Next Article in Journal
Integration of Photovoltaic Shading Device and Vertical Farming on School Buildings to Improving Indoor Daylight, Thermal Comfort and Energy Performance in Three Different Cities in China
Previous Article in Journal
Experimental Study on the Effect of the Displacement Rate on the Shear Strength of Coastal Soft Soil
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Correction

Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421

1
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
2
Guangxi Xinfazhan Communication Group Co., Ltd., Nanning 530029, China
*
Authors to whom correspondence should be addressed.
Buildings 2024, 14(11), 3500; https://doi.org/10.3390/buildings14113500
Submission received: 23 October 2024 / Accepted: 28 October 2024 / Published: 31 October 2024
  • Missing Citation
In the original publication [1], “Kim, Y.; Bruland, A. Analysis and Evaluation of Tunnel Contour Quality Index. Autom. Constr. 2019, 99, 223–237.” was not cited in Figures 18 and 20. The citation has now been inserted in the captions of Figures 18 and 20 and should read as follows:
Figure 18. Fractal dimension calculation diagram of tunnel profile curves. (See reference [45] Figure 9b). Reproduced with permission from Automation in Construction granted copyright by Central South University; published by ELSEVIER, 2019.
Figure 20. On-site investigation results of a profile the BBT tunnel case. (See reference [45] Figures 9b and 11). Reproduced with permission from Automation in Construction granted copyright by Central South University; published by ELSEVIER, 2019.
The authors state that the scientific conclusions are unaffected. This correction was approved by the Academic Editor. The original publication has also been updated.

Reference

  1. Zhou, J.; Gao, S.; Luo, P.; Fan, J.; Zhao, C. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Zhou, J.; Gao, S.; Luo, P.; Fan, J.; Zhao, C. Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421. Buildings 2024, 14, 3500. https://doi.org/10.3390/buildings14113500

AMA Style

Zhou J, Gao S, Luo P, Fan J, Zhao C. Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421. Buildings. 2024; 14(11):3500. https://doi.org/10.3390/buildings14113500

Chicago/Turabian Style

Zhou, Junjie, Shan Gao, Pingkuang Luo, Jiale Fan, and Congcong Zhao. 2024. "Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421" Buildings 14, no. 11: 3500. https://doi.org/10.3390/buildings14113500

APA Style

Zhou, J., Gao, S., Luo, P., Fan, J., & Zhao, C. (2024). Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421. Buildings, 14(11), 3500. https://doi.org/10.3390/buildings14113500

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop