.8666 | 0.3477 | 16.7550 | 24.0068 | 0.3068 | ||
(2,2) | 0.06 | 17 | 2.8268 | 0.0448 | 0.3969 | 16.9072 | 0.7439 | 0.3845 | 17.2429 | 26.9996 | 0.2959 | |
0.05 | 19 | 2.8503 | 0.0263 | 0.3415 | 17.2990 | 0.4602 | 0.3410 | 17.5377 | 36.6633 | 0.3272 |
Schedule Time (min) | Time Zone | Reliability of West Luohe–East Xuchang | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
(2,2)-Type | (2,1)-Type | (1,2)-Type | (1,1)-Type | |||||||
11 | (11 − 0.5,11 + 0.5) | - | - | - | - | - | ||||
(11 − 1.5,11 + 1.5) | (111.5,11 + 0.5) | - | - | - | - | - | - | 0.918 | 0.887 | |
(11 − 0.5,11 + 1.5) | - | - | - | 0.696 | ||||||
(11−2.5,11 + 2.5) | (11−2.5,11 + 0.5) | - | - | - | - | - | - | 0.959 | 0.921 | |
(11−0.5,11 + 2.5) | - | - | - | 0.703 | ||||||
12 | (12 − 0.5,12 + 0.5) | - | - | - | - | - | ||||
(12 − 1.5,12 + 1.5) | (12 − 1.5,12 + 0.5) | - | - | - | - | - | - | 0.83 | 0.779 | |
(12 − 0.5,12 + 1.5) | - | - | - | 0.22 | ||||||
(12 − 2.5,12 + 2.5) | (12 − 2.5,12 + 0.5) | - | - | - | - | - | - | 0.983 | 0.915 | |
(12 − 0.5,12 + 2.5) | - | - | - | 0.237 | ||||||
13 | (13 − 0.5,13 + 0.5) | - | - | 0.539 | - | 0.026 | ||||
(13 − 1.5,13 + 1.5) | (13 − 1.5,13 + 0.5) | - | 0.944 | 0.592 | - | - | 0.126 | 0.122 | ||
(13 − 0.5,13 + 1.5) | 0.891 | - | 0.03 | |||||||
(13 − 2.5,13 + 2.5) | (13 − 2.5,13 + 0.5) | - | 0.948 | 0.596 | - | - | 0.868 | 0.864 | ||
(13 − 0.5,13 + 2.5) | 0.891 | - | 0.03 | |||||||
14 | (14 − 0.5,14 + 0.5) | - | - | 0.541 | 0.612 | 0.146 | ||||
(14 − 1.5,14 + 1.5) | (14 − 1.5,14 + 0.5) | - | - | 0.935 | 0.918 | 0.895 | 0.693 | 0.5 | 0.396 | |
(14 − 0.5,14 + 1.5) | - | 0.557 | 0.814 | 0.25 | ||||||
(14 − 2.5,14 + 2.5) | (14 − 2.5,14 + 0.5) | - | - | 0.95 | 0.934 | 0.948 | 0.724 | 0.771 | 0.646 | |
(14 − 0.5,14 + 2.5) | - | 0.557 | 0.836 | 0.271 | ||||||
15 | (15 − 0.5,15 + 0.5) | - | - | 0.134 | 0.144 | 0 | ||||
(15 − 1.5,15 + 1.5) | (15 − 1.5,15 + 0.5) | - | - | 0.933 | 0.799 | 0.837 | 0.811 | 0.015 | 0.015 | |
(15 − 0.5,15 + 1.5) | - | 0.609 | 0.17 | 0 | ||||||
(15 − 2.5,15 + 2.5) | (15 − 2.5,15 + 0.5) | - | - | 0.967 | 0.805 | 0.955 | 0.929 | 0.06 | 0.06 | |
(15 − 0.5,15 + 2.5) | - | 0.637 | 0.17 | 0 | ||||||
16 | (16 − 0.5,16 + 0.5) | - | 0.329 | 0.028 | - | - | ||||
(16 − 1.5,16 + 1.5) | (16 − 1.5,16 + 0.5) | 0.889 | 0.417 | 0.157 | 0.136 | - | - | - | - | |
(16 − 0.5,16 + 1.5) | 0.801 | 0.049 | - | - | ||||||
(16 − 2.5,16 + 2.5) | (16 − 2.5,16 + 0.5) | 0.964 | 0.46 | 0.643 | 0.619 | - | - | - | - | |
(16 − 0.5,16 + 2.5) | 0.833 | 0.052 | - | - | ||||||
17 | (17 − 0.5,17 + 0.5) | - | 0.577 | 0.1 | 0.152 | - | ||||
(17 − 1.5,17 + 1.5) | (17 − 1.5,17 + 0.5) | 0.884 | 0.719 | 0.226 | 0.138 | 0.424 | 0.394 | - | - | |
(17 − 0.5,17 + 1.5) | 0.742 | 0.126 | 0.182 | - | ||||||
(17 − 2.5,17 + 2.5) | (17 − 2.5,17 + 0.5) | 0.962 | 0.765 | 0.277 | 0.176 | 0.909 | 0.879 | - | - | |
(17 − 0.5,17 + 2.5) | 0.774 | 0.201 | 0.182 | - | ||||||
18 | (18 − 0.5,18 + 0.5) | - | 0.234 | 0.127 | - | - | ||||
(18 − 1.5,18 + 1.5) | (18 − 1.5,18 + 0.5) | 0.891 | 0.875 | 0.451 | 0.423 | - | - | - | - | |
(18 − 0.5,18 + 1.5) | 0.25 | 0.155 | - | - | ||||||
(18 − 2.5,18 + 2.5) | (18 − 2.5,18 + 0.5) | 0.985 | 0.969 | 0.662 | 0.634 | - | - | - | - | |
(18 − 0.5,18 + 2.5) | 0.25 | 0.155 | - | - | ||||||
19 | (19 − 0.5,19 + 0.5) | - | 0.02 | - | - | - | ||||
(19 − 1.5,19 + 1.5) | (19 − 1.5,19 + 0.5) | 0.304 | 0.304 | - | - | - | - | - | - | |
(19 − 0.5,19 + 1.5) | 0.02 | - | - | - | ||||||
(19 − 2.5,19 + 2.5) | (19 − 2.5,19 + 0.5) | 0.981 | 0.971 | - | - | - | - | - | - | |
(19 − 0.5,19 + 2.5) | 0.03 | - | - | - |
Section | Train Dwelling Type | The Suitable TSSTT (min) |
---|---|---|
North Chibi–North Xianning | (2,2) | 15 |
(2,1) | 11 | |
(1,2) | 11 | |
North Xianning–East Wulongquan | (1,1) | 7 |
(2,1) | 9 | |
East Wulongquan–Wuhan Gaosuchang | (1,1) | 12 |
(1,2) | 13 | |
Wuhan Gaosuchang–L1L2 Block Post | (1,1) (2,1) | 4 6 |
L1L2 Block Post–East Hengdian | (1,1) | 4 |
East Hengdian–North Xiaogan | (1,1) (1,2) | 18 22 |
North Xiaogan–East Xinyang | (1,1) | 13 |
(1,2) | 16 | |
(2,1) | 15 | |
(2,2) | 19 | |
East Xinyang–East Minggang | (1,1) | 8 |
(1,2) | 14 | |
(2,1) | 11 | |
(2,2) | 15 | |
East Minggang–West Zhumadian | (1,1) | 12 |
(1,2) | 15 | |
(2,1) | 15 | |
(2,2) | 18 | |
West Zhumadian–West Luohe | (1,1) | 13 |
(1,2) | 16 | |
(2,1) | 15 | |
(2,2) | 19 | |
West Luohe–East Xuchang | (1,1) | 11 |
(1,2) | 14 | |
(2,1) | 13 | |
(2,2) | 17 |
© 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Share and Cite
Li, M.; Huang, Q.; Yao, L.; Wang, Y. Suitability Evaluation of a Train’s Scheduled Section Travel Time. Sustainability 2020, 12, 2399. https://doi.org/10.3390/su12062399
Li M, Huang Q, Yao L, Wang Y. Suitability Evaluation of a Train’s Scheduled Section Travel Time. Sustainability. 2020; 12(6):2399. https://doi.org/10.3390/su12062399
Chicago/Turabian StyleLi, Maosheng, Qing Huang, Lixuan Yao, and Yongliang Wang. 2020. "Suitability Evaluation of a Train’s Scheduled Section Travel Time" Sustainability 12, no. 6: 2399. https://doi.org/10.3390/su12062399
APA StyleLi, M., Huang, Q., Yao, L., & Wang, Y. (2020). Suitability Evaluation of a Train’s Scheduled Section Travel Time. Sustainability, 12(6), 2399. https://doi.org/10.3390/su12062399