1. Introduction
One of the main outcomes resulting from the transition towards new smart grids is expected the better observability and monitoring of the whole grid [
1]. This observability is expected due to the bulk installation of smart meters, as well as the monitoring of transformer stations, ring main units, etc. [
1,
2]. Even though there is still lot of concern and research devoted to the processing of such a huge amount of recorded data [
3] and its reliable communication back to distribution system operator database [
4,
5], the usefulness of measurement data availability is already obvious [
1,
2,
6,
7,
8,
9,
10,
11]. One of the fields that will benefit from the detailed measurement data availability would be distribution system modelling, planning, and operation optimization [
1,
6,
7,
11,
12,
13,
14], which will be more accurate.
A commonly performed task as part of distribution system planning is the calculation of load flow. Although the solution of a non-linear power flow problem is quite well addressed [
15,
16,
17], there is still some effort mainly devoted in computational and time efficiency of this numerically intensive task [
18]. A part of load flow studies is also appropriate the modelling of connected loads, which can be as with constant impedance, constant current, or constant power, i.e., ZIP load model [
19]. Basically, the historical data are very useful in the case of modelling verification, as well as the mapping of possible extreme states of the network. Thus, it is expected that the availability of more accurate data from bulk deployment of measurement will definitely lead to more accurate load models, power flow studies, load forecasting, prosumers tariffs setting, etc.
However, data processing shows that even the currently applied smart metering (SM) technology has a number of drawbacks. Current communication technologies have been shown to exhibit considerable delays and fail to achieve high reliability [
4,
5,
20]. Another quite restricting bottleneck is the non-unified sorting of data that were measured from individual phases. It cannot be assumed that all measured data are correctly assigned to reference phases of power system [
21].
The problem of non-unified phase allocation can be addressed by one of the following three methods. The easiest is by proper documentation of all changes to distribution system connection by maintenance personnel. Another one, although costly, is by using special per phase signal injection and receiver devices [
22,
23] that can match the non-unified phases with reference ones based on the phase with injected signal. The last method is by post-analysis of measured data and finding some type of correlation between series of measurement with non-unified phases and reference measurement [
21,
24,
25,
26,
27,
28,
29,
30].
All of the aforementioned aspects also apply to the case of monitoring of individual MV/LV distribution transformer stations (DTS), which are equipped with power quality (PQ) monitors (analyzers with PQM) by distribution system operators (DSO). Thus, this article is focused on preliminary analysis of bulk measurement of all DTSs in the distribution grid of Brno-stred, that is expected to be pilot project of transition of this extensive traditional urban distribution network towards the smart grid. The analysis is focused on finding the usability and suitability of long term measured data (half year 06/2016–02/2017) from the LV side of all 82 transformers supplying the whole LV distribution system (DS) of the Brno-stred dense mesh with more than 3800 customers. The analysis was primarily focused on finding statistically significant operating states that will be used and helpful for future per phase modelling of this LV network. As the problem with non-unified phases was also identified during the analysis, it was also addressed in this study. The analysis of DS Brno-stred is also unique due to the fact that the LV network is operated as a dense mesh urban network to increase the reliability [
12]. As this type of operation might not be so common, not many publications were published dealing with dense mesh networks. Publications [
6,
9] state that, due to the transition to smart grids, the urban dense mesh networks might need more attention to identify their strong and weak points in the context of changes of these old traditional networks towards bidirectional power flow grids with a high penetration of renewable sources.
The per phase statistical analysis might be helpful for the estimation of load model parameters and forecasting future loading. For example, paper [
31] used F-statistic to obtain the load model as a function of voltage and frequency while using data from phasor measurement units. Other researches [
32] presented a simple histograms of three years historical data to analyze the correlation between power and voltage changes. Another papers [
33,
34,
35] used significant statistical values, i.e., mean, median, standard deviation (SD), percentiles (5, 95, 99 etc.), of historical measured data for the estimation of load parameters as well as for evaluation of load forecasting. Gaussian mixed model is also a very powerful statistical approach for the estimation of loads. Its application on historical data was presented in [
36,
37,
38]. In [
39], the loads were modelled by normal and log normal distribution function with division for each of seven days within week. As the input to the load modelling the researchers used usually only summed 3-phase active power values, bulk frequency, phase to phase voltage, and current. Very few or almost none of the researchers dealt with modelling of reactive power loading as well as conducting analysis on per phase basis. Thus, the statistical analysis is done in this paper for the active and reactive power values for each phase separately in the view of dense mesh network (i.e., analysis for all transformers at the global level and also for most (T47) and the least (T61) loaded transformers for different time intervals during days).
2. PQ Monitor Measured Data Processing
The main function of the PQ monitor is to record voltage and current in a three-phase system (L1, L2, L3). The instantaneous values of the voltage and current in regular time intervals might be given by the sampling rate that is an integer multiple (e.g., 32) of the system frequency/period (
Ts = 20 ms). In the context of monitoring power quality based on [
40,
41], in a three-phase system the rms values of voltage and current for each phase in measuring time interval (
Tm = 200 ms) are obtained by the following equations
where
Ux,rms is the rms voltage value in the phase
x (i.e., 1, 2 or 3),
N is the total number of measured samples,
n is a serial number, and
ux(
n) is the data sequence of the instantaneous phase values of the sampled voltage waveform.
where
Ix,rms is the rms value of the current and
ix(
n) is the data sequence of the instantaneous phase values of the sampled current waveform.
The apparent power for each phase is evaluated from Equations (1) and (2) at a given moment, being measured over a given time interval (i.e.,
Tm)
Furthermore, the active power for each phase is defined as
The measurement of reactive energy, as implemented by the manufacturers, generally varies. The problem here might also be caused by the varied definition of reactive power. Usually, it is either the reactive component of power at the fundamental harmonic frequency, which is preferred by the standards, or it is defined by the sum of all reactive powers at the finite number of harmonic frequencies, or it can be calculated including the deformation power as
These active and reactive powers/energy flows are further sorted as per four quadrants (Q1–Q4) by [
42], with the voltage at the measuring point being taken as the reference vector with zero phase angle. Reactive energy is always defined in association with active energy. Thus, the reactive energy is separately defined for each quadrant.
Figure 1 shows the power flow quadrants.
In general, PQ monitors measure and evaluate a lot of quantities. Thus, the unique marking of the measured quantities (e.g., aggregated active and reactive powers) is accomplished with the use of the DLMS standard [
43], through Object Identification System (OBIS) codes, which are a part of the COSEM specifications and some of them are transferred to IEC standards, also see
Figure 1.
From the power quality monitoring point of view based on [
40], it is also necessary to consider standard aggregation interval for PQ monitors as
N = 10 min. Thus, the time aggregation of the voltage can be also defined with respecting [
41]
The aggregated value of the current is determined in the same way.
In the case of the short-term voltage drop event, Equation (1) is applied over measuring time interval
Ts/2 = 10 ms. The obtained
Ux,rms/2 for each phase is compared with the limits 90% of the nominal voltage according to [
40]. Thus, it can be considered that the beginning and ending time of this event are recorded with the maximal inaccuracy 10 ms.
4. Results
4.1. Power Loading-Over All Transformers
The basic criterion that was applied by E.ON Distribuce a.s. on the dense-mesh network while it is under operation consists in keeping the loads of the individual transformers within exactly defined limits. Meeting the criterion then leads to ensuring the correct and reliable functioning of the network as a whole. This basic criterion results from the design of the complex topology and size of the network, as well as the fact that it was not possible in the past to implement extensive and efficient (“smart”) monitoring of this network. The criterion is mainly based on the ability to ensure a certain extent of autonomous reliability of the network. Autonomous reliability consists in ensuring uninterrupted dense-mesh network operation, even if several transformers fail. The network concept ensures the ability of unaffected transformers to take over the load of the faulted transformers. The DSO requires an operating load of the individual transformers of about 25% in a steady state, or for the maximum power load to ideally not exceed 50% of the transformer rated power, for the proper functioning of the network as a whole.
Thus, the fulfilment of this criterion is assessed in the first part of the analysis, where maximum and minimum power loading of each of 56 transformers (i.e., T1–T14, T16–T54, and T60–T62) was identified. This analysis was only conducted for time period of 01/2017, where complete date for all 56 transformers were available (
Section 3.3). The power loads were determined as the sum of the power loads of the individual phases.
Figure 5 illustrates the reached maximum power load of individual transformers.
Figure 5 shows that the maximum power load of approximately 311 kVA (more than 49%
Sn) is reached by transformer T47. A total of 32 transformers have the maximum power load below 25%
Sn and 23 transformers are in the range (25–40%)
Sn. The operating criterion of this DS can be considered to be fulfilled, as the maximums are not higher than 50%
Sn based on analyzed 5 min. data. However, it should be noted that the DSO does not exactly specify the technical requirements for performing the measurement based on which fulfillment of the criterion should be verified.
Figure 6 shows the minimum power load to illustrate the opposite extreme loading of individual transformers.
The minimum power load of approx. 24 kVA (i.e., approx. 3.8% Sn) is recorded for transformer T61. The values indicate that most transformers do not exceed the level of 50 kVA (approx. 8% Sn).
As the results above provide only a basic picture of the possible extreme operating conditions, the information needs to be understood in the context of averaging over the used 5 min. aggregation interval and further averaged over the three phases as only one value. Therefore, the analysis also includes the statistical evaluation of the magnitudes, together with power flow direction (see also reference direction in
Figure 1) of the active and reactive powers in the secondary circuit of each transformer.
Figure 6 shows the development of the measured cumulative frequencies of the active and the reactive powers of all analyzed transformers. The single-phase power load data were mixed together for all three phases and
Figure 7 depicts cumulative frequencies over all three phases without distinction between separate phases to obtain the cumulative frequencies (single phase data are depicted, not summed powers for all three phases). For a better understanding of the occurrence of the active and the reactive power, it also shows the values separately for the Weekdays and the Weekend, and it is generally proceeded 3 × 8928 records/month/transformer.
Figure 7 shows that only the consumed active power, approximately 5–84 kW, was realized on transformers and the supplied active power was not realized (for the monitored period 01/2017). Approximately 75% of all active powers ranged up to 40 kW on Weekdays and up to 28 kW during Weekends. From the reactive power point of view, the consumption of approximately (0–71) kvar and the supply of approximately (−18–0) kvar were both realized. It also applies to the reactive power values that the ratio of values for the supplied and consumed reactive power is 40/60 for the Weekdays and 50/50 for the Weekend. Approx. 80% of all values of the supplied reactive power ranged from −18 kvar to −9 kvar (on the Weekdays and on the Weekend) and 90% of all values of the consumed reactive power ranged from 0 kvar to 20 kvar (on the Weekdays) and to approximately 10 kvar (on the Weekend).
Although there were clearly identified the specific directions of the active and reactive power/energy flows at LV (i.e., consumption vs. supply), it is necessary to point out that all of the installed transformers (i.e., T1–T82) have Dyn connection, and thus the directions need not to explicitly correspond to the power flow directions at HV. With regard to the dense-mesh topology, theoretically plausible explanations for the single-phase supply of the active power may be e.g., (i) the unique configuration and non-symmetrical load character with a significant effect on the size and voltage angle of individual transformers, (ii) failure states on 22 kV side and blowing of one HV fuse, and (iii) operating condition while considering the existence of an unsuitable configuration, where power also flows over this dense-mesh network rather than through the HV network.
Generally,
Figure 7 entails the loss of information regarding the possible concurrence of consumption and supply at the level of individual phases of all transformers, because the unified connection of phase measurement does not exist there.
4.2. Voltage Magnitude Distribution Analysis
The kind of complementary analysis that was carried out in this paper is voltage tolerance analysis. The measurement data were evaluated for compliance with voltage tolerance limits of +10% and −15%
Un for 100% of time [
40] for ‘all’ 56 transformers in the Brno-stred dense mesh. The non-unified phase measurement might not be a problem here, as this information regarding voltage compliance can still be found in the available data.
Figure 8 shows the histograms of the individual rms phase voltages of 56 transformers without considering the unification of their phase measurements. (i.e., the single-phase histogram was constructed over voltage measurement data from denoted phase one from all transformers together, etc.). The histogram data samples are divided into 50 bins.
The analysis is performed over samples of the individual phase voltages of all transformers, which amounts to 1,064,448 samples for the Weekdays (i.e., 6336 records/phase/transformer/month) and 435,456 samples for weekends (i.e., 2592 records/phase/transformer/month). The values show that all rms voltage values are within the required voltage tolerance [
40] during the Weekdays and Weekend. Although the voltage tolerance should be assessed on 10 min. aggregation interval, the eventual reaggregation of 5 min. samples to average 10 min. values would only smoothen the voltage waveform and thus the voltage tolerance would be still met. The problem of non-unified phases between different measurements might lead to problems in identifying which particular phase is voltage tolerance compliant or non-compliant.
4.3. Transformers with the Maximal T47 and Minimal Power Load T61
Although the unified measurement is not resolved, it is relevant to carry out the partial analysis of individual transformers per each individual phase for 01/2017. A detailed picture can thus be obtained while using percentiles (PCTL) of the occurrence frequencies of power values during the day. In the context of the information above, the article further provides a detailed assessment of the active and reactive power through percentiles/histograms, in particular it presents individual assessments for T47 and T61 differentiating the Weekdays vs. the Weekend.
4.3.1. T47 and T61 Not Sorted Active and Reactive Power to Quadrants
Firstly,
Figure 9 shows an overview of the development of the relative frequencies of three-phase apparent power for T47 (with maximum power load) and at T61 (with minimum power load).
The histograms show that, for T47, all of the values ranged from 33–49%
Sn, approximately 90% of all values were then below 46% of the nominal apparent transformer power. For T61, approximately 70% of all values were below 12% of the nominal apparent power of the transformer and the maximum power did not exceeded 20%. In general, if different energy flows/powers (consumption vs. supply) are simultaneously realized per individual phases, the average three-phase value is unsuitable and it entails a loss of information and lower energy/power is obtained. Thus,
Table 2 and
Table 3 quantify the corresponding percentiles for
Figure 10 and
Figure 11, which present an overall comparison of cumulative frequencies of the active and reactive power per phase for T47 and T61.
The results in
Table 2 prove following:
in terms of the active power, phase L1 had the highest load and phase L3 the lowest, both during the Weekend and on the Weekdays. On average, the load on the Weekdays was approximately 20% higher than during the Weekend (for 90th PTCL);
in terms of reactive power, phase L3 had the highest load and phase L1 the lowest, both during the Weekend and on the Weekdays. On average, the loading on the Weekdays was approximately 4% higher than during the Weekend (for 90th PTCL); and,
the comparison of percentiles in individual phases indicates that the power distribution in the individual phases is relatively even, with 90th and 50th PTCLs differing in individual phases by only about 3–4 kW, for both the analyzed Weekdays and Weekend periods (i.e., for example the difference for the 90th PTCL on the Weekdays-the largest L1 ~61.44 kW, and the smallest L3 57.61 kW difference of about 4 kW). As for reactive power, the difference was similar in size to the active power of about 3–4 kvar. The reactive power was comparable in size to the active power.
The results in
Table 3 prove the following:
in terms of the consumed active power, phase L2 had the highest load and phase L1 the lowest, both during the Weekdays and the Weekend. On average, the load on the Weekdays was approximately 32% higher than during the Weekend (for 90th PTCL); and,
if the transformer provides the consumption as well as the supply of the reactive power in the monitored period and the analyzed data are not divided according to the power character (i.e., the data series cumulates all of the consumed/supplied reactive powers), and then the evaluation of the reached reactive power through percentiles is not representative.
In general, the results in
Table 3 also confirm that, in order to do the basic statistical evaluation of the transformer that provides the consumption of the active power and at the same time the consumption or the supply of the reactive power, it is firstly appropriate to sort the data based on the character of the reactive power.
4.3.2. T47 and T61 Sorted Active and Reactive Powers to Quadrants and Their Statistical Values
Sorting is separately performed for each phase in the context of quadrants Q1 and Q4, as in
Figure 1. Thus, the following
Table 4 provides this sorting by presenting a percentage of the numbers of single-phase reactive power records, with both the differentiation between the Weekdays vs. Weekend and the distribution considering four time-periods during the day A (22:00:00–03:59:59), B (4:00:00–07:59:59), C (08:00:00–15:59:59), and D (16:00:00–21:59:59).
The sorting for T47 is irrelevant, because there is no change of the character of the reactive power (i.e., only
Q consumption, 100% of the records fulfill condition
Q > 0), therefore there are the results for T61 in
Table 4, and these show:
during the Weekend/A and Weekend/B, the number of records corresponding to the supplied reactive power predominates in phases L1 and L3, and the consumed reactive power predominates in phase L2;
during the Weekend/D and Weekdays/B the number of records of the consumed reactive power significantly predominates in L2, while in L1 and L2 the balance of represented samples is leveled;
during the Weekend/C and Weekdays/A the number of records of the supplied reactive power predominates in all phases; and,
significant and predominating reactive power character (the consumption or the supply) is identifiable per phase for each specific time intervals during the day in individual parts of the week, e.g., solely the supplied reactive power is identified for T61 during the Weekdays/C period in phases L1 and L2, and it is also almost 100% in phase L3. A similar and also strong dependence is also observed in the Weekdays/D.
The data also generally include the values that stand for zero reactive power (see
Table 4). However, these were not considered further in the statistical evaluation due to their percentage being insignificant.
The following
Table 5,
Table 6 and
Table 7 present a summary statistical analysis by the percentiles. Specifically, for T61,
Table 6 and
Table 7 present the percentile results performed on the sorted samples according to
Table 4. The data were initially sorted according to the character of the reactive power into two groups for consumed
Q (quadrant Q1) and supplied
Q (quadrant Q4) to determine the percentiles. In this sorting, the corresponding active power samples
P were also sorted for the corresponding
Q samples. Over such sorted data, the percentiles were subsequently set separately for the active power (for given character of the reactive power) and for the reactive power.
For transformer T47, based on the comparison of 90th PTCL results from
Table 2 (only the summary Weekdays and Weekend percentiles are considered) and
Table 5 (considers both the summary percentiles and the individual time intervals A, B, C, D during day) can be observed with following dependencies:
the summary Weekend PCTLs of the single-phase active and reactive power achieved are comparable to those achieved during the Weekend/C and Weekend/D with differences of approximately 1–3%;
a similar dependence is also observed at the summary Weekdays PCTLs vs. Weekdays/C and Weekdays/D, although these differ by approximately 1–4%;
for other time intervals A and B it is possible to observed more significant differences against the summary PCTLs
- ○
the summary Weekend PCTLs of the active power are approx. 10% higher than those for the Weekend/A, for the reactive power they are approx. 1–2% higher,
- ○
the summary Weekend PCTLs of the active power are approx. 20% higher than those for the Weekend/B, for the reactive power they are approx. 4–5% higher,
- ○
the summary Weekdays PCTLs of the active power are approx. 25–29% higher than those for the Weekdays/A, for the reactive power they are approx. 5% higher, and
- ○
the summary Weekdays PCTLs of the active power are approx. 24% higher than those for the Weekdays/B, for the reactive power they are approx. 5–8% higher.
Finding the interdependencies for T61 is very complicated, not only for the confrontation summary percentiles (in
Table 3) with the results in
Table 6 and
Table 7, but also generally from the individual percentiles in case of the change of the character of reactive power flow. Thus, it would first be necessary to define the specific purpose for which the analysis is to be prioritized (e.g., reactive power flows, voltage magnitude, unbalance, etc.) and it should be performed over the phase unified data of all transformers. On the other hand, the search for basic interdependencies can also be done while using other statistical indicators. Therefore, the following part of the analysis evaluates the values of the maximal and minimal power, the mean and the standard deviation in more detail over the sorted data.
Table 8,
Table 9 and
Table 10 show the obtained results.
The results in
Table 8 show that T47 has the maximal consumed active and reactive power during the Weekdays approx. 15–17 kW and 2–3 kvar higher than during the Weekend. Furthermore, transformer T47 reaches approximately the same average values of the minimal consumed active and reactive power during the Weekdays and the Weekend.
The results in
Table 9 show that the maximal consumed active and reactive power for transformer T61 during the Weekdays is approx. 11 kW and 2.5–3 kvar higher than during the Weekend. The minimal consumed active power during the Weekdays is approx. 4–6 kW lower than during the Weekend and the minimal consumed reactive power is similar for the Weekdays and Weekend.
The results in
Table 10 show that the maximal consumed active power for transformer T61 has differences of approx. 3–6 kW and this transformer reaches similar values of the maximal supplied reactive power during the Weekdays and Weekend. This similarity is also observed for the minimal consumed active and supplied reactive power, respectively.
the highest mean values for T47 are usually achieved in the Weekdays/C. The minimal differences of approx. 11% are in the comparison with the Weekdays/D, for other interval the differences are roughly 30–35%;
the highest mean values achieved for T47 during the Weekend are in the Weekend/D but differences with other Weekend intervals are under 18% for the active power and under 6% the reactive power;
the mean values of the active power for T47 are approx. 14–25% higher in the intervals Weekdays/C and Weekdays/D than those for Weekend/C and Weekend/D, for the reactive power they are similar in all intervals and the most of differences are lower than 6%; and,
similar dependencies can be found for T61 as for T47, when the values are usually higher during the Weekdays than during the Weekend. Specifically, the active power values during the Weekdays are usually 11–33% higher than those during the Weekend and the reactive power differs in the range 1–54%. Although high percentage differences between corresponding intervals were achieved, it should be noted that, in terms of absolute values, these are comparable to differences for the transformer T47 when these are not higher than 5% and 1% of the nominal power of transformer, e.g., for the active power (10.5 kW/per phase) and the reactive power (2.5 kvar/per phase).
4.4. Unification of Phase Allocation
The authors have demonstrated earlier in [
21] the use of the phase identification method on the experimental one-year worth of voltage data from smart meters that were installed in DS with radial topology. However, the sensitivity of this method is highly dependable on the amount of long-term data and it is better suited for radial topology of distribution network. Therefore, in the case of DS Brno-stred with an extensive dense-mesh topology, a different post processing approach of phase identification from the one that was published in [
21] was used. The approach is basically based on the use of recorded voltage events/drops by PQ monitors for T1–T62.
Table 11 quantifies these voltage drops in the transformer T1, which is considered as a reference one from the phase identification point of view.
Generally, the short-term voltage drop records include the initial drop time, drop duration, and the minimum effective voltage and current values in each phase.
Table 11 shows the three-phase voltage drops that occurred twice and the two-phase voltage drops that occurred seven times. If the short-term voltage drops in one (L1, L2 or L3) or two phases (L1-L2, L1-L3, or L2-L3) are available, it is theoretically possible to use them to unify the measurement phases with reference one in a whole monitored system. In the case of a single-phase voltage drop, this significant drop can also be observed in each one specific phase of transformers. On the other hand, in the case of two-phase voltage drop, the object of observation is the phase without voltage drop. Thus,
Table 12 brings the results of the phase identification with the reference T1 while using the mentioned two-phase voltage drop events (i.e., events 2–8 in
Table 11) that were recorded by individual PQ monitors.
The results indicate good usability of the short-voltage drop events for the phase identification/unification of the measurement, when the phases were assigned to transformers T1–T59. However, in the case of three transformers (T2, T3, and T42), a reverse phase sequence was assigned. The rest of transformers was assigned a correct phase sequence. The phases of transformers T60–T62 remained unidentified because at the time of the voltage events recorded at T1, the PQ monitors at these transformers have not been installed yet. The results also show the ability to identify the individual phases of the measurement in 100% of the cases when PQ monitors recorded the short-voltage drop events. Specifically, 37 transformers have the same phase measurement position as the reference one. However, it is necessary to verify the results by comparing them with the actual PQ monitors HW connection directly at DTS. As this verification has not been done yet, this article further presents only a detailed analysis over the non-unified data.
5. Discussion and Conclusions
The mathematical modeling of a distribution system requires both detailed technical parameterization of individual network elements and the quantification of the power flows over the time. Especially in the case of a complex dense-mesh topology, detailed mapping of LV customer behavior is needed for the purpose of the model verification and its credibility. Even though the following conclusions are mainly the beneficial inputs for this specific model, from the global point of view, it also contributes to finding the interdependencies of power flows over time in more detail.
From the analysis of all transformers the results show:
the higher power load is achieved on the Weekdays than on the Weekend, specifically 75% of all single-phase active powers range up to 40 kW on the Weekdays and 28 kW on the Weekend;
the ratio of the supplied and the consumed reactive power is 40/60 on the Weekdays and 50/50 on the Weekend;
the transformers with a higher power load do not show the changes of the reactive power character. Specifically, there is only the consumed reactive power and no supplied one; and,
in general, for the transformers with a low power load the supplied reactive power is inversely proportional to the consumed active power.
In the case of the analyses of limit states based on detailed results for the transformer with the maximal power load (T47) and the minimal power load (T61), the following can be observed.
For T47 with maximal power load and with no change of the reactive power character the results show:
it operates 35% of time with tan phi < 1 (on the Weekdays). It also operates 100% of time with tan phi > 1 at the level of phase L2 and L3, and it operates at L1 with tan phi > 1 approx. for 95% of time (on the Weekend);
the active and reactive power during the Weekdays is approximately 20% and 4% higher than during the Weekend;
the active and reactive powers in the individual phases are relatively even;
in more detail, these summary weekdays and weekend power flows are comparable to those that were achieved during time interval C (08:00:00–15:59:59) and D (16:00:00–21:59:59) with differences of approximately 1–3% for the Weekdays and approximately 1–4% for the Weekend at the same parts of the week; and,
the summary power flows are higher than during interval A (22:00:00–03:59:59) and B (4:00:00–07:59:59). Specifically, for the active and reactive power up to 29% and 8% during the Weekdays and 10% and 5% during the Weekend.
For T61 with minimal power load and with the change of the reactive power character the results shown:
it always operates with tan phi < 1 at the level of individual phases, when the minimum active power is not less than the maximum reactive power value in a given interval;
over the Weekend it has an approx. twofold increase in frequencies of the supplied reactive power in individual phases than during the Weekdays; and,
the active power during the Weekdays is usually 11–33% higher than during the Weekend and for the reactive power the differences are in range 1–54%, but in terms of the absolute values these are comparable to differences for the transformer T47.
Furthermore, a novel approach that is presented in this article is the demonstration of the phase unification within the measurements of the short-term voltage drops that were recorded by PQ monitors instead of the most often used process demanding HW or SW techniques. Unlike these techniques, the shown approach is not both computationally demanding, because no complex evaluation of the continuous voltage trends are observed and also financially demanding because it used installed PQ monitors and no additional HW is required to be installed within the distribution system. Although the results show the ability to identify phases in 100% of the cases, this approach has still to be verified via DSO in the real distribution system and, as a result of the application of the short-term voltage drops, there is also a risk that no voltage events will generally occur. The analysis of statistically sufficient sample of data (at least 1 year) is also necessary in order to relevantly assess the DS behaviour based on long-term measured values from DTS.
Moreover, the results show that it is not necessary to assess the voltage magnitudes while using the measuring over the unified phase data. On the other hand, the unified data can provide better information in which particular phase the voltage tolerance is compliant/non-compliant, thus the complex dependences can be generally observed in the context of a whole distribution system.
The results also have a practical contribution directly to the DSO. The main operating criterion of the analyzed municipal distribution system has not been complexly evaluated prior to the installation of PQ monitors. Thus, the results confirm the fulfilment of the established criterion and the power load of all transformers is below the required upper limit of 50% of Sn. It should be noted that the power load has always to be calculated from the rms/trms voltage and current values. Unlike other incorrect approaches, this takes the influence of the process of data aggregation and the change of the reactive power character in the measurement interval into account as well.