Study on Arching Mechanism of Bridge Pile Foundation: Taking the Shiyangtai No.1 Bridge as an Example
Abstract
:1. Introduction
2. Engineering Background
3. Characteristics of Overlying Soil under Bridge Pile Foundation
3.1. Macro and Micro Analysis of Rock and Soil Mass
3.1.1. Analysis of Rock and Soil Composition
3.1.2. Micro Analysis of Rock and Soil Mass
3.2. Free Expansion Rate Test
3.3. Load Expansion Rate Test
4. Numerical Simulation of Pile Foundation in Goaf
4.1. Establish a Numerical Model
4.2. Model Parameters and Boundary Conditions
4.2.1. Constitutive Model and Parameters
4.2.2. Boundary Conditions
- (1)
- The upper part of the pile foundation and its soil surface are free surfaces and are not limited.
- (2)
- The bottom surface of the model is constrained in the X, Y, and Z directions and is fixed in its support.
- (3)
- Constraints have been set on both sides of the X direction of the model.
- (4)
- The model’s front side in the Y direction is unconstrained, while the rear side is constrained.
4.3. Analysis of Simulation Results
4.4. Mechanism Analysis of Goaf Affecting Pile Foundation Uplift
5. Conclusions
- (1)
- The soil layer beneath the pier contains weak expansive soil, with a maximum free expansion rate of 57%. Under ideal conditions, the axial compression is calculated in the same proportion. After the soil sample expands in water, it cannot generate enough force to cause the bridge pile foundation to rise upward.
- (2)
- This study conducts a numerical simulation to determine the degree of influence of FLAC3D on the pile foundation in the goaf. The results indicate that the pile foundation experiences uplift after coal mining, with a maximum uplift displacement of 255 mm. This value is comparable to the 309 mm uplift amplitude of pier No. 8 of the bridge in the actual monitoring. Therefore, it can be concluded that the goaf is the primary cause of the abnormal uplift of some pile foundations of the Shiyangtai No.1 Bridge.
- (3)
- The analysis of the pile foundation uplift mechanism revealed that the roof of the coal mine goaf collapsed and deformed due to the loss of its bearing capacity. The self-weight of the surrounding rock of the upper mountain caused a double lateral thrust of the accumulation body and the collapse arch. This led to interlayer dislocation of the sandstone soil layer and vertical upward extrusion pressure. The maximum pressure reached 2.5 MPa, which was 1.42 MPa higher than the initial stress value of the pier. This can cause abnormal uplift of the soil around the pile foundation and the bridge pile foundation.
- (4)
- According to previous studies [18], there are two ways to alleviate the uplift deformation of pile foundations: one is stress relief, that is, to eliminate or weaken the side thrust on the pile foundation caused by the collapse of the goaf and to cut off the propagation path of the side thrust. The second is to increase the resistance and increase the anti-slip resistance between the pile foundation and the rock and soil layer, so as to control the displacement amount and displacement rate of the key parts.
Author Contributions
Funding
Data Availability Statement
Conflicts of Interest
References
- Zhao, M.H.; Cao, W.G.; He, P.X. Study on safe thickness of rock mass at end of bridge foundation’s pile in karst and worked-out mine area. Rock Soil Mech. 2004, 25, 64–68. [Google Scholar]
- Wang, H.; Liu, Z.; Zhao, W. Study on stability of karst cave roof under pile loading in bridge construction engineering. Chin. J. Rock Mech. Eng. 2013, 32, 3655–3662. [Google Scholar]
- Gotman, N.Z.; Evdokimov, A.G. Determination of additional load on the bridge foundation pile under karst deformation. J. Phys. Conf. Ser. 2021, 1928, 012058. [Google Scholar] [CrossRef]
- Wang, P.; Ding, H.; Zhang, P. Influence of Karst Caves at Pile Side on the Bearing Capacity of Super-Long Pile Foundation. Math. Probl. Eng. 2020, 2020, 4895735. [Google Scholar] [CrossRef]
- Xu, J.; Cui, Y.; Sun, H.; Fei, D.; Yan, C. Study on the Dynamic Characteristics of Jointed Phyllite. Chin. J. Undergr. Space Eng. 2022, 18, 97–105+113. [Google Scholar]
- Zhong, X.; Xu, J.; Sun, H.; Hou, X.; Wu, F.; Sha, P. Evolution of tensile strength and cracking in granite containing prefabricated holes under high temperature and loading rate. J. Geomech. Geophys. Geo-Energy Geo-Resour. 2023, 9, 116. [Google Scholar] [CrossRef]
- Cheng, T.; Wu, J.; Huang, D. Analysis of the Settlement Behaviors for Pile Group with Low Cap under Precipitation. Chin. J. Undergr. Space Eng. 2016, 12, 1659–1666. [Google Scholar]
- Wei, L.M.; Liu, Y.G.; Feng, S. Settlement calculation of bridge pile foundation caused by dewatering. Hydrogeol. Eng. Geol. 2014, 41, 44–49. [Google Scholar]
- Zhang, C. Analysis of Settlement Characteristics of Friction Pile Groups of high Speed Railway Bridge Caused by Pressure Drop of Confined Water. Railw. Eng. 2021, 61, 36–40. [Google Scholar]
- Wang, F.; Zhuo, Y. Analysis of Influence of Foundation Pit Excavation on Displacement of Existed Railway Bridge Foundation. J. Railw. Eng. Soc. 2012, 29, 28–33. [Google Scholar]
- Zeng, P. Active Control Method for the Influence of Foundation Pit Excavation on the Lateral Displacement of Existing Bridge Pile Foundation; Dalian University of Technology: Dalian, China, 2022. [Google Scholar]
- Zhang, A.J.; Mo, H.H.; Zhu, Z.D. Theoretical Elastio-Plastic Solution for Piles Subject to Lateral Soil Movement. Procedia Earth Planet. Sci. 2012, 5, 58–63. [Google Scholar]
- Li, B.; Sun, W.; Li, G.K. Analysis of influence of subway station deep foundation pit excavation on adjacent bridge piles. IOP Conf. Ser. Mater. Sci. Eng. 2020, 789, 789012033. [Google Scholar] [CrossRef]
- Liang, X.; Cheng, Q.; Chen, J.; Li, L. Model test on pile group foundation of a high-speed railway bridge above a goaf. Rock Soil Mech. 2015, 36, 1865–1876. [Google Scholar]
- Liang, X.; Cheng, Q.G.; Wu, J.J.; Chen, J.M. Model test of the group piles foundation of a high-speed railway bridge in mined-out area. Front. Struct. Civ. Eng. 2016, 10, 488–498. [Google Scholar] [CrossRef]
- Wang, J.; Wu, G.; Zhao, Z. A study of the reasons of abnormal lifting characteristics of foundation near the Jianshanying Large Bridge in Guiding county of Guizhou Province. Hydrogeol. Eng. Geol. 2019, 46, 134–141+158. [Google Scholar]
- Marino, G.; Osouli, A.; Zamiran, S.; Shafii, I. Performance of a Pier Group Foundation in Swelling Rock. Geotech. Geol. Eng. 2017, 35, 91–109. [Google Scholar] [CrossRef]
- Alonso, E.E.; Ramon, A. Corrigendum to Heave of a railway bridge induced by gypsum crystal growth: Field observations. Géotechnique 2013, 63, 707–719. [Google Scholar] [CrossRef]
- Yao, P.; Zhang, W.; Huang, B. Study on the Treatment of Slope Edge Uplift in Mined-out Area Based on Inversion Parameters. J. Wuhan Univ. Technol. 2017, 39, 33–38. [Google Scholar]
- Zhang, Z.; Liu, H. A special case history of the environmental impact by underground mining-the mechanism and control measures of the ground upheaval deformation of Hancheng power plant. Earth Sci. Front. 2001, 8, 285–295. [Google Scholar]
- Fu, K.; Cai, J.; Zhao, J. The Correlation Analysis of Bridge Piers Settlement & Rising and Geological Condition of Jianshanying Bridge of Guiyang-Guangzhou High Speed Railway. J. Railw. Eng. Soc. 2019, 36, 47–53. [Google Scholar]
- Qu, Z.; Han, Z.; Tang, H.; Xu, J.; Wang, H.; Liu, Y. Study on Numerical Simulation of Arch Mechanism of Bridge Pile Foundation. Buildings. 2024, 14, 146. [Google Scholar] [CrossRef]
- Zheng, Z.; Deng, B.; Li, S.; Zheng, H. Disturbance mechanical behaviors and anisotropic fracturing mechanisms of rock under novel three-stage true triaxial static-dynamic coupling loading. J. Rock Mech. Rock Eng. 2023. [Google Scholar] [CrossRef]
Shiyangtai No.1 Bridge | Drilling Number | Drilling Position |
---|---|---|
Left line | No.1 borehole | 4.6 m on the left side of pier No. 8 |
No.2 borehole | Pier No. 8 small pile side 3 m | |
Right line | No.3 borehole | 3.4 m on the left side of pier No. 8 |
Drilling Number | Sample Number | Volumetric Change (mL) | Free Swelling Ratio (%) |
---|---|---|---|
ZK1 | ZK1-Soil sample 1 | 4.2 | 42 |
ZK1-Soil sample 2 | 5.3 | 53 | |
ZK2 | ZK2-Soil sample 1 | 2.5 | 25 |
ZK2-Soil sample 2 | 5.1 | 51 | |
ZK3 | ZK3-Soil sample 1 | 3.5 | 35 |
ZK3-Soil sample 2 | 5.7 | 57 |
Drilling Number | Sample Number | Initial Mass (g) | Initial Height (mm) | Sample Deformation (mm) | Load Expansion Rate (%) |
---|---|---|---|---|---|
ZK1 | ZK1-Soil sample 1 | 89.5 | 21.00 | 0.14 | 0.67 |
ZK1-Soil sample 2 | 85.5 | 21.00 | 0.20 | 0.95 | |
ZK2 | ZK2-Soil sample 1 | 83.6 | 20.00 | 0.06 | 0.30 |
ZK2-Soil sample 2 | 87.1 | 20.00 | 0.15 | 0.75 | |
ZK3 | ZK3-Soil sample 1 | 85.7 | 20.00 | 0.11 | 0.55 |
ZK3-Soil sample 2 | 82.6 | 21.00 | 0.23 | 1.09 |
Soil Horizon | Gravity /(kN·m3) | Elastic Modulus /MPa | Poisson | Cohesion /kPa | Friction /(°) |
---|---|---|---|---|---|
Topsoil | 16 | 30 | 0.35 | 22 | 32 |
Loess | 15 | 16 | 0.30 | 35 | 20 |
Strongly weathered Siltstone | 20 | 5200 | 0.30 | 120 | 25 |
Mid-weathered Siltstone | 23 | 5800 | 0.25 | 305 | 29 |
Sandstone | 24 | 6350 | 0.25 | 350 | 30 |
Name | Grade of Concrete | Gravity /(kN·m3) | Poisson | Elastic Modulus |
---|---|---|---|---|
Pile foundation | C40 | 25 | 0.2 | 3.25 × 104 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Wang, L.-H.; Sun, G.-Z.; Xu, J.-B.; Wu, X.; Hou, X.-M.; Han, Z.-M. Study on Arching Mechanism of Bridge Pile Foundation: Taking the Shiyangtai No.1 Bridge as an Example. Buildings 2024, 14, 243. https://doi.org/10.3390/buildings14010243
Wang L-H, Sun G-Z, Xu J-B, Wu X, Hou X-M, Han Z-M. Study on Arching Mechanism of Bridge Pile Foundation: Taking the Shiyangtai No.1 Bridge as an Example. Buildings. 2024; 14(1):243. https://doi.org/10.3390/buildings14010243
Chicago/Turabian StyleWang, Lian-Hua, Guo-Zheng Sun, Jiang-Bo Xu, Xiong Wu, Xin-Min Hou, and Ze-Min Han. 2024. "Study on Arching Mechanism of Bridge Pile Foundation: Taking the Shiyangtai No.1 Bridge as an Example" Buildings 14, no. 1: 243. https://doi.org/10.3390/buildings14010243
APA StyleWang, L. -H., Sun, G. -Z., Xu, J. -B., Wu, X., Hou, X. -M., & Han, Z. -M. (2024). Study on Arching Mechanism of Bridge Pile Foundation: Taking the Shiyangtai No.1 Bridge as an Example. Buildings, 14(1), 243. https://doi.org/10.3390/buildings14010243