Building Information Modeling Technology Capabilities: Operationalizing the Multidimensional Construct
Abstract
:1. Introduction
2. BIM Technology Capabilities (BIMTC)
2.1. BIM Infrastructure Capabilities
2.2. BIM Collaboration Capabilities
2.3. BIM Expansion Capabilities
3. Research Methodology
3.1. Study 1: Project Generation and Content Adequacy Assessment
3.1.1. Item Generation
3.1.2. Content Adequacy Testing
Sample and Procedure
Analysis and Results
3.2. Study 2: Reliability, Validity, Dimensions, and Factor Structure
3.2.1. Sample and Procedure
3.2.2. Analysis
3.2.3. Dimensions and Factor Structure
Types of Multidimensional Structures
Testing the Multidimensional Structure
4. Discussion
4.1. Key Findings and Contributions
4.2. Limitations and Future Research
5. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- Chen, B.; Liu, A.M.M.; Hua, Y. An exploration of the interaction between BIM technology and the business process of a construction organization in BIM implementation. WIT Trans. Built Environ. 2017, 169, 177–189. [Google Scholar]
- Sacks, R.; Eastman, C.; Lee, G.; Teicholz, P. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors; John Wiley & Sons: Hoboken, NJ, USA, 2011. [Google Scholar]
- Eastman, C. Il BIM: Guida Completa al Building Information Modeling per Committenti, Architetti, Ingegneri, Gestori Immobiliari e Imprese; Hoepli Editore: Milan, Italy, 2016. [Google Scholar]
- Succar, B. Building information modelling framework: A research and delivery foundation for industry stakeholders. Autom. Constr. 2009, 18, 357–375. [Google Scholar] [CrossRef]
- Tan, T.; Chen, K.; Xue, F.; Lu, W. Barriers to Building Information Modeling (BIM) implementation in China’s prefabricated construction: An interpretive structural modeling (ISM) approach. J. Clean. Prod. 2019, 219, 949–959. [Google Scholar] [CrossRef]
- Zhu, J.; Wu, P. BIM/GIS data integration from the perspective of information flow. Autom. Constr. 2022, 136, 104166. [Google Scholar] [CrossRef]
- Deng, M.; Menassa, C.C.; Kamat, V.R. From BIM to digital twins: A systematic review of the evolution of intelligent building representations in the AEC-FM industry. J. Inf. Technol. Constr. 2021, 26, 58. [Google Scholar] [CrossRef]
- Pan, Y.; Zhang, L. Integrating BIM and AI for smart construction management: Current status and future directions. Arch. Comput. Methods Eng. 2023, 30, 1081–1110. [Google Scholar] [CrossRef]
- Kim, T.H.; Woo, W.; Chung, K. 3D Scanning Data Coordination and As-Built-BIM Construction Process Optimization-Utilization of Point Cloud Data for Structural Analysis. Archit. Res. 2019, 21, 111–116. [Google Scholar]
- Law, K.S.; Wong, C.S.; Mobley, W.M. Toward a taxonomy of multidimensional constructs. Acad. Manag. Rev. 1998, 23, 741–755. [Google Scholar] [CrossRef]
- Polites, G.L.; Roberts, N.; Thatcher, J. Conceptualizing models using multidimensional constructs: A review and guidelines for their use. Eur. J. Inf. Syst. 2012, 21, 22–48. [Google Scholar] [CrossRef]
- Wright, R.T.; Campbell, D.E.; Thatcher, J.B.; Roberts, N. Operationalizing multidimensional constructs in structural equation modeling: Recommendations for IS research. Commun. Assoc. Inf. Syst. 2012, 30, 23. [Google Scholar] [CrossRef]
- Giel, B.; McCuen, T. MINIMUM BIM, Proposed Revision-NBIMS v3; The Whiting-Turner Contracting Company: Baltimore, MD, USA; Tamera McCuen University of Oklahoma: Oklahoma City, OK, USA, 2014. [Google Scholar]
- Wu, C.; Xu, B.; Mao, C.; Li, X. Overview of BIM maturity measurement tools. J. Inf. Technol. Constr. (ITcon) 2017, 22, 34–62. [Google Scholar]
- Alankarage, S.; Chileshe, N.; Samaraweera, A.; Rameezdeen, R.; Edwards, D.J. Organisational BIM maturity models and their applications: A systematic literature review. Archit. Eng. Des. Manag. 2022, 1–19. [Google Scholar] [CrossRef]
- Adekunle, S.A.; Aigbavboa, C.; Ejohwomu, O.; Ikuabe, M.; Ogunbayo, B. A Critical Review of Maturity Model Development in the Digitisation Era. Buildings 2022, 12, 858. [Google Scholar] [CrossRef]
- Liu, B.; Wang, M.; Zhang, Y.; Liu, R.; Wang, A. Review and prospect of BIM policy in China. In Proceedings of the IOP Conference Series: Materials Science and Engineering, Busan, Republic of Korea, 25–27 August 2017; IOP Publishing: Bristol, UK, 2017; Volume 245, p. 022021. [Google Scholar]
- Herr, C.M.; Fischer, T. BIM adoption across the Chinese AEC industries: An extended BIM adoption model. J. Comput. Des. Eng. 2019, 6, 173–178. [Google Scholar] [CrossRef]
- Huang, M.; Ahn, J.H.; Lee, D. A new perspective on IT capabilities and firm performance: Focusing on dual roles of institutional pressures. Asia Pac. J. Inf. Syst. 2014, 24, 1–29. [Google Scholar] [CrossRef]
- Olowa, T.; Witt, E.; Morganti, C.; Teittinen, T.; Lill, I. Defining a BIM-Enabled Learning Environment—An Adaptive Structuration Theory Perspective. Buildings 2022, 12, 292. [Google Scholar] [CrossRef]
- Volk, R.; Stengel, J.; Schultmann, F. Building Information Modeling (BIM) for existing buildings—Literature review and future needs. Autom. Constr. 2014, 38, 109–127. [Google Scholar] [CrossRef]
- Ku, K.; Mahabaleshwarkar, P.S. Building interactive modeling for construction education in virtual worlds. Electron. J. Inf. Technol. Constr. 2011, 16, 189–208. [Google Scholar]
- Bharadwaj, A.; Sambamurthy, V.; Zmud, R. IT capabilities: Theoretical perspectives and empirical operationalization. In Proceedings of the 20th International Conference on Information Systems, Charlotte, NC, USA, 13–15 December 1999. [Google Scholar]
- Porte, M.E. Technology and competitive advantage. J. Bus. Strategy 1985, 5, 60–78. [Google Scholar] [CrossRef]
- Bhatt, G.D.; Grover, V. Types of information technology capabilities and their role in competitive advantage: An empirical study. J. Manag. Inf. Syst. 2005, 22, 253–277. [Google Scholar] [CrossRef]
- Fink, L. How do IT capabilities create strategic value? Toward greater integration of insights from reductionistic and holistic approaches. Eur. J. Inf. Syst. 2011, 20, 16–33. [Google Scholar] [CrossRef]
- Erkmen, T.; Günsel, A.; Altındağ, E. The role of innovative climate in the relationship between sustainable IT capability and firm performance. Sustainability 2020, 12, 4058. [Google Scholar] [CrossRef]
- Arayici, Y.; Coates, P.; Koskela, L.; Kagioglou, M.; Usher, C.; O’Reilly, K. Technology adoption in the BIM implementation for lean architectural practice. Autom. Constr. 2011, 20, 189–195. [Google Scholar] [CrossRef]
- Afsari, K.; Eastman, C.M.; Shelden, D.R. Cloud-based BIM data transmission: Current status and challenges. In Proceedings of the ISARC International Symposium on Automation and Robotics in Construction, Auburn, AL, USA, 18–21 July 2016; IAARC Publications: Cambridge, UK, 2016; Volume 33, p. 1. [Google Scholar]
- Reizgevičius, M.; Ustinovičius, L.; Cibulskienė, D.; Kutut, V.; Nazarko, L. Promoting sustainability through investment in Building Information Modeling (BIM) technologies: A design company perspective. Sustainability 2018, 10, 600. [Google Scholar] [CrossRef]
- Reza, H.M.; Pärn, E.A.; Edwards, D.J.; Oraee, M. Roadmap to mature BIM use in Australian SMEs: Competitive dynamics perspective. J. Manag. Eng. 2018, 34, 05018008. [Google Scholar] [CrossRef]
- Carr, N.G. IT doesn’t matter. Educ. Rev. 2003, 38, 24–38. [Google Scholar] [CrossRef]
- King, W.R. IT capabilities, business processes, and impact on the bottom line. In IS Management Handbook; Auerbach Publications: Boca Raton, FL, USA, 2003; pp. 41–44. [Google Scholar]
- Mehrbod, S.; Staub-French, S.; Mahyar, N.; Tory, M. Beyond the clash: Investigating BIM-based building design coordination issue representation and resolution. J. Inf. Technol. Constr. 2019, 24, 33. [Google Scholar]
- Chahrour, R.; Hafeez, M.A.; Ahmad, A.M.; Sulieman, H.I.; Dawood, H.; Rodriguez-Trejo, S.; Kassem, M.; Naji, K.K.; Dawood, N. Cost-benefit analysis of BIM-enabled design clash detection and resolution. Constr. Manag. Econ. 2021, 39, 55–72. [Google Scholar] [CrossRef]
- Gade, P.N.; Svidt, K. Exploration of practitioner experiences of flexibility and transparency to improve BIM-based model checking systems. J. Inf. Technol. Constr. 2021, 26, 1041–1060. [Google Scholar] [CrossRef]
- Panteli, C.; Kylili, A.; Fokaides, P.A. Building information modelling applications in smart buildings: From design to commissioning and beyond A critical review. J. Clean. Prod. 2020, 265, 121766. [Google Scholar] [CrossRef]
- Bozoglu, J. Collaboration and coordination learning modules for BIM education. J. Inf. Technol. Constr. 2016, 21, 152–163. [Google Scholar]
- Schiavi, B.; Havard, V.; Beddiar, K.; Baudry, D. BIM data flow architecture with AR/VR technologies: Use cases in architecture, engineering and construction. Autom. Constr. 2022, 134, 104054. [Google Scholar] [CrossRef]
- Xie, M.; Qiu, Y.; Liang, Y.; Zhou, Y.; Liu, Z.; Zhang, G. Policies, applications, barriers and future trends of building information modeling technology for building sustainability and informatization in China. Energy Rep. 2022, 8, 7107–7126. [Google Scholar] [CrossRef]
- Chan, D.W.M.; Olawumi, T.O.; Ho, A.M.L. Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: The case of Hong Kong. J. Build. Eng. 2019, 25, 100764. [Google Scholar] [CrossRef]
- Huang, B.; Lei, J.; Ren, F.; Chen, Y.; Zhao, Q.; Li, S.; Lin, Y. Contribution and obstacle analysis of applying BIM in promoting green buildings. J. Clean. Prod. 2021, 278, 123946. [Google Scholar] [CrossRef]
- Mehrbod, S.; Staub-French, S.; Tory, M. BIM-based building design coordination: Processes, bottlenecks, and considerations. Can. J. Civ. Eng. 2020, 47, 25–36. [Google Scholar] [CrossRef]
- Hinkin, T.R. A review of scale development practices in the study of organizations. J. Manag. 1995, 21, 967–988. [Google Scholar] [CrossRef]
- Schriesheim, C.A.; Powers, K.J.; Scandura, T.A.; Gardiner, C.C.; Lankau, M.J. Improving construct measurement in management research: Comments and a quantitative approach for assessing the theoretical content adequacy of paper-and-pencil survey-type instruments. J. Manag. 1993, 19, 385–417. [Google Scholar] [CrossRef]
- Fornell, C.; Larcker, D.F. Evaluating structural equation models with unobservable variables and measurement errors. J. Mark. Res. 1981, 18, 39–50. [Google Scholar] [CrossRef]
- Hair, J.F.; Sarstedt, M.; Ringle, C.M.; Gudergan, S.P. Advanced Issues in Partial Least Squares Structural Equation Modeling; SAGE Publications: Thousand Oaks, CA, USA, 2017. [Google Scholar]
- Jarvis, C.B.; MacKenzie, S.B.; Podsakoff, P.M. A critical review of construct indicators and measurement model misspecification in marketing and consumer research. J. Consum. Res. 2003, 30, 199–218. [Google Scholar] [CrossRef]
- Diamantopoulos, A.; Winklhofer, H.M. Index construction with formative indicators: An alternative to scale development. J. Mark. Res. 2001, 38, 269–277. [Google Scholar] [CrossRef]
- Chin, W.W. The partial least squares approach to structural equation modeling. Mod. Methods Bus. Res. 1998, 295, 295–336. [Google Scholar]
- Ringle, C.M.; Sarstedt, M.; Straub, D.W. Editor’s comments: A critical look at the use of PLS-SEM in “MIS Quarterly”. MIS Q. 2012, 36, iii–xiv. [Google Scholar] [CrossRef]
- Sarstedt, M.; Hair, J.F., Jr.; Cheah, J.H.; Becker, J.M.; Ringle, C.M. How to specify, estimate, and validate higher-order constructs in PLS-SEM. Australas. Mark. J. 2019, 27, 197–211. [Google Scholar] [CrossRef]
- Hunter, J.E. Unidimensional measurement, second-order factor analysis, and causal models. Res. Organ. Behav. 1982, 4, 267–299. [Google Scholar]
- Bagozzi, R.P.; Edwards, J.R. A general approach for representing constructs in organizational research. Organ. Res. Methods 1998, 1, 45–87. [Google Scholar] [CrossRef]
- Gefen, D.; Straub, D.; Boudreau, M.C. Structural equation modeling and regression: Guidelines for research practice. Commun. Assoc. Inf. Syst. 2000, 4, 7. [Google Scholar] [CrossRef]
- Anderson, J.C.; Gerbing, D.W. Structural equation modeling in practice: A review and recommended two-step approach. Psychol. Bull. 1988, 103, 411. [Google Scholar] [CrossRef]
Indicators of BIM Technology Capabilities | Derived from the Literature (Olowa et al., 2022) [20] | Derived from Interviews | |
---|---|---|---|
1 | BIM model viewing. | The ability to visually inspect components in the model. | - |
2 | Capabilities to input, access, and extract BIM model data. | Availability of input data in the model, accessible to users and easily extractable. | Data handling and data transmission. |
3 | BIM model sharing. | Capabilities to share the model for communication and collaboration purposes. | Enhancing communication effectiveness by adding annotation and navigation tools around the model. Adding view linking functionality around the model. |
4 | BIM model version management. | Ability to track and manage different versions of BIM models. | Software version compatibility; synchronization and interoperability among multiple forms of software. |
5 | BIM model editing. | Meaningful data input into the model is necessary. | Low modeling efficiency. |
6 | BIM model collaborative viewing and editing. | Collaborative viewing and editing of the model, ideally utilizing collaborative viewing and editing features in team collaboration. | Collaboration using a central file and work sets. Issues with assigning permissions for collaborative design. |
7 | Repository of example BIM models. | Capabilities to accommodate a repository or database for storing high-quality, consistent, and error-free models. | Product industry libraries. Cloud storage and local storage. |
8 | Common Data Environment (CDE) for project data/Multi-software Interoperability Environment. | Ability to host project data consistently and persistently. Project data are not limited to data incorporated into the BIM model. Therefore, a common data environment is a necessary attribute. | Data barriers among multiple forms of software; preserving information after importing software to ensure model continuity; data interfaces that can integrate multiple forms of software. |
9 | Simulation of the project development process (realistic BIM workflow, key stakeholder roles, etc.). | Ability to simulate real-life project development processes, serving the roles of relevant stakeholders and BIM-based workflows. | Clear milestones, complete documentation, explicit requirements, and comprehensive records in the collaborative process. |
10 | BIM model creating. | Capabilities to create BIM models. | Refining modeling to improve modeling efficiency. |
11 | BIM model checking. | Ability to perform process and model standard checks on BIM models. | Adding generic nodes and rule checks for automated model validation. |
12 | Capabilities to integrate other advanced technologies (extended reality, artificial intelligence, Internet of Things, etc.). | Integration of extended reality features: Augmented Reality (AR), Mixed Reality (MR), Virtual Reality (VR). | Integration of BIM with GIS; integration of BIM with AI; digital twin combining BIM and the Internet of Things (IoT). |
13 | BIM object creation and editing. | Creation and editing of BIM components. | Bringing together individuals with different specialties and backgrounds based on project requirements. |
14 | Group formation (Different majors and backgrounds). | Stakeholders can collaborate in creating group work. | Communication features integrating the functionality of WeChat documents. |
15 | Collaboration in groups (communication and cooperation within the team). | Capabilities to create and manage teams, enabling communication and collaboration within the team. | Face-to-face communication. |
16 | Collaboration between groups (interaction and cooperation between teams). | Possibility for communication and interaction among the working or learning community, where stakeholders engage in interactions for project development. | Real-time collaboration, real-time updates, real-time visualization of results are required. Implementation of clash detection; communication challenges when dealing with a large number of people; real-time information sharing with high-quality data exchange; the need for quick file updates and iterations. |
17 | Instructor access and monitoring of groups and group work. | Capabilities to create teaching permissions for access and group work monitoring, where instructors interact with teams and individuals. | Permission issues in collaborative work sets; software permission problems. |
18 | Collaborative viewing and editing of documents and spreadsheets. | Collaborative viewing and editing of documents and spreadsheets (not just limited to BIM models) are crucial for executing learning tasks within a group. | - |
19 | Live interactions between users. | Ability to engage in real-time interactions with users, enhancing the convenience and time efficiency of teaching and group work. | Enhancement of interaction through features like WeChat voice calls; addition of view linking functionality; inclusion of annotation and navigation tools to directly locate model issues and improve communication effectiveness. |
20 | Capabilities to record group meetings and courses/Ability to record informal communication | Capabilities to record group meetings and courses. | Lack of archiving in communication processes. |
21 | Registration of users (learners/instructors). | Ability to register and unregister users. | Authentication of different stakeholders’ identities. |
22 | Data security/password protection. | Capacity to protect user data and information, especially data and information related to registered users and their activities. | Concerns about the risk of damaging the shared master files. |
23 | Capabilities to host multiple courses or promote multiple projects simultaneously. | Capabilities to host multiple courses. | Platform’s model hosting capacity, software’s information hosting capabilities; capacity to handle and store information. |
24 | File upload, storage, download, sharing, editing. | File format conversion. | |
25 | Video playback. | Ability to play course content videos and access external (video) materials. | - |
26 | Capabilities to link to additional learning materials or other professional information. | Capabilities to link to additional learning materials, including course content and access to various materials. | Ability to accommodate large amounts of data, extensive information; drawbacks of linking; digital assets. |
27 | Individual learners’ storage for learning materials. | Ability to allow individual learners to store learning materials. | - |
28 | Capabilities to link various courses or projects together. | Ability to connect multiple courses to reinforce the outcomes of previous courses and track the impact on future course engagement. | Learning from completed projects or transferring knowledge to new projects. |
29 | Assessment/grading. | Capabilities to assess and grade learners—inputting scores for individuals/groups, grade book—for learning management, quality, and learner assessment purposes. | - |
30 | Questionnaire creation, completion, submission. | Creation and analysis of questionnaires, quizzes, and surveys. | - |
31 | Student feedback. | Ability to gather feedback from users and learners for quality assurance and improvement purposes. | - |
32 | Gamification support. | Capabilities to integrate gamification features, combining elements of gaming. Enhancing competition as a way to motivate learners—high scores/leaderboards, etc. | - |
33 | Integration of platform with external systems/business. | Ability to integrate with external platforms—for example, integration with institutional research information systems. | Integration with enterprise management platform. |
34 | Capabilities of lightweight BIM operation. | Web-based lightweight platform; cloud-based platform. | |
35 | Capabilities of conducting post-model generation sustainability analysis. | Green building analysis, cost analysis, carbon emissions, emergency evacuation simulation, etc. |
Sub-Dimension | Item Number | BIM Technology Capabilities Indicator | Factor Loading | |
---|---|---|---|---|
BIM Technology Capabilities (BIMTC) | BIM Infrastructure Capabilities (BIC) | 3# | Capabilities to share the model for communication and collaboration purposes | 0.795 |
4# | Capabilities to track and manage different versions of BIM models | 0.772 | ||
5# | Capacity to edit the BIM model | 0.867 | ||
6# | Capabilities for collaborative viewing and editing of models | 0.785 | ||
7# | Repository of example BIM models | 0.819 | ||
8# | Common Data Environment (CDE) for project data/Multi-software Interoperability Environment | 0.811 | ||
BIM Collaboration Capabilities (BCC) | 14# | capabilities for Group formation | 0.912 | |
15# | Ability to collaborate within a group | 0.928 | ||
16# | Ability to collaborate between groups | 0.918 | ||
17# | Instructor access and monitoring of groups and group work | 0.857 | ||
19# | Ability to engage in real-time interactions with users | 0.833 | ||
34# 1 | Capabilities of lightweight BIM operation | |||
BIM Expansion Capabilities (BEC) | 20# | Capabilities to record group meetings and courses /Ability to record informal communication | 0.798 | |
23# | Capabilities to host multiple courses or promote multiple projects simultaneously | 0.833 | ||
26# | Capabilities to link to additional learning materials or other professional information | 0.872 | ||
27# | Ability to allow individual learners to store learning materials | 0.826 | ||
28# | Capabilities to link various courses or projects together | 0.894 | ||
29# | Ability to assess and grade learners | 0.855 | ||
35# 1 | Capabilities for conducting post-model generation sustainability analysis |
CMIN/DF | TLI | CFI | RMR | RESEM | |
---|---|---|---|---|---|
Actual Value | 1.673 | 0.964 | 0.970 | 0.064 | 0.088 |
Fit Value | <3 | ≥0.9 | ≥0.9 | <0.08 | <0.1 |
Potential Construction | Path | Items | Std. | p | CR | AVE |
---|---|---|---|---|---|---|
BIM Infrastructure Capabilities (BIC) | bic1←BIC | Capabilities to share the model for communication and collaboration purposes | 0.938 | *** | 0.979 | 0.885 |
bic2←BIC | Capabilities to track and manage different versions of BIM models | 0.951 | *** | |||
bic3←BIC | Capacity to edit BIM model | 0.944 | *** | |||
bic4←BIC | Capabilities for collaborative viewing and editing of models | 0.927 | *** | |||
bic5←BIC | Repository of example BIM models | 0.953 | *** | |||
bic6←BIC | Common Data Environment (CDE) for project data/Multi-software Interoperability Environment | 0.930 | *** | |||
BIM Collaboration Capabilities (BCC) | bcc1←BCC | Capabilities for Group formation | 0.927 | *** | 0.978 | 0.882 |
bcc2←BCC | Ability to collaborate within a group | 0.917 | *** | |||
bcc3←BCC | Ability to collaborate between groups | 0.940 | *** | |||
bcc4←BCC | Instructor access and monitoring of groups and group work | 0.925 | *** | |||
bcc5←BCC | Ability to engage in real-time interactions with users | 0.960 | *** | |||
bcc6←BCC | Capabilities of lightweight BIM operation | 0.965 | *** | |||
BIM Expansion Capabilities (BEC) | bec2←BEC | Capabilities to host multiple courses or promote multiple projects simultaneously | 0.956 | *** | 0.968 | 0.859 |
bec3←BEC | Capabilities to link to additional learning materials or other professional information | 0.863 | *** | |||
bec4←BEC | Ability to allow individual learners to store learning materials | 0.947 | *** | |||
bec5←BEC | Capabilities to link various courses or projects together | 0.939 | *** | |||
bec7←BEC | Capabilities for conducting post-model generation sustainability analysis | 0.926 | *** |
BIC | BCC | BEC | |
---|---|---|---|
BIC | 0.941 | ||
BCC | 0.895 | 0.939 | |
BEC | 0.780 | 0.883 | 0.927 |
High-Order Construction | First-Order Construction | Form | Index | Factor Loading | Cronbach’s α | CR | AVE |
---|---|---|---|---|---|---|---|
BIM Technology Capabilities | Reflective | 0.986 | 0.987 | 0.796 | |||
BIM Infrastructure Capabilities (BIC) | Reflective | bic1 | 0.950 | 0.979 | 0.983 | 0.904 | |
bic2 | 0.958 | ||||||
bic3 | 0.954 | ||||||
bic4 | 0.940 | ||||||
bic5 | 0.961 | ||||||
bic6 | 0.941 | ||||||
BIM Collaboration Capabilities (BCC) | Reflective | bcc1 | 0.955 | 0.980 | 0.984 | 0.909 | |
bcc2 | 0.949 | ||||||
bcc3 | 0.950 | ||||||
bcc4 | 0.943 | ||||||
bcc5 | 0.961 | ||||||
bcc6 | 0.963 | ||||||
BIM Expansion Capabilities (BEC) | Reflective | bec2 | 0.954 | 0.970 | 0.977 | 0.894 | |
bec3 | 0.916 | ||||||
bec4 | 0.956 | ||||||
bec5 | 0.943 | ||||||
bec7 | 0.958 |
High-Order Construction | First-Order Construction | Index | BIMTC | BIC | BCC | BEC |
---|---|---|---|---|---|---|
BIM Technology Capabilities (BIMTC) | BIM Infrastructure Capabilities (BIC) | bic1 | 0.856 | 0.950 | 0.811 | 0.654 |
bic2 | 0.886 | 0.958 | 0.845 | 0.700 | ||
bic3 | 0.897 | 0.954 | 0.838 | 0.751 | ||
bic4 | 0.881 | 0.940 | 0.839 | 0.722 | ||
bic5 | 0.901 | 0.961 | 0.848 | 0.734 | ||
bic6 | 0.877 | 0.941 | 0.820 | 0.719 | ||
BIM Collaboration Capabilities (BCC) | bcc1 | 0.912 | 0.831 | 0.955 | 0.794 | |
bcc2 | 0.907 | 0.826 | 0.949 | 0.782 | ||
bcc3 | 0.914 | 0.835 | 0.950 | 0.803 | ||
bcc4 | 0.922 | 0.826 | 0.943 | 0.828 | ||
bcc5 | 0.948 | 0.856 | 0.961 | 0.853 | ||
bcc6 | 0.928 | 0.843 | 0.963 | 0.811 | ||
BIM Expansion Capabilities (BEC) | bec2 | 0.905 | 0.747 | 0.847 | 0.954 | |
bec3 | 0.805 | 0.631 | 0.737 | 0.916 | ||
bec4 | 0.894 | 0.730 | 0.828 | 0.956 | ||
bec5 | 0.886 | 0.728 | 0.815 | 0.943 | ||
bec7 | 0.871 | 0.706 | 0.794 | 0.958 |
BIC | BCC | BEC | |
---|---|---|---|
BIC | 0.951 | ||
BCC | 0.895 | 0.953 | |
BEC | 0.769 | 0.872 | 0.946 |
High-Order Construction | First-Order Construction | Factor Loading | T-Value | Confidence Intervals (Bias Corrected) | R-Square | Sig. | |
---|---|---|---|---|---|---|---|
2.50% | 97.50% | ||||||
BIMTC | BIC | 0.938 | 28.103 | 0.847 | 0.977 | 0.880 | 0.000 |
BCC | 0.971 | 104.726 | 0.947 | 0.985 | 0.942 | 0.000 | |
BEC | 0.911 | 26.936 | 0.814 | 0.955 | 0.830 | 0.000 |
CMIN/DF | TLI | CFI | RMR | RESEM | |
---|---|---|---|---|---|
Single-Factor Model | 4.813 | 0.798 | 0.828 | 0.174 | 0.209 |
Two-Factor Model | 3.155 | 0.886 | 0.904 | 0.151 | 0.157 |
Two-Factor Model | 4.032 | 0.840 | 0.865 | 0.210 | 0.187 |
Two-Factor Model | 2.921 | 0.898 | 0.914 | 0.118 | 0.149 |
Three-Factor Model | 1.673 | 0.964 | 0.970 | 0.064 | 0.088 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Cao, H.; Huang, M. Building Information Modeling Technology Capabilities: Operationalizing the Multidimensional Construct. Sustainability 2023, 15, 14755. https://doi.org/10.3390/su152014755
Cao H, Huang M. Building Information Modeling Technology Capabilities: Operationalizing the Multidimensional Construct. Sustainability. 2023; 15(20):14755. https://doi.org/10.3390/su152014755
Chicago/Turabian StyleCao, Haiyun, and Minghao Huang. 2023. "Building Information Modeling Technology Capabilities: Operationalizing the Multidimensional Construct" Sustainability 15, no. 20: 14755. https://doi.org/10.3390/su152014755
APA StyleCao, H., & Huang, M. (2023). Building Information Modeling Technology Capabilities: Operationalizing the Multidimensional Construct. Sustainability, 15(20), 14755. https://doi.org/10.3390/su152014755