1. Introduction
As a type of energy supply for distributed energy, the combined cooling, heating and power (CCHP) system has many advantages, such as energy diversity, energy supply security and environmental friendliness [
1]. It recycles the low-temperature waste heat generated by the power generation process, which can give a comprehensive utilization efficiency of up to 75% [
2]. The high efficiency of the CCHP system provides significant reductions in energy costs and greenhouse gas emissions [
3,
4], and it has been widely promoted worldwide. However, despite its proven high comprehensive utilization efficiency, the development of the CCHP system is still not ideal in many countries, especially in China. Nearly half of the more than 40 CCHP system projects in China have been out of service due to economic problems [
5]. Various factors have been discussed which influence its economic performance, such as the design and operation strategies of the CCHP system, the energy prices, the initial cost, demand loads and incentive policies [
6].
Many studies have analyzed the economic performance of CCHP systems, considering the influence of different factors. The energy price is one of the key factors that influence the operation benefits, and it can determine the economic performance of the CCHP system [
7]. Eduardo et al. [
8] presented the influence of the operation strategy and the energy price on the benefits of trigeneration systems combined with thermal energy storage (TES). Wang et al. [
1] discussed the annual capital costs, maintenance costs and energy costs of CCHP systems with different configurations compared to conventional system, to determine the optimal system in terms of best economic performance. Tichi et al. [
9] analyzed the impact of current and future energy prices on the installed capacity of CCHP systems in Iran and emphasized that the policy of selling electricity to utility is a prerequisite for the successful promotion of the CCHP system. The increase of the energy prices can help improve the promotion of installing CCHP systems. Policy support is one of the most effective ways of contributing to the economic performance of the CCHP system. Nowadays, many countries have adopted policies for the promotion of CCHP systems, such as investment subsidies [
10], feed-in tariffs [
11], tax support [
12], etc. Rentao Dong et al. [
13] analyzed the impacts of different subsidies on investment in distributed natural gas projects and highlighted that the best subsidy means should be dynamic. They demonstrated that economics changed with the adjustment of energy prices and subsidies. The increase of gas prices, reduction of electricity prices and subsidies will decrease the economics of the CCHP. Zheng et al. [
11] evaluated the impact of the feed-in-tariff policy on the design capacity and performance of a hospital CCHP system.
The reason for promoting the CCHP system is energy conservation and emission reduction. Therefore, in addition to economic performance, energy and environmental effects are also important evaluation criteria in the comprehensive analysis of CCHP systems [
14,
15]. Some literature focuses on multi-criteria evaluation [
16,
17,
18]. Nami et al. [
19] assessed the sustainability and feasibility of a municipal waste-fired trigeneration plant from the thermodynamic, economic and environmental perspectives. Xiaolin Chu et al. [
20] used the economic benefits, environmental sustainability and energy advantages to evaluate the CCHP system under two different carbon emission regulation policies. Because the economic performance and environmental performance of a CCHP system are evaluation indicators from two different perspectives, and usually conflict with each other [
21], a few studies have used carbon credits [
22] or other carbon emission trading [
6] method to evaluate the environmental performance of the CCHP system.
From the literature review, there are two aspects that have received less attention. Researchers have analyzed several measures to improve the economic performance of the CCHP system. However, most of them have focused on the optimization of the configuration design and operation strategy of the CCHP system under certain conditions. The reasons that the development of the CCHP system has been limited and influencing factors of the promotion of the CCHP system have not been considered. Furthermore, most papers develop the economic evaluation and environmental evaluation of the CCHP system only by the weighted method, which lacks practical application significance.
To improve its economic advantage and promote the CCHP system, this paper proposes three different systems (conventional system without CCHP, CCHP with 50% penetration and CCHP with 100% penetration) based on a research case of an amusement park resort in Shanghai. The environmental performance of the CCHP system plays an important role in the promotion of the CCHP system. Therefore, both the economic and environmental performance of the three systems were compared. According to the carbon tax scheme levied in China since 2019 [
23], this study used the carbon tax to transfer the reduction benefits of the CCHP system in carbon dioxide emissions into an economic benefit, in order to comprehensively analyze the performance of the CCHP system. Finally, we compared the impacts of different factors, including investment costs, energy prices and the carbon tax, on the promotion of the CCHP system.
Consequently, the contributions of this paper can be summarized as follows.
An operation simulation of CCHP systems with different penetrations based on a transient simulation model was carried out. The dynamic payback period and carbon dioxide emissions were used to evaluate the economic and environmental performance of the CCHP system.
The impacts of four factors—investment cost, energy prices, subsidies and the carbon tax—on the payback period of the CCHP system were analyzed to obtain the effects on promotion of the development of the CCHP system.
Through sensitivity analysis, the impact significance of different factors on the economy of the CCHP system was compared, and the correlation with the promotion effect of the CCHP system was analyzed.
The research flow of this study is shown in
Figure 1.
The purpose of this study was to analyze the impacts of the investment cost, energy prices, subsidies and carbon tax on the economic performance of the CCHP system, which could significantly improve its promotion. Therefore, the hypotheses were: (1) There is no transmission consumption; the cold, heat and electricity obtained by the simulation can be 100% used. (2) Ignore the thermal inertia in the process of cold and heat supply and consider that the start and stop of the equipment is consistent with the change in demand load. (3) The parasitic electric energy consumption of the CCHP system (considering the auxiliary equipment required for energy supply and the daily power needs of the system) is estimated to be 10% of the electricity generation of the CCHP system [
24].
This paper is organized as follows.
Section 2 presents the mathematical analysis of the energy flow of the CCHP system and proposes evaluation criteria for CCHP systems.
Section 3 introduces the research case and establishes the simulation model.
Section 4 compares the economic and environmental performance of different systems and analyzes the impact of different factors. The conclusion is given in
Section 5.
2. Method
To analyze the economic performance of the CCHP system, assessment of the energy flow of the CCHP system was carried out to calculate the energy consumption and generation. After that, the economic and environmental performance of the CCHP system could be obtained.
According to the literature [
25,
26,
27], the payback period is one of the main indicators to evaluate the economics of a project. The carbon dioxide emissions are usually used to represent the environmental performance of the system [
28,
29,
30]. To compare the comprehensive performance of different systems, this paper uses the payback period and carbon emissions in a multi-criteria evaluation. Through the carbon tax, the environmental indicator of carbon emissions is integrated into the economic performance of the system. Therefore, the impacts of the changes in different factors on the promotion of the CCHP system can be analyzed by comparison of the payback period.
2.1. Energy Flow of the CCHP System
In the CCHP system, the power generation unit (PGU) is driven by natural gas and produces electricity. The high-temperature exhaust gas of the PGU is recovered to accommodate the thermal load for cooling and heating for the demand side. In applications, due to large fluctuations in the load on the demand side, electric chillers and gas boilers are usually used in combination with waste recovery equipment, to satisfy the cooling or heating demand load.
The CCHP system consists of PGUs, absorption units, electric chillers and boilers, and its energy flow is shown in
Figure 2.
The balances of energy in the CCHP system at t-hour are expressed as [
30]:
where
is the electricity from the grid at t-hour in the CCHP system (when the PGU generates excess electricity,
is negative, its value is equal to the excess electricity in kWh and the electricity is sold back to the grid).
is the electricity generated by the PGU in kWh.
is the parasitic electric energy consumption of the CCHP system (considering the auxiliary equipment required for the energy supply and the daily power needs of the system) in kWh.
is the electric energy consumption for electric chillers providing cooling to the demand side in kWh.
is the electric energy load of the demand side in kWh.
The fuel energy consumption (
) and the waste heat (
) generation of the PGU at t-time can be calculated as Equations (2) and (3), respectively.
where
is the electricity generated by the PGU at t-time in kWh.
is the electric efficiency percentage of the
at t-time.
is the heat recovery system efficiency percentage.
is the part load ratio percentage of the PGU. Equations (4) and (5) are quadratic fitting formulas which can be estimated by the parameters of the actual devices [
21].
The waste heat generated by the PGU can be used for cooling or heating. Therefore, the cooling load or heating load produced by the absorption units are estimated, respectively, as
where
is the waste heat generated by the PGU in kWh.
and
are the cooling load and heating load produced by the absorption units, respectively, in kWh.
is the coefficient of performance (COP) of the absorption units for cooling.
is the coefficient of performance (COP) of the absorption units for heating.
is the part load ratio percentage of the absorption unit. Equation (8) includes the quadratic fitting formulas, which can be estimated by the parameters of the actual devices [
21].
The balance of the cooling load is expressed as:
where
is the cooling produced by the absorption units in kWh.
is the cooling produced by the electric chillers in kWh.
is the cooling load of the demand side in kWh.
is the heating produced by the absorption units in kWh.
is the heating produced by the boilers in kWh.
is the heating load of the demand side in kWh.
The electricity used by the electric chiller is calculated as:
where
is the electric chiller’s COP.
The supplementary fuel energy consumption to the boiler,
, can be estimated as:
where
is the boiler efficiency percentage.
2.2. Evaluation Criteria
2.2.1. Economic Analysis
(1) Annual total profit (ATP)
The annual total profit (ATP), which is the energy income minus the annual energy cost and operation and maintenance cost, is calculated as follows:
where
,
,
and
are the energy price of cooling, heating, electricity and natural gas at t-hour, respectively, in
$/kWh.
(2) Investment cost
The investment cost is spent at the beginning when purchasing the equipment in the construction of the system, calculated as follows:
where
,
,
and
are the equipment unit cost of the PGU, absorption unit, electric chiller and boiler, respectively, in
$/kW.
,
and
are the nominal capacity of the PGU, electric chiller and boiler, respectively, in kW. N, M and I are the number of PGUs, electric chillers and boilers. The absorption unit should be matched with the PGU, so the number is the same as for the PGU.
(3) Dynamic payback period (PB)
The payback period, an index of economic performance, is the time required for the project to recover the initial investment cost. By calculating payback period, the economic performance of the projects can be compared. A short payback period means that the economic benefits of the system are high. The dynamic payback period is calculated when the cumulative net present value (NPV) is zero, as shown by Equation (16).
The payback period cannot be longer than the lifetime of the system, which is 25 years in this paper.
The net present value (NPV) is the difference between the present value of cash inflows and the present value of cash outflows during a period, which mainly represents the balance between the present value of total profit and the initial investment. It can be expressed as [
26]:
where
is the annual total profit in dollars.
is the discount rate percentage.
is the total investment cost in dollars.
2.2.2. CO2 Emission Analysis
The amount of carbon dioxide emissions (CDEs) from the CCHP system can be determined using the emission conversion factors as follows [
29,
30]:
where
and
are the emission conversion factors for electricity from the grid and natural gas, respectively, in g/kWh.
A carbon tax is one of the effective means to reduce carbon emissions. At present, at least 20 countries in the world have imposed carbon taxes [
31]. The carbon tax can be calculated into the total annual profit, as follows:
where
is the total annual profit considering the carbon tax.
is the difference in carbon dioxide emissions before and after utilization of the energy supply system.
is the carbon tax.
3. Case Study
A typical CCHP system in an amusement park resort in Shanghai, China, was taken as a research case, and its economic performance was analyzed. As the first CCHP system under stable operation in China, its equipment selection, system design and operation strategy are highly representative and universal. At the same time, it provides electricity, cooling and heating for the demand side with different load characteristics. Based on this research case, the study of the impacts of different factors on the promotion of CCHP system in China is valuable.
Generally, centralized energy supply systems with electric chillers and gas boilers are commonly used in amusement parks to provide cooling and heating [
32]. Nowadays, a few major theme park companies are embracing a more energy-saving and environmentally friendly way to solve energy problems. The CCHP system is an alternative to conventional systems. The research case of this paper is a hybrid CCHP system with penetration of 50% (the cooling and heating load provided by waste heat from PGUs account for 50% of the total demand). To study the promotion of CCHP systems, this paper proposes three CCHP systems with different penetration rates, using the current system for comparison:
System 1 (conventional system): without CCHP (only adopting electric chillers and boilers to supply cooling and heating load, the electricity is from the utility grid);
System 2 (current system): CCHP with 50% penetration (adopting PGUs, absorption units, electric chillers and boilers to cooperate to supply electricity, cooling and heating); and
System 3 (target system): CCHP with 100% penetration (only adopting PGUs and absorption units to supply energy).
By comparing the above three CCHP systems with different penetration, the economics and environmental performance of the CCHP system were analyzed, and the impacts of different factors could be discussed.
3.1. The Information on the Research Case
3.1.1. System Configuration
Due to the large electricity load of the resort, the CCHP system is operated following thermal demand, and the excess electricity can be sold back to the grid. The system makes full use of waste heat from PGU to provide cooling and heating load for the resort.
In the CCHP system, the PGU adopts a gas internal combustion engine (ICE). The waste recovery equipment adopts a flue gas hot water-type lithium bromide absorption heat transformer unit (absorption unit), which can produce cooling or heating. Electric chillers and gas-fired boilers are employed to operate with the absorption unit to meet the cooling and heating needs of the tourism resort. The penetration of this CCHP system is 50%. The configuration of the CCHP system with 50% penetration is shown in
Table 1. After investigating and consulting the equipment manufacturers, the characteristic parameters of these equipment of this CCHP system are listed in
Table 2.
To compare the economic and environmental performance of the three different systems, we adopted the same equipment for the conventional system (without CCHP) and CCHP system with 100% penetration. The energy generated by these three systems can meet the same cooling and heating load. Other characteristic parameters of the equipment are the same as in the CCHP system with 50% penetration. The configurations of the three systems are listed in
Table 3.
3.1.2. Load Curve
The total area of the amusement park resort in Shanghai is 116 km
2. There are two themed hotels, many amusement facilities and many restaurants and shopping stores in the resort. The total construction area of these two themed hotels is 161,000 m
2. Through the pipe network system and cables, the CCHP system provides cold, heat and electricity to the resort. Because the CCHP system is operated following the thermal demand and the excess electricity can be sold back to the grid, the cooling and heating load should be satisfied preferentially. The hourly cooling and heating load demand from January 2016 to December 2016 of the resort is shown in
Figure 3, and the following characteristics can be derived:
Both cooling load and heating load are required throughout the year.
The cooling load peak is greater than the heating load peak because of the hot climate of Shanghai.
The cooling load is high and the heating load is low in summer. The heating load is high and the cooling load is low in winter.
Mid-season, the energy demands for cooling and heating are similar.
3.2. Simulation Model
3.2.1. Establishment of Simulation Model
We used TRNSYS [
33,
34] to establish the operation simulation model of the CCHP systems. Through adjusting and connecting the system components, including ICEs, absorption units, electrical chillers, gas boilers and other auxiliary equipment, the operation model of the CCHP system was established to simulate instantaneous energy consumption and generation, as shown in
Figure 4. N is the number of ICEs/absorption units, M is the number of electric chillers and I is the number of boilers in the diagram, which are listed in
Table 4.
3.2.2. Setting of Partial Load Performance and Validation of the Simulation Model
The number of units started is determined based on the load change at the previous moment. Therefore, the start and stop sequence of each piece equipment was simulated in MATLAB. The part load ratio
ε of units is:
Each module was set according to the actual performance of the equipment. The partial load performance of the ICE, absorption unit and electric chiller were set by an external file according to the specifications provided by the manufacturer, as shown in
Table 5 and
Figure 5. The weather conditions of Shanghai are obtained through the typical meteorological year (TMY2) module, which can make the simulated environment consistent with the actual operating environment.
For accuracy of the simulation, the performance of the model was compared with the actual operation data at full load of System 2, as shown in
Table 6.
In
Table 6, we can see that the relative errors are within 3% after comparing the simulation results with actual data. This demonstrates that the results simulated by the model are in good agreement with the actual operational data.
5. Conclusions
This study evaluated the economic and environmental performance of the CCHP system based on its dynamic payback period and carbon dioxide emissions and analyzed the impacts of different factors on the promotion of the CCHP system.
Taking a typical CCHP system of an amusement park resort in Shanghai, China, as a research case, the simulation of three CCHP systems with different penetrations was carried out. Based on the comparison of the different penetration, four factors (investment cost, energy prices, subsidies and a carbon tax) affecting the economic performance of the CCHP system were discussed and compared through a sensitivity analysis.
Some conclusions from the results and analyses above include:
As the penetration of the CCHP system increases, carbon dioxide emissions reduce, but the economic performance worsens because of the large investment cost.
The impacts of prices: The economic performance of the CCHP system with 50% penetration can be better than that of the conventional system if the investment cost is reduced by 48% or the electricity price is increased by 11.5%. To promote the CCHP system with 100% penetration, investment costs must be reduced by 76% or electricity prices increased by 30%.
The impacts of policies: The current investment cost and energy prices cannot be changed significantly in the short term. Therefore, incentive policies are an effective way to contribute to the economics of the CCHP system. The current subsidy can basically achieve promotion of the CCHP system with 50% penetration. With an increase of the penetration to 100%, the subsidy should increase by 1.71 times. Furthermore, introduction of a carbon tax can highlight the superiority of the low-emission characteristics of the CCHP system. The CCHP systems with 50% and 100% penetration will achieve economic competitiveness when the carbon tax reaches 12.5 and 25.5 $/ton, respectively.
According to the sensitivity analysis, electricity and gas prices have the greatest impacts on the economics of the CCHP system. However, changes in gas price cannot effectively reduce the economic gap between the CCHP system and conventional system. Although the impact of a carbon tax on the economics of the CCHP system is not the large, the environmental costs of the conventional system increase greatly with the development of carbon tax. Even if price concessions and subsidies were eliminated, the market competitiveness of the CCHP system would gradually increase. Therefore, it is necessary and significant to focus on the carbon tax for promoting the development of the CCHP system.
This paper takes the CCHP system in an amusement park resort in Shanghai as an example to analyze the influence of different factors on the promotion of the CCHP system. The results can provide guidance for improving the economics of the CCHP system. In the future, with the increase of the carbon tax, the CCHP system will become a better choice for investors.
There are fewer studies on the energy supply systems of amusement parks which have high energy consumption. This paper can provide a reference for amusement parks to establish a CCHP system to improve energy efficiency and reduce costs. However, the demand load and subsidies in different regions will be different. Therefore, the results will be different according to the specific research case. Nevertheless, the research method used in this paper has strong adaptability and practical application significance.