1. Introduction
As one of the most promising renewable power sources, wind power has been under a rapid growth in last decades. By the end of 2019, the total capacity for wind energy globally has reached 651 GW, in which China has the world’s largest installed wind power capacity of 236 GW. Due to the natural intermittent property, wind power can not be dispatched on demand. When the available wind power excess the operation capability of the integrated power grid, wind curtailment has to be performed to keep power balance in the system, which leads to an critical issue of massive wind generation curtailment during the winter off-peak period in Northern China [
1]. To ensure the utilization of wind power, the Government of China has also issued a set of policies to guide market design and technology development [
2]. Microgrid with renewable wind power has become a popular power supply solution for islands in China [
3]. As a small-scale power grid, island microgrid has a very limited operational flexibility to handle the variable wind generation, which make it more challenging to relieve wind generation curtailment.
Many research works have been conducted to relieve wind generation curtailment, such as high voltage direct current (HVDC) transmission [
4], energy storage applications [
5], integrated energy systems [
6], and probabilistic planning and operation [
7]. The thermostatically controlled loads in a microgrid are utilized in Reference [
8] to mitigate the variations in renewable generation and load with a distributed control scheme. But the performance of the solutions using demand response depends on the availability and capacity of the controllable loads. Diesel generators and battery energy storage systems (BESS) are two common options that being configured in microgrids as additional power sources and flexible resources to address the wind power integration issues. A multi-objective robust optimization model based on the information gap theory is proposed in Reference [
9] to realize the island microgrid capacity configuration of diesel generators and BESS. In Reference [
10], a lithium-ion BESS is designed to improve the dispatchability of uncertain renewable generation considering the degradation of battery. However, The BESS applications are restricted by the high investing cost and limited life cycles of batteries.
Integrating the electrical network and the thermal network has been proposed as another possible solution to facilitate the regulation capability of thermal network for supporting wind power utilization [
11]. The combined heat and power (CHP) unit can provide electrical and heat power simultaneously and is popular in the heat-electricity integrated microgrids to facilitate energy sharing and improve system flexibility. A hybrid energy sharing framework is established for multiple microgrids in Reference [
12]. However, the combined heat and power (CHP) unit has a limited operational flexibility constrained by the heat demand in winter [
13]. A heavy curtailment of wind generation will be performed because a large portion of the power demand must be covered by CHP units [
5].
Therefore, additional flexibility resources need to be introduced in heating supply to allow CHP units to further reduce their power output for relieving wind generation curtailment. Installing electrical boilers (EB) is one of the potential solutions that can utilize wind generation to meet the heat load demand [
1]. Electrical energy storage has also been widely applied to increase the flexibility in island microgrid operation [
14]. A stochastic programming framework is presented in Reference [
15] for conducting optimal daily scheduling of CHP-based microgrids consisting of wind power electrical boiler, and energy storage devices. As electrical energy storage can only be dispatched to regulate electrical power network and EB can only provide one-direction flexibility, thermal energy storage (TES) is introduced as another effective solution to improve the utilization of wind generation by shifting the heating demand to off-peak hours [
16,
17].
A microgrid optimal dispatch with TES and demand response is proposed in Reference [
18] to address the uncertainty in renewable energy. In Reference [
19], an energy management system model integrating CHP units, boilers, heat pumps, and TES is built for isolated microgrid to saving daily fuel cost in winter days. An online energy management algorithm is developed in Reference [
20] to minimize the microgrid’s operation cost by coordinating renewable generations, CHP units, electricity and heat energy storage. However, most of studies focus on the short-term operational optimization with configured system capacities. The configuration and economic analysis of TES, combined or compared with other solutions, have not been studied in detail yet.
This work looks at a particular scenario of relieving wind generation curtailment in an island microgrid with a weak tie-line connection to external bulk grid, which has been observed in a practical island microgrid grid located in Northeast China. Considering local residential heat load in winter season, when the wind generation curtailment is a significant issue, TES is employed as an effective approach to convert and store the wind energy to satisfy heating demand. In order to achieve this goal, an extensive formulation is proposed to determine the optimal size of TES for such scenario, based on a set of detailed models of TES and CHP units. The effectiveness of the proposed approach is validated using real-world data obtained from the practical island microgrid.
The contributions of this paper include the following:
- (1)
The detailed technical and economic models of TES and CHP units are established to accurately describe their capabilities and costs.
- (2)
The thermal network is modeled along with the electrical network to utilize its regulation capability with TES being introduced as an additional flexibility resource.
- (3)
An optimal configuration model is proposed to determine the TES capacity for relieving wind generation curtailment while minimizing the overall operating cost.
4. Case Study
To validate the effectiveness of the proposed model, a sea island county in China is studied. The island county is located in the northern Yellow Sea on the east side of Liaodong Peninsula and it consists of 195 islands, covering an area of 142 square kilometers on land and 10,324 square kilometers on sea. The sea area has sufficient wind resources and a microgrid system is built to integrate wind generation.
The microgrid consists of
MW CHP units, 200 MW wind power, and a tie line of 60 MW connecting to the main grid. The prices are set as
$0.06/kWh for wind generation,
$0.5/kWh for the energy transfered through tie line, and
$603/ton for the coal.
Table 1 and
Table 2 illustrate the cost coefficients and technical parameters for the CHP units.
Figure 4,
Figure 5 and
Figure 6 show a typical daily electrical load profile, a typical daily heat load profile, and the typical available wind power for a month.
4.1. System Configuration Results
Three cases are tested to analyze the performance of TES and EB in relieving wind curtailment, including (1) without TES and EB, (2) with EB, (3) with TES. The cost of EB is set as
$ per MW. The efficiencies of TES and EB are set the same as 0.98.
Table 3 illustrates the optimal configuration results for the three cases.
As shown in
Table 3, the utilization rate of wind power is only 81.12% without any electrical-heat conversion devices. The wind curtailment not only limits the profit of wind turbines (i.e., wind generation cost) to
$ but also leads to a wind curtailment penalty of
$, which seriously affects the economic performance of wind generation. Taking minimizing the total operating cost as the objective function, the optimal rated power capacity of EB is obtained at 33.53 MW with an annualized cost of
$. The optimal configuration of TES is obtained as 45.84 MW/328.95 MWh and the annualized cost is
$.
After installing EB, the utilization rate of wind power increases significantly and reaches 94.20%. As a result, the profit of wind turbine increases to $, and the wind curtailment penalty also deceases to $. Although there is an additional annualized cost for EB as $, the overall annual revenue of the microgrid increases by $.
Compared with EB, the installation of TES facilities the bi-direction and time-shifting flexibility support from TES to utilize wind generation. The utilization rate of wind generation further increases to 96.85%. As a result, the wind generation profit increases $ compared to the case of installing EB and $ compared to the case without EB and TES. The wind curtailment penalty also decreases $ and $ compared to the other two cases. Although the TES solution requires a higher annualized cost at $, the overall annual revenue of the microgrid increases $ and $ compared to other two cases. It should be noted that the tie line energy profit increases by $ when comparing the TES solutions with the EB solution due to the extra bi-direction and time-shifting flexibility.
In summary, comparing the tested three cases, the TES solution realizes a lowest minimum total cost (i.e., highest total revenue), which validates that TES can not only improve the utilization of renewable wind power in the microgrid but also realize a better economic performance.
To further analyze the operational details with the installation of EB and TES,
Figure 7 presents the typical two-day power profiles of the available wind power and the utilized wind power with EB.
Figure 8 shows the wind power profiles for the same two days after installing TES, and
Figure 9 shows the energy states of TES.
As it can be seen from
Figure 7 and
Figure 8, installing TES can further mitigate the fluctuations of the integrated wind generation compared to installing EB. A part of wind power is stored in TES in heat during the peak period, which realizes peak shaving. The average fluctuation level of wind power can be evaluated by
as
The value of is 6.47 for the original available wind power and it is reduced to 4.65 with the installation of EB. With the configured TES, is reduced to 3.77, which validates that installing TES can increase the utilized wind energy and also smooth the integrated wind power at the same time.
As shown in
Figure 9, during hours 1 to 5, TES is in the charging mode due to the surplus wind power and the energy state of TES is also increased. From hour 5 to hour 24, the heating power is decreased due to the reduction of available wind power and the energy state of TES is also declined. The wind power varies during hours 24–44; therefore, the heating power and the energy states of TES are also under fluctuations. After hour 44, the available wind power increases and so as the energy state of TES. In other word, the energy state of TES can reflect the variation of wind power. TES can mitigate the fluctuations of wind power by frequently changing the heating power and storing/releasing thermal energy to support the power balance of electrical network and increase the utilization rate of wind power.
4.2. Performance of TES in Wind Power Utilization under Different Scenarios
The variations of wind power changes along with the months.
Figure 10 shows the performance of TES in utilizing wind power with different variation level in different months. The variation level of wind power is represented by the standard deviation of the available wind power. It can be found that the consumption rate of wind power is affected by the variation level. A higher variation level would lead to a lower wind power consumption rate.
The sizing of various components in the microgrid will highly affect the system operational cost and the optimal capacity of TES. The microgrid scale mainly depends on the demand (i.e., electrical load and heat load) and the installed renewable generation. Therefore, a study is performed to discuss the impact of different wind power capacities, different electrical load levels, and different heat load levels on the optimal capacity of TES to achieve the minimum operational cost, as shown in
Figure 11,
Figure 12 and
Figure 13.
Figure 11 shows the optimal TES configurations and wind consumption rates with different wind power capacities. It shows that a higher capacity of TES is needed for the increased wind power capacity due the increased available wind generation. Moreover, as the electrical load and heat load remain the same in the microgrid, the wind consumption rate will consequently decrease. Therefore, without demand growth in the microgrid, continually installing more wind turbines would lead to an increasing requirement of TES capacity and an declining utilization rate of wind power.
Figure 12 shows the optimal TES capacities and corresponding wind power consumption rates with different electrical load growth rates. The increasing electrical load can consume more wind generation, which leads to a increase in wind power consumption rate. The role of TES in utilizing wind power and supply heat load is reduced accordingly, so the optimal TES capacity is decreased.
Figure 13 shows the optimal TES capacities and corresponding wind power consumption rates with different heat load growth rates. With the increasing heat load, the thermal network can provide more support to wind power utilization. Therefore, a higher optimal TES capacity is obtained accordingly, resulting a stronger capability of utilizing redundant wind energy for heat supply. A wind power consumption rate of 98.59% is realized with 40% growth of heat load.
5. Discussion
Integrating electrical and thermal network can facilitate the regulation capability of thermal network to address the uncertainty in wind generation. CHP units are important components to connect and coordinate the electrical and thermal power. Considering the operating limits of CHP units, introducing additional flexible electricity-heat conversion devices can significantly increase the operational flexibility of the microgrid. As demonstrated in the Case Study, installing EB as an additional resource can not only bring extra profits of wind turbines and reduce the wind curtailment penalty by increasing wind power utilization rate, but also improve the economic performance of the whole microgrid. Moreover, the optimally configured TES can further improve the wind power utilization and increase the economic profits due to its bi-direction and time-shifting flexibility. The additional cost of installing TES can be totally covered by the increased revenue.
Besides, the analyses of TES configurations under different wind power capacities, different electrical load levels, and different heat load levels show that a higher TES capacity is needed for larger wind generation capacity, while the increments in electrical load and heat load can consume more wind generation and provide more flexibility, which leads to less required TES capacity.