Bus-Passenger-Flow Prediction Model Based on WPD, Attention Mechanism, and Bi-LSTM
Next Article in Special Issue
Impact of Transportation Costs on the Establishment of an Industrial Symbiosis Network
Previous Article in Journal
Soil Water Retention and Pore Characteristics of Intact Loess Buried at Different Depths
Previous Article in Special Issue
Online Delivery Problem for Hybrid Truck–Drone System with Independent and Truck-Carried Drones
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

A Simulation-Based Experimental Design for Analyzing Energy Consumption and Order Tardiness in Warehousing Systems

1
Department of Industrial & Management Systems Engineering, Kyung Hee University, Yongin-si 17104, Republic of Korea
2
Department of Mechanical and Industrial Engineering, Louisiana State University, Baton Rouge, LA 70803, USA
*
Author to whom correspondence should be addressed.
Sustainability 2023, 15(20), 14891; https://doi.org/10.3390/su152014891
Submission received: 17 September 2023 / Revised: 9 October 2023 / Accepted: 12 October 2023 / Published: 15 October 2023
(This article belongs to the Special Issue Green Logistics and Intelligent Transportation)

Abstract

:
For warehouses to be more sustainable and cost-effective, it is essential to consider energy consumption (EC) and order tardiness (OT) together in evaluating warehouse activities since improving both EC and OT at the same time is very demanding. While existing studies try to improve EC and OT, the current studies consider only either a reserve area or a forward area between the two major warehouse areas. Thus, this study proposes a simulation-based approach to assessing EC and OT when reserve and forward areas are considered together in one framework for different configurations of five important warehousing parameters: (i) number of forklifts, (ii) number of storage/retrieval (S/R) machines, (iii) number of automated storage/retrieval systems (AS/RS) input/output (I/O) points, (iv) order size, and (v) proportions of order flows through a reserve or forward area. In particular, we use real forklift movement and energy data for our simulation models to provide a more realistic analysis. By building the simulation model with the 25 full factorial experimental design, we analyze the results with analysis of variance (ANOVA). The resulting Pareto-optimal solutions show that less traffic flows through a reserve area can help improve both EC and OT while other factors have smaller or limited effects on the two responses. Also, the order flow factor has the largest effect on EC while order size has the largest effect on OT. The results from this study can help warehouse operators make informed decisions in considering and finding a trade-off between sustainability and customer satisfaction.

1. Introduction

Due to the recent expansion of e-commerce, fast warehousing and fulfillment are catching more attention than before, and both customers and warehouse operators want to avoid order tardiness (OT) and uncertainty as much as possible [1,2]. At the same time, energy consumption (EC) becomes an important aspect of warehousing to consider as sustainable aspects of warehousing are highlighted [2,3,4]. While EC and OT are worth improving in warehouses, it is a challenging task to improve these targets simultaneously; a reduction in EC can deteriorate OT whereas a decrease in OT is likely to increase EC and relevant costs. Thus, EC and OT in warehouses need to be studied and improved in one integrated framework.
Generally, a warehouse consists of two main functional areas: (i) a reserve area and (ii) a forward area [5,6]. This fact suggests that these two major warehouse areas need to be considered to make the best operational decisions for improving EC and OT. Most current relevant studies, however, focus just on either a reserve area or a forward area, implying that existing relevant studies are somehow insufficiently developed. Accordingly, interactions among these two areas have not been thoroughly studied for EC and OT. Thus, to identify significant warehouse operational factors and examine their individual or combined effects on EC and OT, a new study needs to be performed by integrating reserve and forward areas so that we can consider most warehouse activities. For these purposes, a simulation study is useful since we can test various configurations of warehouse factors and parameters by checking the effects of the factors on OT and EC as well as the trade-off of the two targets [7,8].

2. Literature Review

Warehousing is the process of temporarily storing stock-keeping units (SKUs) between suppliers (manufacturers), and consumers; its main activities include retrieving, put-away, replenishment, order picking, sortation, cross-docking, and shipping [6]. Receiving is to unload SKUs at inbound decks, inspect the SKUs, and update the inventory records. Put-away is to transfer the SKUs between different areas. Replenishment is to move the SKUs from a reserve area to a forward area. Order picking is to retrieve distinct SKUs from storage locations. Sortation is to group customer orders that have been picked in different batches. Packing is to put the sorted customer orders into a container. Cross-docking is to transfer SKUs directly from inbound to outbound decks. Shipping is to inspect the packed customer orders, update the inventory records, and load the packed customer orders at the outbound decks. All these activities can be classified into four flows [5,6]: Flow 1 (receiving–cross-docking–shipping), Flow 2 (receiving–reserve area–shipping), Flow 3 (receiving–reserve area–forward area–shipping), and Flow 4 (receiving–forward area–shipping). These warehouse areas, flows, and activities are also visually introduced in Figure 1.
Among various warehouse activities, order picking is the most expensive activity in terms of EC and OT, and human- or automated machine-based order picking systems are used in a warehouse [6,9]. Among a variety of order-picking systems, two typical order-picking systems are (i) parts-to-picker and (ii) picker-to-parts systems. More specifically, an automated storage/retrieval system (AS/RS) is typically used for a parts-to-picker system, and forklifts can be used for all warehouse areas, including a picker-to-parts system. Thus, we can focus on the activities of AS/RS and forklifts in picker-to-part and part-to-picker systems to investigate EC and OT for warehouse operations.
A reserve area is usually occupied by parts-to-picker systems such as AS/RS. AS/RS uses various computer-controlled systems to automatically store and retrieve unit loads and can store and retrieve unit loads. The movement and travel time of the AS/RS crane or storage and retrieval (S/R) machine and picking time can directly decide AS/RS EC and OT [10,11]. Different types of AS/RS show different energy effectiveness in warehouse systems [12,13,14,15]. Various AS/RS types can be recognized in the warehouse industry according to the S/R machines, handling, and rack properties in the system. Among different types of AS/RS, autonomous vehicle storage and retrieval systems (AVS/RS) have been broadly considered in the literature since these systems provide desirable flexibility by changing the number of vehicles to deal with the fluctuation in warehouse demand [7]. Besides, different AVS/RS designs such as shuttle-based storage and retrieval systems (SBS/RS) have been studied in the literature [8]. A basic AS/RS includes single-deep stationary racks in which S/R machines can directly store or retrieve unit loads. In some cases, a part of a unit load is considered for which a person can stand on an S/R machine to retrieve the required number of SKUs from the rack storage location. AS/RS can also bring the unit loads at the input/output (I/O) point by aisle-bound S/R machines, and pickers take the required number of SKUs; then, unneeded SKUs are returned to the storage location. A typical AS/RS handles one unit load (usually, in pallet size) at a time by a single shuttle on one S/R machine; an S/R machine is not able to change its aisle (aisle-captive type). For our study, this general type of AS/RS is considered since it is widely used.
Generally, a forward area is used for supporting order-picking activities and for storing fast-moving items that do not require a large amount of space in racks or on a floor [5,16]. Typically, a forward area is occupied by a picker-to-part system, where order picking equipment or people drive or walk along the aisles to pick items. Activities of a picker-to-part system can be classified into two types: low-level and high-level pickings. For low-level pickings, order pickers pick items from storage racks and bins while picking items from high storage racks for high-level pickings [6]. Since forklifts are typically used for order-picking activities, studies of forklifts will play a key role in EC and OT analysis in a warehouse forward area [17]. In addition, more than 60% of forklifts are powered by electricity, and therefore, the research focus needs to be on electric forklifts rather than on propane or diesel forklifts [9]. We also consider only electric forklifts in this study.
Forklifts and AS/RS are the most typical equipment and tools for warehouse forward and reserve areas, and their performance in terms of EC and OT is not independent of each other. This interdependency is observed when loads are handled by forklifts or other material handling equipment at AS/RS I/O points from a reserve area to other warehouse areas [18]. Flow 3 in Figure 1 shows this interdependency more specifically; Flow 3 accounts for a large material proportion, and the unit loads are always needed to replenish the picker-to-parts system in a forward area. This fact suggests that the parts-to-picker (reserve area) and picker-to-parts (forward area) systems influence each other in affecting EC and OT. For example, a delay in the parts-to-picker system can cause a subsequent delay in the picker-to-parts system, and forklift issues in the picker-to-parts system can result in another issue in the parts-to-picker system. Thus, a comprehensive analysis to identify significant factors and their interactions in both parts-to-picker (reserve area) and picker-to-parts systems (forward area) needs to be conducted.
Since interdependency between parts-to-picker and picker-to-parts systems can be observed at AS/RS I/O points, it is necessary to analyze the direct effects of buffer capacity (that is, the number of designed AS/RS I/O points) on EC and OT. A variety of factors including order size and the number of forklifts and S/R machines are also crucial in investigating EC and OT for both warehouse areas, simultaneously. Moreover, other warehouse activities such as cross-docking, put-away, and replenishment under different warehouse flows are also related to both picker-to-parts and parts-to-picker systems in affecting EC and OT. Thus, warehouse flow rates, which reflect different proportions among the four warehouse activities in Figure 1, are also required to be studied when we consider EC and OT. Overall, we can consider the following five important factors: (i) the number of forklifts, (ii) the number of S/R machines, (iii) the I/O buffer capacity of the AS/RS, (iv) the order size, and (v) the warehouse flow rate.
The number of energy-aware warehouse studies has increased in the recent literature, and energy saving of material handling equipment has been receiving as much attention as other energy-aware warehouse topics such as building, lighting, and HVAC [2,4]. A comprehensive literature review of the EC of material handling equipment was provided in a survey by the study in [19]. The analysis of this review shows that the analytical and simulation methodologies have been considered much more than the methodologies supported by empirical data [10]. In some cases, mathematical optimization models may cause significant errors in interpreting the performance of warehouse systems since they usually use a limited number of deterministic factors and assumptions; moreover, they may not be able to handle a complex warehouse system and its changes over time. For example, the forklift EC significantly depends on load weights, and the weights may vary during forklift operations over time. Therefore, a simulation approach, which considers the changes in warehouse effective factors over time, can represent a better warehouse state for warehouse enterprises to make decisions in minimizing EC while responding to customer orders on time. Most current studies, however, have focused on mathematical models to determine the scheduling of forklift battery charging in making picker-to-parts systems sustainable; conversely, only a few studies have considered the energy-aware picker-to-parts systems by simulation as presented in Table 1. One example is the work of [20], who designed a simulation model to compare electric and fuel forklifts in terms of GHG for inbound warehouse activities. The results recommend using electric forklifts instead of fuel forklifts for the low- to medium-weight SKUs. The study in [21] also investigates replenishment and order-picking activities to minimize travel time and cost by simulation and a mathematical model. The proposed simulation uses the Dijkstra algorithm to address the forklift routing problem. The simulation analysis of the study also shows that EC reduction is significantly affected by the warehouse layout, operations, and material handling equipment. The advantages of simulation over mathematical models are described for warehouses in Table 1; most studies have broadly taken the same advantages in analyzing the parts-to-picker systems (AS/RS types). Table 1 shows that most simulation studies have been conducted either in a parts-to-picker system or in a picker-to-part system. We can also see that most parts-to-picker system studies focus on AS/RS or their variants. These observations clearly show that there exists a lack of research investigating integrated warehouses considering both forward and reserve areas, including those with AS/RS and forklifts.
AS/RS energy efficiency has become crucial in recent years for warehouses in order for them to become sustainable in all design factors in recent years [34]. In other words, a warehouse can be more sustainable by controlling AS/RS from an energy-aware perspective [15]. In particular, warehouse sustainability can be guaranteed by considering the relationships between inventory management, warehouse management, AS/RS EC, and GHG emissions [25]. The authors of [25] propose an integrated simulation to investigate the relationship between inventory management and warehouse GHG emissions. The study shows that AS/RS GHG emissions are lower than the GHG emissions generated by wide/narrow-aisle warehouses. The study in [11] also applies simulation to study the picking time and EC when S/R machines of an AS/RS are in an idle state; the results suggest that the movements of S/R machines cause a decrease in picking time and an increase in EC when the storage assignment and replenishment are determined. The proposed model in [26] considers the effects of AS/RS rack shapes on EC with a simulation time-based model; the study presents hybrid constraint programming and a large neighborhood search. The simulation is also designed particularly for storage assignment and operation sequencing problems. The results of the study demonstrate that there is a notable relationship between EC and rack height. Moreover, the authors of [33] examine different I/O point policies for AS/RS in which conveyors are used for depth transportation. The study formulates a travel time model which is verified by simulation. In terms of travel time, the study results show that a mid-point elevation policy is more effective than other policies.
Different types of AS/RS are categorized as complex systems with dynamic factors, so most AS/RS studies have widely studied them with simulation approaches. Among different types of AS/RS, the autonomous vehicle storage and retrieval system (AVS/RS) has been broadly considered in the literature since this system provides desirable flexibility by changing the number of vehicles to deal with the fluctuation of warehouse demand. Moreover, different AVS/RS designs such as shuttle-based storage and retrieval systems (SBS/RS) have been studied in the literature. For example, the study of [23] uses simulation to verify an analytical model formulated based on an open queuing network approach for an AVS/RS. The study formulates the model to examine the cycle time and waiting times of tote movements with a captive-tier configuration. The results show that the average cycle time and waiting time could be reduced by applying the proposed model. The authors of [27] use an analytical model and simulation to study the travel time/distance and cycle time for single- and dual-command cycles of an AVS/RS. The proposed model is validated by simulation, and different layout configurations with multiple deep storage lanes are considered for a real warehouse. The approach in [30] presents a simulation model for the travel time and EC to examine and compare the energy balance and recovery measurements of an AVS/RS. The results of the study indicate that around 28% of EC could be recovered in the AVS/RS. The research in [31] applies simulation to verify a travel time model formulated for a tier-to-tier SBS/RS under a dual command. The study investigates the SBS/RS performance by alternative factors such as the physical configuration, vehicle acceleration/deceleration (A/D) rate and velocity, and shuttle operational probability.
If a single S/R machine is considered for AS/RS, the basic physics laws to calculate EC and power of S/R machines can be applied to forklifts and S/R machines. Then, the power and EC of simulated S/R machines and forklifts can be measured by previous studies [8,12,35,36,37]. For the travel time models, the study of [38] can be referred to. Also, most existing studies do not utilize real data on EC and the movements of forklifts. To address this lack of studies, we use (i) power data on forklift battery chargers collected from experiments and (ii) forklift power and travel data provided by a forklift manufacturer [2,39]. From these datasets, this research can perform a more realistic EC and OT analysis.
Design of experiments (DOE) is a robust method and has been extensively used for simulation results in the literature to identify significant factors affecting the various measures of warehouse performance. Researchers have also applied this method to determine the relationships between different warehouse factors over time from the simulation results as shown in Table 1. The authors of [32] use a simulation-based experimental design to address the effects of various physical designs, storage policies, and environmental factors on the travel time of a single-crane multi-aisle AS/RS with a single command cycle. The study shows that the small number of aisles decreases the advantages of a cross-aisle full-turnover storage policy while increasing the benefits of a random storage policy. The study of [24] presents a simulation-based DOE to identify key factors between AVS/RS tier-captive and tier-to-tier configurations. The proposed DOE examines the effects of AVS/RS factors on different performance measures such as cost. The analysis of the study also shows that the cost could be minimized by decreasing the number of aisles and increasing the aisle length. The research in [22] uses a simulation-based DOE to find significant factors affecting the performance of AVS/RS in terms of average storage and retrieval cycle time, and the average utilization of lifts and vehicles. The study defines different scenarios for lifts and vehicles with various arrival rates. The results show that the combination of the highest factor levels could present the best scenario for the AVS/RS system. The author of [8] also applies a simulation-based experimental design to recognize significant factors influencing the pre-defined performance measures of a shuttle-based storage and retrieval system (SBS/RS). The study uses a full factorial design to investigate the effects of velocity, acceleration, and the number of bays and tiers on the average cycle time, energy regeneration, and EC. The author of [28] proposes a DOE for an SBS/RS to find an optimized scenario for single and dual command cycle times and throughput. The factors considered in the study include the number of bays and tiers, shuttle A/D rate and velocity, and elevator A/D rate and velocity. The results exhibit that the best scenarios belong to the small number of bays and tiers. The study in [29] also applies a similar DOE with the same performance measures and different design factors such as the number of bays and minimum warehouse volume for an SBS/RS. The results of the study indicate that the SBS/RS system operates more efficiently with high racks and a small number of tiers.
As shown previously, both warehouse forward and reserve areas need to be studied together since they are interconnected in evaluating EC and OT. Thus, we designed an energy-aware simulation model in SIMIO software (version 15) and integrated warehouse forward and reserve areas by considering AS/RS, forklifts, and storage racks. In this research, we also apply real power and movement data to support the proposed energy-aware simulation of forklifts and S/R machines, and this endeavor will contribute to filling the lack of real-power-based simulation studies in the literature. In order to consider various warehouse activities such as cross-docking, replenishment, and put-away under various warehouse flows, five factors are considered in DOE: (i) the number of forklifts, (ii) the number of S/R machines, (iii) the I/O buffer capacity of the AS/RS, (iv) the order size, and (v) the flow rate. The flow rate factor is defined based on the proportion of loads on warehouse flows moving through forward and reserve areas. Factorial design is used for DOE to identify the significant factor(s) influencing EC and OT from the simulation results. DOE analyses will provide a comprehensive investigation for warehouse decision-makers to improve EC and OT in the warehouse reserve and forward areas together. Thus, this study will help industrial practitioners reduce and save EC and OT in warehouse operations. The results from this study can also encourage and benefit relevant warehouse research studies by providing real EC and movement data from forklifts and battery chargers. The rest of this paper is organized as follows. Section 3 presents relevant models for warehouse simulation as well as EC. DOE results are provided in Section 4, and we discuss the results with potential future research work in Section 5.

3. Models for Simulating Warehouse Energy

To evaluate EC and OT during simulation runs, we need models for the computing power and travel time of material handling equipment. Thus, in this section, we provide models for estimating power and travel time to be used for forklifts and S/R machines in simulation models. Then, the simulation model is also introduced.

3.1. Travel Time Models for Forklifts and S/R Machines

EC is calculated as power used for a certain amount of time. When the EC for forklifts and S/R machines is calculated, operational factors such as the A/D rate and velocity are needed for evaluating the travel time. For that, the study in [38] can be applied, and the EC of forklifts and S/R machines can be estimated based on real forklift power data provided by [2,39]. Following the information and data by [2,39], relevant factors and parameters are defined to explain the relationships among the forklift A/D rate, velocity, and travel time: a = A/D rate (m/s2), v t = velocity at time t (m/s), v m a x = maximum velocity (m/s), t p e a k = time duration needed to reach peak velocity (second), d p e a k = travel distance needed to reach v m a x (meter), T = total travel time (second), and d T = total travel distance (meter). The weight of the forklift or S/R machine is assumed to be 5971 kg.
Then, two possible travel scenarios can be considered. In the first scenario, a forklift or S/R machine cannot move as far as d p e a k or reach v m a x while it can reach v m a x in the second scenario. Equations (1) and (3) calculate the forklift velocity v t at time t based on the A/D rate a and v m a x for the first and second scenarios, respectively. These two scenarios are visually shown in Figure 2. Moreover, Equations (2) and (4) measure the total travel distance d T according to v t for the first and second scenarios, respectively. Equation (5) calculates d p e a k based on v t .
v t = a · t                                           t [ 0 ,   t p e a k ] a · ( t T )               t [   t p e a k ,   T ]
d T = 0 T v t · d t = a 4 · T 2
v t = a · t                                             t 0 ,   t p e a k v m a x                               t   t p e a k ,   T t p e a k a · t T                       t   T t p e a k ,   T                    
d T = 0 T v t · d t = v m a x · T v m a x 2 a
d p e a k = 0 T v t · d t = v m a x 2 a
For material handling equipment such as forklifts and S/R machines, horizontal and vertical movements are assumed when they travel from SKU i to j. Then, the A/D rate, velocity, and travel time of forklifts or S/R machines can be defined in various cases for both horizontal and vertical movements. Figure 3 illustrates the combination of the travel scenarios in the horizontal and vertical directions. According to Equations (2) and (4), Equations (6) and (7) also calculate horizontal and vertical travel times, respectively, for which the following parameters are defined: a x = A/D rate in the horizontal direction (m/s2), a y = A/D rate in the vertical direction (m/s2), v m a x x = maximum velocity in the horizontal direction (m/s), v m a x y = maximum velocity in the vertical direction (m/s), d p e a k x = travel distance needed to reach v m a x x , d p e a k y = travel distance needed to reach v m a x y , d i , j x = travel distance between SKU i and j in the horizontal direction (meter), d i , j y = travel distance between SKU i and j in the vertical direction (meter), t i , j x = travel time between SKU i and j in the horizontal direction (second), and t i , j y = travel time between SKU i and j in the vertical direction (second).
t i , j x = 4 · d i , j x a x                                   0 d i , j x d p e a k x d i , j x v m a x x + v m a x x a x               d p e a k x d i , j x                
t i , j y = 4 · d i , j y a y                                   0 d i , j x d p e a k x d i , j y v m a x y + v m a x y a y               d p e a k x d i , j x                
From the available data, we can estimate the following parameters. As shown in Figure 4, the average A/D rate for 8.73 s is a x = 0.409 m/s2, and from 8.74 to 15.41 s, the maximum constant velocity of v m a x x = 3.576 m/s can be observed with the horizontal direction of a forklift. Then, t i , j x can be evaluated with Equation (6) given a x , v m a x x , and the distance between SKUs i and j in the horizontal direction ( d i , j x ).
The vertical movement velocity and power of the forklift is presented in Figure 5. The forklift lifts the load with the constant velocity of v y = 1.162 m/s by its carriage for t v = 4.97 s. While we assume that the forklift has an A/D rate in the horizontal direction, it seems to keep a constant velocity with no A/D rate in the vertical direction. Thus, a y = 0 m/s2, and we cannot use Equation (7) to measure t i , j y according to the distance between SKUs i and j in the vertical direction ( d i , j y ). Equation (8), which is formulated instead of Equation (7), measures t i , j y according to d i , j y , t v = 4.97 s, and the two vertical constant velocities ( v y = 1.162 m/s) [2].
t i , j y = d i , j y v 1 y                                                 0 d i , j y v 1 y · t v t v + d i , j y v 1 y · t v v 2 y               v 1 y · t v d i , j y                

3.2. Power Models for Forklifts (S/R Machines) and Battery Chargers

We first model the power of forklifts and S/R machines for horizontal and vertical movements, respectively, and then provide a model for the power of forklifts’ battery chargers. These models will be used for simulation scenarios by varying movement times and weights of loads in evaluating EC and OT.

3.2.1. Horizontal Movement Power Models

To model the power of forklifts or S/R machines in horizontal movement, we used the power data of a forklift in the time resolution of 0.01 s provided by [39] (see Figure 4). According to the available data, the power of forklifts in a horizontal movement can be modeled in three stages. A forklift (S/R machine) accelerates in Stages 1 and 2 and remains at a constant maximum velocity in Stage 3. Stage 1 of the model begins with the power of p 0 = 0 Watts and ends at a peak power p 1 with the velocity of v p = 1.243 m/s; afterwards, the power declines from p 1 to a constant power p 2 in Stage 2. Finally, the power remains constant with the amount of p 2 in Stage 3. Two linear power equations are applied to model the power of Stages 1 and 2, and the constant power of p 2 is considered for Stage 3. Stages 1 and 2 take 1.73 and 7.01 s, respectively, and the rest of the movement time stays at Stage 3. From these models, we can estimate power forklifts and S/R machines as a function of movement time. Then, we apply the horizontal power model in [37] for the simulation using the available data and estimate the relevant parameters as follows:
G = ( m f + m l ) · g
F = G · μ 1 + G   g · a p ·   k                                               i f   t = t 1     G · μ 2                                                                                         i f   t = t 2      
p 1 = F ·   v p   η
p 2 = F ·   v m a x   η
p h = p 1   t 1 ·   t                                                                             i f   t t 1 p 2 p 1   t 2 t 1 · t t 1 + p 1                           i f   t 1 t t 2 p 2                                                                                           o t h e r w i s e  
where G = force of gravity (N = kg × m/s2), m f = forklift mass (kg), m 1 = load mass (kg), g = gravity acceleration ≈ 9.8 m/s2, F = traction force (N = kg × m/s2), μ 1 = coefficient of resistance including rolling and aerodynamics for forklifts with acceleration in Stage 1 = 0.140, a p = acceleration at peak power = 0.64 m/s2, k = rotating mass coefficient = 1.150, μ 2 = coefficient of resistance including rolling and aerodynamics for forklifts with constant velocity in Stage 3 = 0.019, p 1 = peak power in Stage 1 (Watt), v p = velocity at peak power = 1.243 m/sec, η = efficiency of mechanical systems (0.9 for motors, pumps, etc.), p 2 = constant power in Stage 3 (Watt), v m a x = constant maximum velocity in Stage 3 (m/s), p h = power for horizontal movement (Watts = kg × m2/s3), t 1 = start time of Stage 2 = 1.73 s, t = time passed in horizontal movement (s), and t 2 = start time of Stage 3 = 8.74 s.
Equations (9) and (10) calculate the gravity and traction forces, respectively. Equations (11) and (12) measure the peak power and constant power for the horizontal forklift movement, respectively. Equation (13) also calculates the forklift power in the horizontal movement from Equations (11) and (12). To validate this model, we solved the proposed model based on the maximum velocity ( v m a x = 3.576 m/s) and forklift weight ( m f + m l = 5971 kg) and observed that there was a 0.22% power difference between the fitted model and the provided forklift energy data. Figure 4 also shows how the modeled power closely fits the real (collected) power data. For simulation, m l values will be varied, and power will be evaluated for each load/pallet.

3.2.2. Vertical Movement Power Models

According to the available forklift energy and movement data, the forklift uses a carriage in the lifting operation/vertical movement. The data in Figure 5 show that the velocity of the carriage movement is almost constant. Hence, we model the power in such a way that each forklift spends the entire time of vertical movement with a constant velocity (v). According to the available data [39] and a model proposed by [37], we formulated a vertical power model as Equations (14) and (15); these equations measure the gravity force and forklift power in a vertical movement, respectively.
G = ( m c + m l ) × g
p v = k × G × v v η    
where m c = carriage mass of the carriage (kg), m l = load mass (kg), g = gravity acceleration ≈ 9.8 m/s2, k = counterweight coefficient = 2.2 (=1 if the counterweight is not applied), v v = constant vertical velocity (m/s), η = efficiency of mechanical systems (0.9 for motors, pumps, etc.), G = force of gravity ( N = kg × m/s2), and p v = power for vertical movement (Watts = kg × m2/s3).
Since the proposed vertical model is formulated based on the data from the forklift manufacturer, it is necessary to examine and compare the model results with the forklift data [39]. We set v = 1.162 m/s according to the data and assume that m c + m l = 544.31 kg as the input parameters of the model. The results show that the modeled power properly fits the data, and there is a 2.08% difference between them as in Figure 5. For simulation, m l values will be varied, and power will be evaluated for each load/pallet.

3.2.3. Battery Charger Power Model

To model the battery charging power, we collected real data from a charger used for a lead-acid battery with 38 V, 1105 Ah, and 18 cells as in Figure 6. We studied this battery type since the battery specifications are close to the forklift battery considered in this research. The collected data show that this lead-acid battery is charged wiinth three stages: in Stage 1, a constant-current charge provides the main part of the charge, in Stage 2, a topping charge saturates the charge of the battery, and in Stage 3, a float charge is applied to help the battery not to be self-discharged. According to the data, 2300 s and 6260 s out of the charging time are assigned to Stages 1 and 2, respectively, and the remaining charging time is dedicated to Stage 3. The amount of power during Stages 1 and 3 is also assumed to be constant in the model. Thus, the averages of power in the relevant stages of the real data are measured and used as the constant powers of the model. We also used the curve fitting tool to model the power of Stage 2. The notations and power formulations are provided in Equation (16).
p c h =   p 1 = 11099.21                                                                                                                                                       i f       t t 1 10603 1.559 × ( t t 1 ) + 0.000105 × ( t t 1 ) 2                                         i f       t 1 < t t 2 p 2 = 4821.68                                                                                                                                                           o t h e r w i s e              
where t 1 = start time of topping charge (Stage 2) = 2300 s, t 2 = start time of float charge (Stage 3) = 9680 s, t = time passed in charging (s), p 1 = average of power in Stage 1 = 11,099 Watts, p 2 = average of power in Stage 3 = 4822 Watts, and p c h = power of the charger (Watt).
Equation (16) provides the estimated power of the charger. The results of the proposed model show that there is a 0.01% difference between the power calculated from the model and the real data. Also, Figure 6 illustrates that the modeled power closely fits the real power data. The proposed model in Equation (16) will be used to model the power of forklift battery chargers for simulations. Regarding the amounts of t i , j x and t i , j y , we can measure and calculate the forklift and S/R machine EC in the horizontal and vertical directions from the available forklift data for simulation scenarios [39].

3.3. Simulation Models for Warehouses

There exist interactions between picker-to-parts (forward) and parts-to-picker (reserve) systems in a warehouse, and these interactions have effects on EC and OT. Thus, we built and simulated a warehouse that consists of the integrated picker-to-parts (forward) and parts-to-picker system (reserve) by considering the movements of forklifts and S/R machines to analyze EC and OT. This warehouse is 460 feet ( 140.2 m) long and 265 feet ( 80.8) wide, and therefore, its area is 121,900 ft2 ( 11,325 m2) as illustrated in Figure 7. This simulation model connects the AS/RS in a parts-to-picker system to the picker-to-parts systems through AS/RS I/O points, where forklifts receive the unit-loads (pallets) from the AS/RS to make shipments or replenish the picker-to-parts system in the forward area.
The simulation of this integrated warehouse was modeled with SIMIO software (version 15) to examine EC and OT. Table 2 lists the specifications of the picker-to-parts system (forward area) and the part-to-picker system (AS/RS) designed in our simulation.
In the simulation, EC measurements of forklifts and battery chargers were performed over time according to the power models presented in Section 3.1 and Section 3.2. To apply these models in the simulation model and generate outputs as Excel files, we used various logic processes in SIMIO. More specifically, the outputs of the simulation from SIMIO are (i) the location names of forklifts at the time, (ii) the description status of forklifts at the time, (iii) the loading status of forklifts at the time (=1 of loaded; 0 otherwise), (iv) the load mass of forklifts at the time (kg), (v) the location X–coordinate of forklifts at the time (meters), (vi) the location Y–coordinate of forklifts at the time (meters), (vii) the location Z–coordinate of forklifts at the time (meters), (viii) the current time, (ix) the power of forklifts and forklift battery chargers at the time (Watt), and (x) the EC of forklifts and forklift battery chargers (Watt∙sec). Then, we imported the outputs of SIMIO (Excel files) in MATLAB to generate the power time series of forklifts, S/R machines, and forklift battery chargers. For the simulation processes for generating time series, the study in [40] can be referred to.
We assume that each forklift or S/R machine is capable of picking a maximum of 45 SKUs ( C f = 45) with similar dimensions in each tour [41]. Also, the mass capacity of forklifts or S/R machines is considered as 1360 kg. The average time of a battery fast charging ( θ ) is assumed to be 20 min [42]. We collected real power data for 20 min from a charger of a lead-acid battery with 38 V and 1105 Ah, and 18 cells as shown in Section 3.2; accordingly, we assumed that the maximum EC of forklift between two consecutive fast chargings E C m a x is 3.73 kWh.
The following assumptions are considered for the DOE of the integrated picker-to-parts and parts-to-picker system. We set the simulation run time (24 h) and the number of orders (100 orders) as two criteria to terminate the simulations of EC and OT, respectively. We ran each DOE scenario with three replications. A 4 h warm-up time was set for each simulation run. Each S/R machine or forklift can process two types of transaction/task: storage transactions (reach pallets to racks) and retrieval transactions (pick up pallets from racks). S/R machines and forklifts process the transactions based on the first-in-first-out (FIFO) rule and cannot be interrupted during a transaction. The closest forklift is assigned to a transaction when needed; all other default settings are accepted for detailed operations and routings of forklifts and S/R machines. S/R machines and forklifts stay at their current locations in an idle state. S/R machines and forklifts move pallets to available storage locations, randomly. The order size is assumed to be the number of pallets, and each S/R machine or forklift can load/unload one pallet at a time. The interarrival time of pallets from the inbound docks is exponentially distributed with an average of 0.01 h. S/R machines and forklifts move/store pallets to available storage locations, randomly. Pallet weight is randomly generated from the uniform distribution with U[500, 1500] in kg. The storage time in AS/RS is randomly generated from the uniform distribution of U[8, 16] h. The storage time in the picker-to-parts system is uniformly generated as U[4, 8] h. The processing time of cross-docking is assumed to be one hour. Order interarrival time is exponentially distributed with an average of 0.05 h. Order due dates are randomly distributed from the uniform distribution U[4, 6] in hours. The load capacity of all S/R machines and forklifts is 1500 kg. The acceleration and maximum velocity of S/R machines and forklifts are assumed to be 0.64 m/s2 and 3.576 m/s, respectively, in horizontal movements. The constant velocity of S/R machines and forklifts is assumed to be 1.162 m/s in vertical movements. The weight of an S/R machine (shuttle) or a forklift carriage is assumed to be 544.31 kg. The weight of an AS/RS crane or a forklift is assumed to be 4471 kg. The same battery capacity is assumed for all forklifts (≈25 kWh). An empty forklift battery needs 12,715 s to be fully charged. Forklifts remain idle during battery charging. The buffer capacity of AS/RS output points located between the reserve and the forward areas is examined and controlled in DOE. Each aisle of AS/RS has a one-pallet buffer capacity at its input point.
Figure 8 illustrates an example of the simulated power of forklifts, battery chargers, and S/R machines over a 24 h run. More specifically, the warehouse simulation provides the time series electrical loads of S/R machines, forklifts, and battery chargers. While the forklift EC is measured to determine the battery charging scheduling, it does not contribute to the total warehouse EC since the EC of forklifts is considered only through the EC of forklift battery chargers.

4. Results with Experimental Design

A 25 factorial design was conducted for EC and OT, separately, to examine the main effects and interaction effects of five important factors: the number of forklifts ( x 1 ), the number of S/R machines ( x 2 ), the I/O buffer capacity of the AS/RS (number of pallets) ( x 3 ), the order size (number of pallendts) ( x 4 ), and the flow rate ( x 5 ). In DOE, x 5 represents the proportion of pallets that are moved through Flows 1, 2, 3, and 4 as presented in Section 1 and Section 2. In more detail, Table 3 provides the values of each factor with two experimental levels. For example, the value of x 3 is selected from the discrete uniform distributions U{2, 4} and U{4, 6} with the low and high levels of the experiment, respectively. In other words, either two or four pallets can be randomly selected with the same probability as x 3 with the low level, and four or six pallets can be randomly selected with the same probability as x 3 with the high level. Also, the low level of x 5 in DOE is defined as the proportions of 2, 1, 1, and 2 (33.3%, 16.5%, 16.5%, and 33.3%) for Flows 1, 2, 3, and 4, respectively. The different configurations of x 5 are designed with the high level, which is the proportions of 1, 2, 2, and 1 (16.5%, 33.3%, 33.3%, and 16.5%) for Flows 1, 2, 3, and 4, respectively.

4.1. DOE for the EC of Integrated Energy-Aware Picker-to-Parts and Parts-to-Picker Systems

Simulation results for EC based on a 25 factorial design are reported in Table 4; three replications are carried out for each treatment, and the average response is reported in the table. The analysis of variance (ANOVA) results of the factorial design are also provided in Table 5. Figure 9 shows the half-normal plot of effects on average EC.
Moreover, a multiple linear regression (MLR) is modeled to examine the main effects of factors on EC in Table 6. Also, the residuals of MLR are normally distributed. Moreover, R2 = 97.74% and R2 = 93.89% are obtained from ANOVA and MLR, respectively, verifying that both models properly fit the simulation results.
The ANOVA and MLR results also show that the number of forklifts ( x 1 ), the number of S/R machines ( x 2 ), the I/O buffer capacity of AS/RS (number of pallets) ( x 3 ), and the flow rate ( x 5 ) are statistically significant in deciding EC (p-value < 0.05), as in Table 5 and Table 6. In particular, a switch from the DOE low level to the high level of x 5 significantly raises the with EC since it increases the proportion of pallets moving through Flows 2 and 3, with a great deal of traffic from a warehouse reserve area (AS/RS) to the warehouse forward area shown in Figure 7. Therefore, we observed more EC with the high-level x 5 since AS/RS is used more in comparison with the low-level x 5 . In this simulation, two types of transactions are defined to be processed by forklifts and S/R machines: storage and retrieval transactions. The retrieval transactions of AS/RS are controlled by x 3 among other factors. Larger x 3 requests more retrieval transactions from S/R machines, which significantly increases EC as shown in Table 4 and Table 5; more S/R machines ( x 2 ) or forklifts ( x 1 ) can process more storage or retrieval transactions, which also significantly requires more EC at any given time moment. Table 5 suggests that order size ( x 4 ) is the only insignificant factor for EC. This can be explained by the traffic-limiting effect of other factors. First, AS/RS activities are constrained by AS/RS I/O points ( x 3 ), in which forklifts handle pallets toward the forward area or outbound docks. In other words, more utilization of AS/RS or S/R machines by more orders does not directly contribute to order deliveries at outbound docks. Therefore, order size x 4 is not likely to change AS/RS EC at a time due to this traffic-limiting effect of x 3 . Second, orders need to be delivered at outbound docks by forklifts from the cross-docking, reserve area, or forward area. Thus, the number of forklifts available ( x 1 ) plays another traffic-limiting role in deciding EC even if x 4 increases. Overall, x 4 turns out to affect EC insignificantly or indirectly.
To minimize EC, it is also important that the main effects of the factors are analyzed with the interaction effects of factors. From the DOE results, x 5 also makes significant two-way and three-way interactions with x 1 and x 2 as in Table 6. For example, from all Table 4 scenarios with x 2 and x 5 , the high-level x 5 (more use of AS/RS) with the high-level x 2 (more S/R machines) would result in the highest increase in EC, as suggested by Table 6: 30.5 ( x 5 = 1) + 20.2 ( x 2 = 1) − 2.1 ( x 5 · x 2 = 1) = 48.6. Conversely, the minimum EC would be obtained if we select the low level of the experiment for both x 2 and x 5 . While an increase in both x 2 and x 5 raises the EC, individually, the combined (two-way interaction) effect of x 2 and x 5 is negative in this case. Figure 10 also provides the two-way interaction plot.

4.2. DOE for the OT of Integrated Energy-Aware Picker-to-Parts and Parts-to-Picker Systems

The results of 25 scenarios of the factorial design of the average OT are listed in Table 7. Also, the ANOVA and MLR results are presented in Table 8 and Table 9, respectively. We modeled the MLR to analyze the main effects of the factors on the average OT. The normality assumption of model residuals is also met. Moreover, the ANOVA and MLR models fit the simulation results very well with R2 = 91.78% and R2 = 83.60%, respectively. Figure 11 shows the half-normal plot of effects on average OT.
From the ANOVA and MLR results, all main effects were found to be statistically significant. In terms of the order of absolute effect values, order size ( x 4 ) significantly increases overdue orders and OT; larger x 4 requires more pallets to be delivered per order per given time as shown in Table 8 and Table 9. In addition to x 4 , more forklifts ( x 1 ) significantly decreased the OT by picking more orders in a shorter amount of time. Flow rate ( x 5 ) is also a significant factor in a positive relationship with OT. If the low level of flow rate ( x 5 ) switches to its high level in DOE, the proportion of pallets in a reserve area (AS/RS) increases when compared with the proportions in other warehouse areas as presented in Figure 7. This change results in more significant delays in delivering orders due to the longer storage time in the AS/RS as in Table 8 and Table 9. Also, larger I/O AS/RS buffers ( x 3 ) enable more pallets to move from the AS/RS to shipment, and this helps deliver more orders in a shorter time window and significantly reduces the OT according to the ANOVA and MLR results in Table 8 and Table 9.
We observed that the number of S/R machines ( x 2 ) is also a significant factor for OT from the results above. The effect of x 2 is positive as 0.1 is approximate, and this can be explained as x 2 is actually the number of S/R machines as well as the number of aisles of the AS/RS to be used. In other words, we control the number of AS/RS aisles to be used by changing x 2 : when x 2 = 1, the number of S/R machines (the same as the number of AS/RS aisles to be used) is nine whereas the number is four with x 2 = −1. Thus, we can understand why a switch from −1 to +1 in x 2 does not improve the OT and actually increases the OT slightly since S/R machines or the number of AS/RS aisles available is not a traffic-limiting factor but rather a more resource-utilizing factor. In fact, the constraint of the I/O buffer capacity of the AS/RS ( x 3 ) does not allow x 2 to contribute to OT. In other words, the I/O points of the AS/RS located between the reserve area and the forward area play bottleneck roles for the flow from the AS/RS to the forward area and shipment as in Figure 1 and Figure 7. Therefore, more/fewer x 2 does not change the number of pallets from the reserve area (AS/RS) to be delivered for orders directly since the traffic is mostly controlled by x 3 . Also, x 5 is an important factor in determining OT, and the interaction term between x 2 and x 5 has a larger effect on the average OT than that of x 2 . Table 10 shows this point very clearly; the effect of x 2 is marginalized when x 5 and x 2 · x 5 are considered together since the total effect from these three terms become negative only when x 5 is negative. Figure 12 visually presents other possible two-way interactions, including x 2 · x 5 .

4.3. Pareto-Optimal DOE Scenarios

We used a Pareto-optimal front to analyze the results of 25 scenarios of two factorial designs conducted for EC and OT in one framework as in Figure 13. Thus, the Pareto-optimal front can be drawn with four non-dominated scenarios better than other scenarios (dominated scenarios). No scenario represents a better quality than another in the Pareto-optimal front. From Table 11, we find that the low level is selected for the factor of flow rate ( x 5 ) for all non-dominated scenarios. In other words, all non-dominated scenarios include a greater proportion of pallets through Flows 1 and 4 when compared with Flows 2 and 3, as shown in Figure 1 and Figure 7. While the low DOE level of x 5 is designed to use AS/RS less with lower EC and OT, the high level of x 5 increases the use of AS/RS, resulting in more EC and OT by more AS/RS EC and storage time.

5. Conclusions

In modern warehousing systems, it is crucial to investigate the trade-off between EC and OT while both reserve and forward areas are considered. For this, we analyzed five different important factors (the number of forklifts, the number of S/R machines, the I/O buffer capacity of the AS/RS, the order size, and the flow rate) affecting EC and OT to consider the interdependency between warehouse reserve and forward areas. We used simulation models to see how responses (EC and OT) act for different configurations of the five factors. Then, a 25-factorial design was conducted for each EC and OT as DOE responses using the simulation. The results show that all factors significantly affect EC except the order size. Moreover, all factors were statistically significant in determining OT. Finally, we drew a pareto-optimal front from the DOE results of EC and OT to provide multiple optimal scenarios for warehouse decision-makers. The four Pareto-optimal scenarios suggest that less traffic flows through a reserve area is the most important factor for Pareto-optimality.
These simulated results can be used by warehouse decision-makers to assess both sustainability and performance for each warehouse setting or configuration. In particular, this study presents that less traffic passing through a reserve area (Flows 1 and 4) can help improve EC and OT at the same time while either level (+1 or −1) of the other factors (the number of forklifts, S/R machines, and AS/RS I/O points as well as order size) can impact EC and OT positively or negatively. Thus, this research suggests that the amount of traffic passing through a reserve area plays a significant role in improving both EC and OT.
While this study investigates the effects of warehouse factors on EC and OT, it has some possible improvements. This study utilizes all factors as binary variables, but further studies considering various factors as continuous variables deserve future research efforts. Also, other factors affecting the performance of warehouses can be additionally considered. For example, the dimensions of reserve and forward areas, including AS/RS size, can be varied. x 5 can be specified further in a future study. Currently, x 5 desribes the flow difference between two cases with Flows 1 and 4 (high/low) and Flows 2 and 3 (low/high). Other possible combinations can be made and considered for x 5 .

Author Contributions

Conceptualization, H.-w.J. and A.E.; methodology, H.-w.J. and A.E.; software, H.-w.J. and A.E.; validation, H.-w.J. and A.E.; formal analysis, H.-w.J. and A.E.; investigation, H.-w.J. and A.E.; resources, H.-w.J. and G.-h.L.; data curation, H.-w.J.; writing—original draft preparation, H.-w.J. and A.E.; writing—review and editing, H.-w.J. and G.-h.L.; visualization, H.-w.J. and G.-h.L.; supervision, H.-w.J.; project administration, H.-w.J.; funding acquisition, H.-w.J. All authors have read and agreed to the published version of the manuscript.

Funding

This work was supported by the Korea Institute of Energy Technology Evaluation and Planning (KETEP) and the Ministry of Trade, Industry & Energy (MOTIE) of the Republic of Korea (20224000000260). This work was also supported by Institute of Information & communications Technology Planning & Evaluation (IITP) grant funded by the Korea government (MSIT) (No.RS-2022-00155911, Artificial Intelligence Convergence Innovation Human Resources Development (Kyung Hee University)).

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest. The funders had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript; or in the decision to publish the results.

Abbreviations

A/DAcceleration/deceleration
ANOVAAnalysis of variance
AS/RSAutomated storage/retrieval system
AVS/RSVehicle storage and retrieval system
DOEDesign of experiments
ECEnergy consumption
I/O pointInput/output point
MLRMultiple linear regression
OTOrder tardiness (average)
S/RStorage and retrieval
SBS/RSShuttle-based storage and retrieval systems
SKUStock-keeping units

References

  1. Young, L. Online Shopping’s Fast-Delivery Race Is Slowing Down. Wall Str. J. 2023. Available online: https://www.wsj.com/articles/online-shoppings-fast-delivery-race-is-slowing-down-73d4c68c (accessed on 11 September 2023).
  2. Ebrahimi, A.; Jeon, H.; Jung, S. Improving Energy Consumption and Order Tardiness in Picker-to-Part Warehouses with Electric Forklifts: A Comparison of Four Evolutionary Algorithms. Sustainability 2023, 15, 10551. [Google Scholar] [CrossRef]
  3. Perotti, S.; Colicchia, C. Greening Warehouses through Energy Efficiency and Environmental Impact Reduction: A Conceptual Framework Based on a Systematic Literature Review. Int. J. Logist. Manag. 2023. [Google Scholar] [CrossRef]
  4. Füchtenhans, M.; Glock, C.H.; Grosse, E.H.; Zanoni, S. Using Smart Lighting Systems to Reduce Energy Costs in Warehouses: A Simulation Study. Int. J. Logist. Res. Appl. 2023, 26, 77–95. [Google Scholar] [CrossRef]
  5. Heragu, S.S.; Du, L.; Mantel, R.J.; Schuur, P.C. Mathematical Model for Warehouse Design and Product Allocation. Int. J. Prod. Res. 2005, 43, 327–338. [Google Scholar] [CrossRef]
  6. de Koster, R.; Le-Duc, T.; Roodbergen, K.J. Design and Control of Warehouse Order Picking: A Literature Review. Eur. J. Oper. Res. 2007, 182, 481–501. [Google Scholar] [CrossRef]
  7. Yetkin Ekren, B. A Multi-Objective Optimisation Study for the Design of an AVS/RS Warehouse. Int. J. Prod. Res. 2021, 59, 1107–1126. [Google Scholar] [CrossRef]
  8. Ekren, B.Y. A Simulation-Based Experimental Design for SBS/RS Warehouse Design by Considering Energy Related Performance Metrics. Simul. Model. Pract. Theory 2020, 98, 101991. [Google Scholar] [CrossRef]
  9. Carli, R.; Dotoli, M.; Digiesi, S.; Facchini, F.; Mossa, G. Sustainable Scheduling of Material Handling Activities in Labor-Intensive Warehouses: A Decision and Control Model. Sustainability 2020, 12, 3111. [Google Scholar] [CrossRef]
  10. Bortolini, M.; Faccio, M.; Ferrari, E.; Gamberi, M.; Pilati, F. Time and Energy Optimal Unit-Load Assignment for Automatic S/R Warehouses. Int. J. Prod. Econ. 2017, 190, 133–145. [Google Scholar] [CrossRef]
  11. Meneghetti, A.; Monti, L. Sustainable Storage Assignment and Dwell-Point Policies for Automated Storage and Retrieval Systems. Prod. Plan. Control 2013, 24, 511–520. [Google Scholar] [CrossRef]
  12. Lerher, T.; Edl, M.; Rosi, B. Energy Efficiency Model for the Mini-Load Automated Storage and Retrieval Systems. Int. J. Adv. Manuf. Technol. 2014, 70, 97–115. [Google Scholar] [CrossRef]
  13. Stöhr, T.; Schadler, M.; Hafner, N. Benchmarking the Energy Efficiency of Diverse Automated Storage and Retrieval Systems. FME Trans. 2018, 46, 330–335. [Google Scholar] [CrossRef]
  14. Tappia, E.; Marchet, G.; Melacini, M.; Perotti, S. Incorporating the Environmental Dimension in the Assessment of Automated Warehouses. Prod. Plan. Control 2015, 26, 824–838. [Google Scholar] [CrossRef]
  15. Meneghetti, A.; Monti, L. Greening the Food Supply Chain: An Optimisation Model for Sustainable Design of Refrigerated Automated Warehouses. Int. J. Prod. Res. 2015, 53, 6567–6587. [Google Scholar] [CrossRef]
  16. van den Berg, J.P.; Sharp, G.P.; Gademann, A.J.R.M.; Pochet, Y. Forward-Reserve Allocation in a Warehouse with Unit-Load Replenishments. Eur. J. Oper. Res. 1998, 111, 98–113. [Google Scholar] [CrossRef]
  17. Lee, S.; Jeon, H.W.; Issabakhsh, M.; Ebrahimi, A. An Electric Forklift Routing Problem with Battery Charging and Energy Penalty Constraints. J. Intell. Manuf. 2021, 33, 1761–1777. [Google Scholar] [CrossRef]
  18. Roodbergen, K.J.; Vis, I.F.A. A Survey of Literature on Automated Storage and Retrieval Systems. Eur. J. Oper. Res. 2009, 194, 343–362. [Google Scholar] [CrossRef]
  19. Bartolini, M.; Bottani, E.; Grosse, E.H. Green Warehousing: Systematic Literature Review and Bibliometric Analysis. J. Clean. Prod. 2019, 226, 242–258. [Google Scholar] [CrossRef]
  20. Facchini, F.; Mummolo, G.; Mossa, G.; Digiesi, S.; Boenzi, F.; Verriello, R. Minimizing the Carbon Footprint of Material Handling Equipment: Comparison of Electric and LPG Forklifts. J. Ind. Eng. Manag. JIEM 2016, 9, 1035–1046. [Google Scholar] [CrossRef]
  21. Burinskiene, A.; Lorenc, A.; Lerher, T. A Simulation Study for the Sustainability and Reduction of Waste in Warehouse Logistics. Int. J. Simul. Model. 2018, 17, 485–497. [Google Scholar] [CrossRef]
  22. Ekren, B.Y.; Heragu, S.S.; Krishnamurthy, A.; Malmborg, C.J. Simulation Based Experimental Design to Identify Factors Affecting Performance of AVS/RS. Comput. Ind. Eng. 2010, 58, 175–185. [Google Scholar] [CrossRef]
  23. Marchet, G.; Melacini, M.; Perotti, S.; Tappia, E. Analytical Model to Estimate Performances of Autonomous Vehicle Storage and Retrieval Systems for Product Totes. Int. J. Prod. Res. 2012, 50, 7134–7148. [Google Scholar] [CrossRef]
  24. Marchet, G.; Melacini, M.; Perotti, S.; Tappia, E. Development of a Framework for the Design of Autonomous Vehicle Storage and Retrieval Systems. Int. J. Prod. Res. 2013, 51, 4365–4387. [Google Scholar] [CrossRef]
  25. Fichtinger, J.; Ries, J.M.; Grosse, E.H.; Baker, P. Assessing the Environmental Impact of Integrated Inventory and Warehouse Management. Int. J. Prod. Econ. 2015, 170, 717–729. [Google Scholar] [CrossRef]
  26. Meneghetti, A.; Dal Borgo, E.; Monti, L. Rack Shape and Energy Efficient Operations in Automated Storage and Retrieval Systems. Int. J. Prod. Res. 2015, 53, 7090–7103. [Google Scholar] [CrossRef]
  27. Manzini, R.; Accorsi, R.; Baruffaldi, G.; Cennerazzo, T.; Gamberi, M. Travel Time Models for Deep-Lane Unit-Load Autonomous Vehicle Storage and Retrieval System (AVS/RS). Int. J. Prod. Res. 2016, 54, 4286–4304. [Google Scholar] [CrossRef]
  28. Lerher, T. Design of Experiments for Identifying the Throughput Performance of Shuttle-Based Storage and Retrieval Systems. Procedia Eng. 2017, 187, 324–334. [Google Scholar] [CrossRef]
  29. Lerher, T.; Borovinsek, M.; Ficko, M.; Palcic, I. Parametric Study of Throughput Performance in SBS/RS Based on Simulation. Int. J. Simul. Model. 2017, 16, 96–107. [Google Scholar] [CrossRef]
  30. Guerrazzi, E.; Mininno, V.; Aloini, D.; Dulmin, R.; Scarpelli, C.; Sabatini, M. Energy Evaluation of Deep-Lane Autonomous Vehicle Storage and Retrieval System. Sustainability 2019, 11, 3817. [Google Scholar] [CrossRef]
  31. Ha, Y.; Chae, J. A Decision Model to Determine the Number of Shuttles in a Tier-to-Tier SBS/RS. Int. J. Prod. Res. 2019, 57, 963–984. [Google Scholar] [CrossRef]
  32. Singbal, V.; Adil, G.K. A Simulation Analysis of Impact of Design and Storage Policy on Performance of Single-Crane Multi-Aisle AS/RS. IFAC-Pap. 2019, 52, 1620–1625. [Google Scholar] [CrossRef]
  33. Xu, X.; Zhao, X.; Zou, B.; Gong, Y.; Wang, H. Travel Time Models for a Three-Dimensional Compact AS/RS Considering Different I/O Point Policies. Int. J. Prod. Res. 2019, 58, 5432–5455. [Google Scholar] [CrossRef]
  34. Nia, A.R.; Far, M.H.; Niaki, S.T.A. A Hybrid Genetic and Imperialist Competitive Algorithm for Green Vendor Managed Inventory of Multi-Item Multi-Constraint EOQ Model under Shortage. Appl. Soft Comput. 2015, 30, 353–364. [Google Scholar]
  35. Borovinšek, M.; Ekren, B.Y.; Burinskienė, A.; Lerher, T. Multi-Objective Optimisation Model of Shuttle-Based Storage and Retrieval System. Transport 2017, 32, 120–137. [Google Scholar] [CrossRef]
  36. Yetkin Ekren, B.; Lerher, T. Energy and Cycle Time Efficient Warehouse Design for Autonomous Vehicle-Based Storage and Retrieval System. In Proceedings of the 14th IMHRC Proceedings, Karlsruhe, Germany, 12–16 June 2016. [Google Scholar]
  37. Zajac, P. Evaluation Method of Energy Consumption in Logistic Warehouse Systems; Springer: Berlin/Heidelberg, Germany, 2015. [Google Scholar]
  38. Hwang, H.; Lee, S.B. Travel-Time Models Considering the Operating Characteristics of the Storage and Retrieval Machine. Int. J. Prod. Res. 1990, 28, 1779–1789. [Google Scholar] [CrossRef]
  39. TMHNA. Available online: https://www.tmhna.com/ (accessed on 19 March 2023).
  40. Jeon, H.W.; Taisch, M.; Prabhu, V. Measuring Variability on Electrical Power Demands in Manufacturing Operations. J. Clean. Prod. 2016, 137, 1628–1646. [Google Scholar] [CrossRef]
  41. Scholz, A.; Schubert, D.; Wäscher, G. Order Picking with Multiple Pickers and Due Dates–Simultaneous Solution of Order Batching, Batch Assignment and Sequencing, and Picker Routing Problems. Eur. J. Oper. Res. 2017, 263, 461–478. [Google Scholar] [CrossRef]
  42. Forklift Batteries: Conventional Vs. Fast Vs. Opportunity Charging. Available online: https://www.tmhnc.com/blog/forklift-battery-charging-fast-opportunity-conventional (accessed on 5 January 2023).
Figure 1. Warehouse areas, flows, and activities.
Figure 1. Warehouse areas, flows, and activities.
Sustainability 15 14891 g001
Figure 2. Two travel scenarios of forklifts and S/R machines.
Figure 2. Two travel scenarios of forklifts and S/R machines.
Sustainability 15 14891 g002
Figure 3. Four travel scenarios regarding horizontal and vertical movements.
Figure 3. Four travel scenarios regarding horizontal and vertical movements.
Sustainability 15 14891 g003
Figure 4. Collected and estimated power and velocity for horizontal movements.
Figure 4. Collected and estimated power and velocity for horizontal movements.
Sustainability 15 14891 g004
Figure 5. Collected and estimated power and velocity for vertical movements.
Figure 5. Collected and estimated power and velocity for vertical movements.
Sustainability 15 14891 g005
Figure 6. Collected and estimated power of a forklift battery charger.
Figure 6. Collected and estimated power of a forklift battery charger.
Sustainability 15 14891 g006
Figure 7. Major warehouse areas and flows on a simulation model.
Figure 7. Major warehouse areas and flows on a simulation model.
Sustainability 15 14891 g007
Figure 8. Simulated power of a warehouse, S/R machines, battery chargers, and forklifts for 24 h.
Figure 8. Simulated power of a warehouse, S/R machines, battery chargers, and forklifts for 24 h.
Sustainability 15 14891 g008
Figure 9. Half-normal plot of effects on the average EC.
Figure 9. Half-normal plot of effects on the average EC.
Sustainability 15 14891 g009
Figure 10. Two-way interaction plot for the average EC.
Figure 10. Two-way interaction plot for the average EC.
Sustainability 15 14891 g010
Figure 11. Half-normal plot of effects on the average OT.
Figure 11. Half-normal plot of effects on the average OT.
Sustainability 15 14891 g011
Figure 12. Two-way interaction plot for the average OT.
Figure 12. Two-way interaction plot for the average OT.
Sustainability 15 14891 g012
Figure 13. Pareto-optimal front plot for the 25 simulated scenarios.
Figure 13. Pareto-optimal front plot for the 25 simulated scenarios.
Sustainability 15 14891 g013
Table 1. Summary of the literature.
Table 1. Summary of the literature.
ReferenceForward Area
(Picker-to-Parts)
Reserve Area (Parts-to-Picker)Performance Measure(s)Method(s) Used with Simulation
AS/RSAVS/RSSBS/RS
[22] Cycle time and utilizationDesign of Experiments (DOE)
[23] Cycle time and waiting timeAnalytical model
[24] Cost and throughputDOE
[11] Cycle time and EC-
[25] GHG emissions-
[26] Cycle time and ECMathematical model and large neighborhood search
[20] GHG emissions-
[27] Travel time and cycle timeAnalytical model
[28] Cycle time and throughputDOE
[29] Cycle time and throughputDOE
[21] Travel time and costMathematical model and Dijkstra algorithm
[30] EC and energy recovering-
[31] ThroughputAnalytical model
[32] Travel timeDOE
[33] Travel timeAnalytical model
[8] Cycle time, energy regeneration, and ECDOE
Table 2. Parameters of the simulated warehouse.
Table 2. Parameters of the simulated warehouse.
AreaEquipmentSpecification
Forward Area
(Picker-to-Parts)
Length243 ft ( 74.1 m)
Width159 ft ( 48.5 m)
Height18 ft ( 5.5 m)
Number of forklifts1 or 5
Number of battery chargers3
Number of storage locations1296
Number of bays per rack12
Number of tiers per rack3
Number of racks18
Length of rack72 ft ( 21.9 m)
Width of rack6 ft ( 1.8 m)
Height of rack18 ft ( 5.5 m)
Number of aisles18
Length of aisle72 ft ( 21.9 m)
Width of aisle15 ft ( 4.6 m)
Reserve Area
(Parts-to-Picker)
Length168 ft ( 51.2 m)
Width162 ft ( 49.4 m)
Height36 ft ( 11.0 m)
Number of S/R machines4 or 9
Number of I/O points2 or 6
Number of storage locations3000
Number of bays per rack28
Number of tiers per rack6
Number of racks18
Length of rack168 ft ( 51.2 m)
Width of rack6 ft ( 1.8 m)
Height of rack36 ft ( 11.0 m)
Number of aisles4 or 9
Length of aisle168 ft ( 51.2 m)
Width of aisle6 ft
Table 3. DOE for integrated picker-to-parts and parts-to-picker systems.
Table 3. DOE for integrated picker-to-parts and parts-to-picker systems.
FactorsLevels
Low Level (−1)High Level (1)
Number   of   forklifts   ( x 1 )15
Number   of   S / R   machines   ( x 2 )49
I / O   buffer   capacity   of   AS / RS   ( number   of   pallets )   ( x 3 )Discrete U{2, 4}Discrete U{4, 6}
Order   size   ( number   of   pallets )   ( x 4 )Discrete U{1, 2}Discrete U{2, 3}
Flow   rate   ( x 5 )Flows 1 and 4 (67%) & Flows 2 and 3 (33%)Flow 1 and 4 (33%) and Flows 2 and 3 (67%)
Table 4. DOE results for the average EC of integrated picker-to-parts and parts-to-picker systems.
Table 4. DOE results for the average EC of integrated picker-to-parts and parts-to-picker systems.
ScenariosFactors and LevelsAverage
EC (kWh)
x 1 x 2 x 3 x 4 x 5
1−1−1−111246.21
2−1−1−1−1−1178.96
3−1−1111253.75
4−11111288
5−11−111284.52
6−1−11−11259.29
7−11−1−11286.06
8−1−1−1−11257.08
9−1−111−1183.15
10−1−1−11−1176.56
11−111−11282.09
12−1−11−1−1181.68
13−1111−1231.14
14−111−1−1231.48
15−11−1−1−1226.9
16−11−11−1225.69
1711−1−11291.56
1811−11−1259.11
19111−1−1262.79
201−1−1−11275.46
211−1111285.74
22111−11312.42
231−11−11284.55
241−1−1−1−1203.25
2511−111299.6
261−1−111275.36
271−11−1−1209.14
281−111−1205.06
291−1−11−1209.79
3011111315.38
311111−1274.42
3211−1−1−1260.82
Table 5. ANOVA for the average EC of integrated picker-to-parts and parts-to-picker systems.
Table 5. ANOVA for the average EC of integrated picker-to-parts and parts-to-picker systems.
SourceDFAdj SSAdj MSF-Valuep-Value
Model31153,2824944.689.370
Linear5147,24429,448.8532.280
x 1 117,48817,488.5316.10
x 2 139,23839,237.9709.220
x 3 1997997.518.030
x 4 199.30.170.683
x 5 189,51189,510.71617.890
Two-way interactions104891489.18.840
x 1 · x 2 176.90.120.726
x 1 · x 3 1198197.93.580.063
x 1 · x 4 1143142.52.580.113
x 1 · x 5 1405405.27.320.009
x 2 · x 3 153530.960.331
x 2 · x 4 1132132.22.390.127
x 2 · x 5 138473846.969.530
x 3 · x 4 12525.40.460.5
x 3 · x 5 17171.41.290.26
x 4 · x 5 199.10.160.686
Three-way interactions1087187.11.570.135
x 1 · x 2 · x 3 1172171.93.110.083
x 1 · x 2 · x 4 110.70.010.909
x 1 · x 2 · x 5 1355354.66.410.014
x 1 · x 3 · x 4 13232.40.590.447
x 1 · x 3 · x 5 12142143.870.054
x 1 · x 4 · x 5 188.10.150.704
x 2 · x 3 · x 4 12626.10.470.495
x 2 · x 3 · x 5 199.20.170.684
x 2 · x 4 · x 5 15353.50.970.329
x 3 · x 4 · x 5 100.200.951
Four-way interactions515931.80.570.72
x 1 · x 2 · x 3 · x 4 13231.90.580.45
x 1 · x 2 · x 3 · x 5 11413.60.250.622
x 1 · x 2 · x 4 · x 5 13433.70.610.438
x 1 · x 3 · x 4 · x 5 12019.80.360.551
x 2 · x 3 · x 4 · x 5 16059.71.080.303
Five-way interactions1118117.92.130.149
x 1 · x 2 · x 3 · x 4 · x 5 1118117.92.130.149
Error64354155.3
Total95156,823
Table 6. Multiple linear regression (MLR) results for the average EC.
Table 6. Multiple linear regression (MLR) results for the average EC.
EC = b 0 + b 1 · x 1 + b 2 · x 2 + b 3 · x 3 + b 4 · x 4 + b 5 · x 5 + b 15 · x 1 · x 5 + b 25 · x 2 · x 5 + b 125 · x 1 · x 2 · x 5
EstimateStd Errort RatioProb > |t|
Intercept250.50.759149330.02<0.0001
x 1 13.50.75914917.78<0.0001
x 2 20.20.75914926.63<0.0001
x 3 3.20.7591494.25<0.0001
x 4 0.30.7591490.410.6826
x 5 30.50.75914940.22<0.0001
x 1 · x 5 −2.10.759149−2.710.0087
x 2 · x 5 −6.30.759149−8.34<0.0001
x 1 · x 2 · x 5 −1.90.759149−2.530.0138
Table 7. DOE results for the average OT of the integrated picker-to-parts and parts-to-picker systems.
Table 7. DOE results for the average OT of the integrated picker-to-parts and parts-to-picker systems.
ScenariosFactors and LevelsAverage
OT (Hours)
x 1 x 2 x 3 x 4 x 5
1−1−1−1113.87
2−1−1−1−1−12.29
3−1−11113.56
4−111114.20
5−11−1114.64
6−1−11−112.68
7−11−1−113.36
8−1−1−1−113.04
9−1−111−13.53
10−1−1−11−13.19
11−111−112.72
12−1−11−1−12.38
13−1111−13.39
14−111−1−11.81
15−11−1−1−12.03
16−11−11−13.00
1711−1−112.52
1811−11−12.67
19111−1−10.65
201−1−1−111.72
211−11112.09
22111−111.77
231−11−111.29
241−1−1−1−11.00
2511−1113.95
261−1−1112.63
271−11−1−11.00
281−111−12.49
291−1−11−12.65
30111113.14
311111−12.12
3211−1−1−11.14
Table 8. ANOVA for the average OT of the integrated picker-to-parts and parts-to-picker systems.
Table 8. ANOVA for the average OT of the integrated picker-to-parts and parts-to-picker systems.
SourceDFAdj SSAdj MSF-Valuep-Value
Model3190.032.904217.080
Linear579.83215.966493.910
x 1 126.69526.6947157.010
x 2 11.2881.28827.580.008
x 3 12.2282.227613.10.001
x 4 136.49936.4993214.680
x 5 113.12213.122377.180
Two-way interactions108.9650.89655.270
x 1 · x 2 10.5640.56383.320.073
x 1 · x 3 10.6240.62373.670.06
x 1 · x 4 10.2370.23671.390.242
x 1 · x 5 10.1050.10510.620.435
x 2 · x 3 10.4260.42632.510.118
x 2 · x 4 10.5790.57853.40.07
x 2 · x 5 14.8044.803628.250
x 3 · x 4 10.050.05010.290.589
x 3 · x 5 11.2841.2847.550.008
x 4 · x 5 10.2930.29341.730.194
Three-way interactions101.1120.11120.650.762
x 1 · x 2 · x 3 10.0570.05730.340.563
x 1 · x 2 · x 4 10.0350.03470.20.653
x 1 · x 2 · x 5 10.1490.14930.880.352
x 1 · x 3 · x 4 10.2120.21191.250.268
x 1 · x 3 · x 5 10.0980.0980.580.451
x 1 · x 4 · x 5 10.2030.20281.190.279
x 2 · x 3 · x 4 10.0390.03950.230.632
x 2 · x 3 · x 5 10.0010.00130.010.931
x 2 · x 4 · x 5 10.290.28991.70.196
x 3 · x 4 · x 5 10.0280.02780.160.687
Four-way interactions50.1180.02360.140.983
x 1 · x 2 · x 3 · x 4 10.0120.01180.070.793
x 1 · x 2 · x 3 · x 5 10.0180.01810.110.745
x 1 · x 2 · x 4 · x 5 10.0420.04240.250.619
x 1 · x 3 · x 4 · x 5 10.0410.04110.240.624
x 2 · x 3 · x 4 · x 5 10.0050.00450.030.871
Five-way interactions10.0020.0020.010.913
x 1 · x 2 · x 3 · x 4 · x 5 10.0020.0020.010.913
Error6410.8810.17
Total95100.911
Table 9. Multiple linear regression (MLR) results for the average OT.
Table 9. Multiple linear regression (MLR) results for the average OT.
O T = b 0 + b 1 · x 1 + b 2 · x 2 + b 3 · x 3 + b 4 · x 4 + b 5 · x 5 + b 15 · x 1 · x 5 + b 25 · x 2 · x 5
EstimateStd Errort RatioProb > |t|
Intercept2.57728610.04208361.24<0.0001
x 1 −0.5273230.042083−12.53<0.0001
x 2 0.11583880.0420832.750.0077
x 3 −0.1523280.042083−3.620.0006
x 4 0.61660440.04208314.65<0.0001
x 5 0.36971650.0420838.79<0.0001
x 1 · x 5 0.22369120.0420835.32<0.0001
x 2 · x 5 −0.1156490.042083−2.750.0078
Table 10. Effects of x 2 , x 5 , and x 2 · x 5 on average OT.
Table 10. Effects of x 2 , x 5 , and x 2 · x 5 on average OT.
Factor x 2 x 5 x 2 · x 5 Sum of Effects
Effects0.1158390.3697170.223691
Level−11−10.030187
1−1−1−0.47757
−1−11−0.26186
1110.709247
Table 11. Non-dominated DOE scenarios for the integrated picker-to-parts and parts-to-picker system.
Table 11. Non-dominated DOE scenarios for the integrated picker-to-parts and parts-to-picker system.
ScenariosFactors and LevelsMean of Responses
x 1 x 2 x 3 x 4 x 5 EC (kWh)OT (Hours)
2−1−1−1−1−1178.962.29
10−1−1−11−1176.563.19
19111−1−1262.790.65
241−1−1−1−1203.251.00
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Jeon, H.-w.; Ebrahimi, A.; Lee, G.-h. A Simulation-Based Experimental Design for Analyzing Energy Consumption and Order Tardiness in Warehousing Systems. Sustainability 2023, 15, 14891. https://doi.org/10.3390/su152014891

AMA Style

Jeon H-w, Ebrahimi A, Lee G-h. A Simulation-Based Experimental Design for Analyzing Energy Consumption and Order Tardiness in Warehousing Systems. Sustainability. 2023; 15(20):14891. https://doi.org/10.3390/su152014891

Chicago/Turabian Style

Jeon, Hyun-woo, Ahmad Ebrahimi, and Ga-hyun Lee. 2023. "A Simulation-Based Experimental Design for Analyzing Energy Consumption and Order Tardiness in Warehousing Systems" Sustainability 15, no. 20: 14891. https://doi.org/10.3390/su152014891

APA Style

Jeon, H. -w., Ebrahimi, A., & Lee, G. -h. (2023). A Simulation-Based Experimental Design for Analyzing Energy Consumption and Order Tardiness in Warehousing Systems. Sustainability, 15(20), 14891. https://doi.org/10.3390/su152014891

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.