Zhang, H.; Qin, C.; Zhang, W.; Xu, Z.; Xu, G.; Gao, Z.
Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies. Systems 2023, 11, 103.
https://doi.org/10.3390/systems11020103
AMA Style
Zhang H, Qin C, Zhang W, Xu Z, Xu G, Gao Z.
Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies. Systems. 2023; 11(2):103.
https://doi.org/10.3390/systems11020103
Chicago/Turabian Style
Zhang, Hongliang, Chaoqun Qin, Wenhui Zhang, Zhenxing Xu, Gongjie Xu, and Zhenhua Gao.
2023. "Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies" Systems 11, no. 2: 103.
https://doi.org/10.3390/systems11020103
APA Style
Zhang, H., Qin, C., Zhang, W., Xu, Z., Xu, G., & Gao, Z.
(2023). Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies. Systems, 11(2), 103.
https://doi.org/10.3390/systems11020103