Article

Using Thermal Energy Storage to Relieve Wind Generation Curtailment in an Island Microgrid

1
School of Electrical Engineering, Shenyang University of Technology, Shenyang 110027, China
2
State Grid Liaoning Electrical Power Company, Shenyang 110006, China
3
College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China
4
Department of Electrical and Computer Engineering, University of Saskatchewan, Saskatoon, SK S7N 5A9, Canada
*
Author to whom correspondence should be addressed.
Energies 2021, 14(10), 2851; https://doi.org/10.3390/en14102851
Submission received: 29 March 2021 / Revised: 11 May 2021 / Accepted: 12 May 2021 / Published: 15 May 2021
(This article belongs to the Section D: Energy Storage and Application)

Abstract

:
The uncertainty and intermittency of the available wind resource in nature would potentially cause wind generation curtailment when the flexibility of the integrated power grid is limited, especially in small-scale microgrids for islands. In this paper, an optimal configuration method is proposed to use thermal energy storage (TES) to relieve wind generation curtailment in an island microgrid. The thermal network is modeled along with the electrical network to utilize its regulation capability, while TES is introduced as an additional flexibility resource. The detailed cost models of combined heat and power (CHP) units and TES are presented to realize the objective of minimizing the overall operating cost. The performance of TES in improving wind power utilization is firstly validated by using an electrical boiler (EB) as a benchmark and further analyzed under different scenarios considering the growths of wind power capacity, electrical load, and heat load. The effectiveness of the proposed method is validated using real-world data obtained from the practical island microgrid.

1. Introduction

As one of the most promising renewable power sources, wind power has been under a rapid growth in last decades. By the end of 2019, the total capacity for wind energy globally has reached 651 GW, in which China has the world’s largest installed wind power capacity of 236 GW. Due to the natural intermittent property, wind power can not be dispatched on demand. When the available wind power excess the operation capability of the integrated power grid, wind curtailment has to be performed to keep power balance in the system, which leads to an critical issue of massive wind generation curtailment during the winter off-peak period in Northern China [1]. To ensure the utilization of wind power, the Government of China has also issued a set of policies to guide market design and technology development [2]. Microgrid with renewable wind power has become a popular power supply solution for islands in China [3]. As a small-scale power grid, island microgrid has a very limited operational flexibility to handle the variable wind generation, which make it more challenging to relieve wind generation curtailment.
Many research works have been conducted to relieve wind generation curtailment, such as high voltage direct current (HVDC) transmission [4], energy storage applications [5], integrated energy systems [6], and probabilistic planning and operation [7]. The thermostatically controlled loads in a microgrid are utilized in Reference [8] to mitigate the variations in renewable generation and load with a distributed control scheme. But the performance of the solutions using demand response depends on the availability and capacity of the controllable loads. Diesel generators and battery energy storage systems (BESS) are two common options that being configured in microgrids as additional power sources and flexible resources to address the wind power integration issues. A multi-objective robust optimization model based on the information gap theory is proposed in Reference [9] to realize the island microgrid capacity configuration of diesel generators and BESS. In Reference [10], a lithium-ion BESS is designed to improve the dispatchability of uncertain renewable generation considering the degradation of battery. However, The BESS applications are restricted by the high investing cost and limited life cycles of batteries.
Integrating the electrical network and the thermal network has been proposed as another possible solution to facilitate the regulation capability of thermal network for supporting wind power utilization [11]. The combined heat and power (CHP) unit can provide electrical and heat power simultaneously and is popular in the heat-electricity integrated microgrids to facilitate energy sharing and improve system flexibility. A hybrid energy sharing framework is established for multiple microgrids in Reference [12]. However, the combined heat and power (CHP) unit has a limited operational flexibility constrained by the heat demand in winter [13]. A heavy curtailment of wind generation will be performed because a large portion of the power demand must be covered by CHP units [5].
Therefore, additional flexibility resources need to be introduced in heating supply to allow CHP units to further reduce their power output for relieving wind generation curtailment. Installing electrical boilers (EB) is one of the potential solutions that can utilize wind generation to meet the heat load demand [1]. Electrical energy storage has also been widely applied to increase the flexibility in island microgrid operation [14]. A stochastic programming framework is presented in Reference [15] for conducting optimal daily scheduling of CHP-based microgrids consisting of wind power electrical boiler, and energy storage devices. As electrical energy storage can only be dispatched to regulate electrical power network and EB can only provide one-direction flexibility, thermal energy storage (TES) is introduced as another effective solution to improve the utilization of wind generation by shifting the heating demand to off-peak hours [16,17].
A microgrid optimal dispatch with TES and demand response is proposed in Reference [18] to address the uncertainty in renewable energy. In Reference [19], an energy management system model integrating CHP units, boilers, heat pumps, and TES is built for isolated microgrid to saving daily fuel cost in winter days. An online energy management algorithm is developed in Reference [20] to minimize the microgrid’s operation cost by coordinating renewable generations, CHP units, electricity and heat energy storage. However, most of studies focus on the short-term operational optimization with configured system capacities. The configuration and economic analysis of TES, combined or compared with other solutions, have not been studied in detail yet.
This work looks at a particular scenario of relieving wind generation curtailment in an island microgrid with a weak tie-line connection to external bulk grid, which has been observed in a practical island microgrid grid located in Northeast China. Considering local residential heat load in winter season, when the wind generation curtailment is a significant issue, TES is employed as an effective approach to convert and store the wind energy to satisfy heating demand. In order to achieve this goal, an extensive formulation is proposed to determine the optimal size of TES for such scenario, based on a set of detailed models of TES and CHP units. The effectiveness of the proposed approach is validated using real-world data obtained from the practical island microgrid.
The contributions of this paper include the following:
(1)
The detailed technical and economic models of TES and CHP units are established to accurately describe their capabilities and costs.
(2)
The thermal network is modeled along with the electrical network to utilize its regulation capability with TES being introduced as an additional flexibility resource.
(3)
An optimal configuration model is proposed to determine the TES capacity for relieving wind generation curtailment while minimizing the overall operating cost.

2. Modeling of CHP Unit and TES

Figure 1 shows the structure of a microgrid consists of electrical power network and thermal energy network. The heat load is supplied by CHP units and electrical-heat conversion devices, e.g., TES or EB. The electrical load is supplied by the CHP units, wind turbines, and a tie line. The redundant wind power is used to “charge” TES within the limitation of its rated heating power.

2.1. CHP Modeling

Figure 2 illustrates the typical heat and electrical power characteristic of a CHP unit with an extraction steam turbine. Denote P g as the active electrical power output and Q g as the heat power output. P g max and P g min are the maximum and minimum electrical power output, while Q g min is the heat power output when P g = P g min , and Q g max is the maximum heat power output. The coefficient of electrical power and heat power under back pressure operation can be described as c m , g = Δ P g / Δ Q g , which can be normally considered as a constant. Δ P g is the power difference of P g between point B and C in Figure 2, and Δ Q g is the power difference of Q g between point B and C. In other word, c m is the slope of the line segment BC.
Denote C v , g as the reduced electrical power amount to increase per unit heat power under the same steam flow. The value of C v , g can be further defined as C v 1 , g under the maximum electrical power output and C v 2 , g under the minimum electrical power output.
As the CHP unit can generate both electricity and heat at the same time, the operating cost of a CHP unit g at time t, denoted as C g t , can be calculated with P g t and Q g t as
C g t = b 0 + b 1 P g t + b 2 Q g t + b 3 ( P g t ) 2 + b 4 P g t Q g t + b 5 ( Q g t ) 2 · S coal ,
where b 0 , b 1 , b 2 , b 3 , b 4 , b 5 are the cost coefficients, and S coal is the unit fuel price.

2.2. TES Modeling

TES using phase change materials is adapted in this paper, as shown in Figure 3. The heating function of TES is realized with thermal resistance connected to a 10 kV power supply. The capital cost of TES C n can be described with a quadratic function of the heat energy capacity E ¯ TES and the rated intput heat power P ¯ TES of TES.
C n E ¯ TES , P ¯ TES = d 0 + d 1 E ¯ TES + d 2 E ¯ TES + d 3 P ¯ TES + d 4 P ¯ TES .
The operating cost of TES can be modeled with the annual depreciation cost C a and the annual maintenance cost C b . The former one can be obtained by projecting the capital cost can be projected into each year using the straight-line depreciation method. The latter one can be estimated as a proportion of the capital cost.
C a E ¯ TES , P ¯ TES = C n E ¯ TES , P ¯ TES γ ( 1 + γ ) k ( 1 + γ ) k 1 C s γ ( 1 + γ ) k 1 ,
C b E ¯ TES , P ¯ TES = R m · C n E ¯ TES , P ¯ TES ,
where γ is the annual percentage rate, C s is the salvage value of TES, k is the service life in year, and R m is the coefficient to estimate the maintenance cost from the capital cost.
Therefore, the overall annual operating cost of TES C TES can be calculated from the annual depreciation cost and maintenance cost as
C TES E ¯ TES , P ¯ TES = C a E ¯ TES , P ¯ TES + C b E ¯ TES , P ¯ TES .

3. Configuration Method

A multi-period operational planning problem is formulated to determine the optimal size of TES to minimize the overall investing and operating costs, while utilizing the renewable wind resources as possible.

3.1. Objective Function

The objective function aims to minimize the overall cost, including the operating cost of CHP units, operating cost of wind generation, penalty of wind curtailment, cost of energy purchased through the tie line, and the annualized operating cost of TES.
min t = 1 T g = 1 N G C g t P g t , Q g t + c w P w t + c curt P w , curt t + c tie P tie t + C TES E ¯ TES , P ¯ TES ,
where T is the length of optimization horizon, N G is the number of CHP units, C g t is the cost function of CHP unit g at time t, P g t and Q g t are the electrical power output and heat power output of CHP unit g at time t, c w is the cost coefficient of wind generation in $ / MW , c tie is the unit price of energy delivered through tie line, and P tie t is the exchange power of tie line at time t, P w t is the total wind generation at time t, c curt is the penalty coefficient of wind curtailment in $ / MW , and P w , curt is the wind curtailment at time t, which can be calculated with the total available wind power P w , avail t .
P w , curt t = P w , avail t P w t .

3.2. Operation Constraints

3.2.1. CHP Units Operation Constraints

The active electrical power output of CHP unit is restricted by both the capacity and the heat power output as
P g t min c m , g Q g t + K g , P g min c v 2 , g Q g t ,
P g t P g max c v 2 , g Q g t ,
where P g min and P g max are the minimum and maximum electrical power outputs of CHP unit g with zero heat power output, c m , g , c v 1 , g , and c v 2 , g are the values of coefficients for unit g, and K g is a constant to describe the virtual intersection point of the segment BC and the axis of P g in Figure 2.
Besides, P g t is also restricted by the ramp rate of CHP unit as
P g t P g t 1 R g up ,
P g t 1 P g t R g dn ,
where R g up and R g up are the upward and downward ramp rate limit of CHP unit g.
The heat power output of CHP unit is restricted by its heat capacity as
Q g min Q g t Q g max ,
where Q g min and Q g max are the minimum and maximum heat power outputs of CHP unit g.

3.2.2. TES Operation Constraints

The input power and output power of TES are limited by its rated power capacity as
0 P TES t P ¯ TES ,
0 Q TES t Q ¯ TES ,
Q ¯ TES = 0.8 · P ¯ TES ,
where P TES t and Q TES t are the input and output heat power of TES at time t, and P ¯ TES and Q ¯ TES are the maximum input and output heat power of TES.
Considering the loss in electrical-heat conversion of TES, the electrical power required is higher than the heating power of TES.
P TES t = η TES · P heat t ,
where P heat t is the consumed electrical power for heating TES at time t, and η TES is the efficiency of electrical-heat conversion. η TES is set as 0.98 in this paper.
In addition, the energy state of TES is limited by its rated energy capacity as
0.1 E ¯ TES E TES t E ¯ TES ,
where E TES t is the energy state of TES at time t. It can be obtained by
E TES t = E TES t 1 + ( P TES t Q TES t ) Δ T ,
where Δ T is the time interval.

3.2.3. EB Operation Constraints

An EB is also considered to be configured in the microgrid for heat supply using electricity, the operation of which is modelled with its rated power and efficiency as
0 P EB t P ¯ EB ,
Q EB t = η EB P EB t ,
where P EB t is the electrical power consumption at time t, P ¯ EB is the rated power of EB, Q EB t is the heat power output of EB at time t, and η EB is the conversion efficiency of EB. η EB is set as 0.98 in this paper.

3.2.4. Electrical Power Balance Constraints

The electrical load in the island consists of normal power load P eload t and the EB power P EB t , which is supplied by the integrated wind generation P w t , CHP units generation P g t , and power from tie line P tie t .
( 1 + μ eloss ) P eload t + P EB t = g = 1 N G P g t + P w t + P tie t ,
0 P w t + P wheat t P w , avail t ,
P tie max P tie t P tie max ,
where μ eloss is the electrical power loss coefficient and is set as 0.05 in this paper. P tie t > 0 means power transfer from the maim grid to the island microgrid, and P tie t < 0 means the island microgrid transfers redundant power to the main grid. P tie max represents the transfer capacity of the tie line. P w , avail t is the available wind generation at time t.

3.2.5. Heat Power Balance Constraint

To satisfy the heat demand, a heat power balance needs to be ensured between the total heat load and the heat supply sources, including the CHP units, TES, and EB.
Q EB t + Q TES t + g = 1 N G Q g t = ( 1 + μ hloss ) P hload t ,
where P hload t is the heat load at time t. μ hloss is the heat power loss coefficient and set as 0.05 in this paper.

3.2.6. System Reserve Constraint

An amount of power reserve is considered to ensure the power balance against disturbances and contingencies.
g = 1 N G ( P g max P g t ) R e P eload t ,
where R e is the system reserve ratio.

4. Case Study

To validate the effectiveness of the proposed model, a sea island county in China is studied. The island county is located in the northern Yellow Sea on the east side of Liaodong Peninsula and it consists of 195 islands, covering an area of 142 square kilometers on land and 10,324 square kilometers on sea. The sea area has sufficient wind resources and a microgrid system is built to integrate wind generation.
The microgrid consists of 2 × 20 MW CHP units, 200 MW wind power, and a tie line of 60 MW connecting to the main grid. The prices are set as $0.06/kWh for wind generation, $0.5/kWh for the energy transfered through tie line, and $603/ton for the coal. Table 1 and Table 2 illustrate the cost coefficients and technical parameters for the CHP units. Figure 4, Figure 5 and Figure 6 show a typical daily electrical load profile, a typical daily heat load profile, and the typical available wind power for a month.

4.1. System Configuration Results

Three cases are tested to analyze the performance of TES and EB in relieving wind curtailment, including (1) without TES and EB, (2) with EB, (3) with TES. The cost of EB is set as $ 4 × 10 5 per MW. The efficiencies of TES and EB are set the same as 0.98. Table 3 illustrates the optimal configuration results for the three cases.
As shown in Table 3, the utilization rate of wind power is only 81.12% without any electrical-heat conversion devices. The wind curtailment not only limits the profit of wind turbines (i.e., wind generation cost) to $ 8.975 × 10 6 but also leads to a wind curtailment penalty of $ 5.9187 × 10 6 , which seriously affects the economic performance of wind generation. Taking minimizing the total operating cost as the objective function, the optimal rated power capacity of EB is obtained at 33.53 MW with an annualized cost of $ 1.0476 × 10 6 . The optimal configuration of TES is obtained as 45.84 MW/328.95 MWh and the annualized cost is $ 1.7166 × 10 6 .
After installing EB, the utilization rate of wind power increases significantly and reaches 94.20%. As a result, the profit of wind turbine increases to $ 10.4221 × 10 6 , and the wind curtailment penalty also deceases to $ 1.8186 × 10 6 . Although there is an additional annualized cost for EB as $ 1.0476 × 10 6 , the overall annual revenue of the microgrid increases by $ 1.7882 × 10 6 .
Compared with EB, the installation of TES facilities the bi-direction and time-shifting flexibility support from TES to utilize wind generation. The utilization rate of wind generation further increases to 96.85%. As a result, the wind generation profit increases $ 0.2931 × 10 6 compared to the case of installing EB and $ 1.7402 × 10 6 compared to the case without EB and TES. The wind curtailment penalty also decreases $ 0.8306 × 10 6 and $ 4.9307 × 10 6 compared to the other two cases. Although the TES solution requires a higher annualized cost at $ 1.7166 × 10 6 , the overall annual revenue of the microgrid increases $ 0.7607 × 10 6 and $ 2.5489 × 10 6 compared to other two cases. It should be noted that the tie line energy profit increases by $ 1.1316 × 10 6 when comparing the TES solutions with the EB solution due to the extra bi-direction and time-shifting flexibility.
In summary, comparing the tested three cases, the TES solution realizes a lowest minimum total cost (i.e., highest total revenue), which validates that TES can not only improve the utilization of renewable wind power in the microgrid but also realize a better economic performance.
To further analyze the operational details with the installation of EB and TES, Figure 7 presents the typical two-day power profiles of the available wind power and the utilized wind power with EB. Figure 8 shows the wind power profiles for the same two days after installing TES, and Figure 9 shows the energy states of TES.
As it can be seen from Figure 7 and Figure 8, installing TES can further mitigate the fluctuations of the integrated wind generation compared to installing EB. A part of wind power is stored in TES in heat during the peak period, which realizes peak shaving. The average fluctuation level of wind power can be evaluated by Δ P mean as
Δ P mean = 1 T 1 t = 1 T ( | P grid t + 1 P grid t | ) .
The value of Δ P mean is 6.47 for the original available wind power and it is reduced to 4.65 with the installation of EB. With the configured TES, Δ P mean is reduced to 3.77, which validates that installing TES can increase the utilized wind energy and also smooth the integrated wind power at the same time.
As shown in Figure 9, during hours 1 to 5, TES is in the charging mode due to the surplus wind power and the energy state of TES is also increased. From hour 5 to hour 24, the heating power is decreased due to the reduction of available wind power and the energy state of TES is also declined. The wind power varies during hours 24–44; therefore, the heating power and the energy states of TES are also under fluctuations. After hour 44, the available wind power increases and so as the energy state of TES. In other word, the energy state of TES can reflect the variation of wind power. TES can mitigate the fluctuations of wind power by frequently changing the heating power and storing/releasing thermal energy to support the power balance of electrical network and increase the utilization rate of wind power.

4.2. Performance of TES in Wind Power Utilization under Different Scenarios

The variations of wind power changes along with the months. Figure 10 shows the performance of TES in utilizing wind power with different variation level in different months. The variation level of wind power is represented by the standard deviation of the available wind power. It can be found that the consumption rate of wind power is affected by the variation level. A higher variation level would lead to a lower wind power consumption rate.
The sizing of various components in the microgrid will highly affect the system operational cost and the optimal capacity of TES. The microgrid scale mainly depends on the demand (i.e., electrical load and heat load) and the installed renewable generation. Therefore, a study is performed to discuss the impact of different wind power capacities, different electrical load levels, and different heat load levels on the optimal capacity of TES to achieve the minimum operational cost, as shown in Figure 11, Figure 12 and Figure 13.
Figure 11 shows the optimal TES configurations and wind consumption rates with different wind power capacities. It shows that a higher capacity of TES is needed for the increased wind power capacity due the increased available wind generation. Moreover, as the electrical load and heat load remain the same in the microgrid, the wind consumption rate will consequently decrease. Therefore, without demand growth in the microgrid, continually installing more wind turbines would lead to an increasing requirement of TES capacity and an declining utilization rate of wind power.
Figure 12 shows the optimal TES capacities and corresponding wind power consumption rates with different electrical load growth rates. The increasing electrical load can consume more wind generation, which leads to a increase in wind power consumption rate. The role of TES in utilizing wind power and supply heat load is reduced accordingly, so the optimal TES capacity is decreased.
Figure 13 shows the optimal TES capacities and corresponding wind power consumption rates with different heat load growth rates. With the increasing heat load, the thermal network can provide more support to wind power utilization. Therefore, a higher optimal TES capacity is obtained accordingly, resulting a stronger capability of utilizing redundant wind energy for heat supply. A wind power consumption rate of 98.59% is realized with 40% growth of heat load.

5. Discussion

Integrating electrical and thermal network can facilitate the regulation capability of thermal network to address the uncertainty in wind generation. CHP units are important components to connect and coordinate the electrical and thermal power. Considering the operating limits of CHP units, introducing additional flexible electricity-heat conversion devices can significantly increase the operational flexibility of the microgrid. As demonstrated in the Case Study, installing EB as an additional resource can not only bring extra profits of wind turbines and reduce the wind curtailment penalty by increasing wind power utilization rate, but also improve the economic performance of the whole microgrid. Moreover, the optimally configured TES can further improve the wind power utilization and increase the economic profits due to its bi-direction and time-shifting flexibility. The additional cost of installing TES can be totally covered by the increased revenue.
Besides, the analyses of TES configurations under different wind power capacities, different electrical load levels, and different heat load levels show that a higher TES capacity is needed for larger wind generation capacity, while the increments in electrical load and heat load can consume more wind generation and provide more flexibility, which leads to less required TES capacity.

6. Conclusions

This paper investigates the optimal configuration of for relieving wind generation curtailment in an island microgrid. By comparing the cases with and without EB and TES, it is found that introducing additional flexible resources to the integrated electricity-thermal microgrid network can bring technical and economic benefits. Further comparisons show that TES can provide better performances in wind power utilization and overall revenue compared to EB due to its additional flexibility. In addition, the analyses of TES configurations under different scenarios reveal that a microgrid with larger wind generation capacity and lower electrical and heat load demand would require higher TES capacity to achieve the optimal performance.

Author Contributions

Conceptualization, H.L., W.G. and Q.J.; methodology, H.L., J.S., Y.G.; validation, W.G. and Y.G.; formal analysis, J.S.; investigation, H.L.; resources, H.L. and Q.J.; data curation, W.G.; writing—original draft preparation, H.L. and Y.G.; writing—review and editing, H.L., W.G. and Q.J.; visualization, J.S.; supervision, Q.J.; project administration, W.G.; funding acquisition, H.L. and Q.J. All authors have read and agreed to the published version of the manuscript.

Funding

This work was supported in part by the National Key Research and Development Program of China (No. 2019YFB1505400).

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

The data presented in this study are available on request from the corresponding author. The data are not publicly available due to security and privacy concerns.

Conflicts of Interest

The authors declare no conflict of interest. The funders had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript, or in the decision to publish the results.

References

  1. Cheng, Z.; Geng, G.; Jiang, Q.; Guerrero, J.M. Energy Management of CHP-Based Microgrid with Thermal Storage for Reducing Wind Curtailment. J. Energy Eng. 2018, 144, 04018066. [Google Scholar] [CrossRef] [Green Version]
  2. Luo, G.L.; Li, Y.L.; Tang, W.J.; Wei, X. Wind curtailment of China’s wind power operation: Evolution, causes and solutions. Renew. Sustain. Energy Rev. 2016, 53, 1190–1201. [Google Scholar] [CrossRef]
  3. Ji, P.; Zhou, X.X.; Wu, S. Review on sustainable development of island microgrid. In Proceedings of the 2011 International Conference on Advanced Power System Automation and Protection, Beijing, China, 16–20 October 2011; Volume 3, pp. 1806–1813. [Google Scholar] [CrossRef]
  4. Ryndzionek, R.; Sienkiewicz, Ł. Evolution of the HVDC Link Connecting Offshore Wind Farms to Onshore Power Systems. Energies 2020, 13, 1914. [Google Scholar] [CrossRef] [Green Version]
  5. Semero, Y.K.; Zhang, J.; Zheng, D. Optimal energy management strategy in microgrids with mixed energy resources and energy storage system. IET Cyber-Phys. Syst. Theory Appl. 2020, 5, 80–84. [Google Scholar] [CrossRef]
  6. Tooryan, F.; HassanzadehFard, H.; Collins, E.R.; Jin, S.; Ramezani, B. Smart integration of renewable energy resources, electrical, and thermal energy storage in microgrid applications. Energy 2020, 212, 118716. [Google Scholar] [CrossRef]
  7. Khorramdel, H.; Aghaei, J.; Khorramdel, B.; Siano, P. Optimal Battery Sizing in Microgrids Using Probabilistic Unit Commitment. IEEE Trans. Ind. Inform. 2016, 12, 834. [Google Scholar] [CrossRef]
  8. Wang, Y.; Tang, Y.; Xu, Y.; Xu, Y. A Distributed Control Scheme of Thermostatically Controlled Loads for the Building-Microgrid Community. IEEE Trans. Sustain. Energy 2020, 11, 350–360. [Google Scholar] [CrossRef]
  9. Jing, Z.; Luo, Z. An IGDT Model for Capacity Configuration Optimization of Island Microgrid. Energy Procedia 2019, 158, 2774–2779. [Google Scholar] [CrossRef]
  10. Li, Y.; Vilathgamuwa, M.; Choi, S.S.; Xiong, B.; Tang, J.; Su, Y.; Wang, Y. Design of minimum cost degradation-conscious lithium-ion battery energy storage system to achieve renewable power dispatchability. Appl. Energy 2020, 260, 114282. [Google Scholar] [CrossRef]
  11. Zhang, H.; Zhang, Q.; Gong, T.; Sun, H.; Su, X. Peak Load Regulation and Cost Optimization for Microgrids by Installing a Heat Storage Tank and a Portable Energy System. Appl. Sci. 2018, 8, 567. [Google Scholar] [CrossRef] [Green Version]
  12. Liu, N.; Wang, J.; Wang, L. Hybrid Energy Sharing for Multiple Microgrids in an Integrated Heat–Electricity Energy System. IEEE Trans. Sustain. Energy 2019, 10, 1139–1151. [Google Scholar] [CrossRef]
  13. Chen, X.; Kang, C.; O’Malley, M.; Xia, Q.; Bai, J.; Liu, C.; Sun, R.; Wang, W.; Li, H. Increasing the Flexibility of Combined Heat and Power for Wind Power Integration in China: Modeling and Implications. IEEE Trans. Power Syst. 2015, 30, 1848–1857. [Google Scholar] [CrossRef]
  14. Bahramirad, S.; Reder, W.; Khodaei, A. Reliability-Constrained Optimal Sizing of Energy Storage System in a Microgrid. IEEE Trans. Smart Grid 2012, 3, 2056–2062. [Google Scholar] [CrossRef]
  15. Alipour, M.; Mohammadi-Ivatloo, B.; Zare, K. Stochastic Scheduling of Renewable and CHP-Based Microgrids. IEEE Trans. Ind. Inform. 2015, 11, 1049–1058. [Google Scholar] [CrossRef]
  16. Alva, G.; Lin, Y.; Fang, G. An overview of thermal energy storage systems. Energy 2018, 144, 341–378. [Google Scholar] [CrossRef]
  17. Aluisio, B.; Dicorato, M.; Forte, G.; Litrico, G.; Trovato, M. Integration of heat production and thermal comfort models in microgrid operation planning. Sustain. Energy Grids Netw. 2018, 16, 37–54. [Google Scholar] [CrossRef]
  18. Jin, M.; Feng, W.; Liu, P.; Marnay, C.; Spanos, C. MOD-DR: Microgrid optimal dispatch with demand response. Appl. Energy 2017, 187, 758–776. [Google Scholar] [CrossRef] [Green Version]
  19. Violante, W.; Cañizares, C.A.; Trovato, M.A.; Forte, G. An Energy Management System for Isolated Microgrids with Thermal Energy Resources. IEEE Trans. Smart Grid 2020, 11, 2880–2891. [Google Scholar] [CrossRef]
  20. Zhang, G.; Shen, Z.; Wang, L. Online Energy Management for Microgrids with CHP Co-Generation and Energy Storage. IEEE Trans. Control. Syst. Technol. 2020, 28, 533–541. [Google Scholar] [CrossRef]
Figure 1. System structure of a microgrid integrating electrical and thermal networks.
Figure 1. System structure of a microgrid integrating electrical and thermal networks.
Energies 14 02851 g001
Figure 2. Electrical and heat power characteristics of CHP units.
Figure 2. Electrical and heat power characteristics of CHP units.
Energies 14 02851 g002
Figure 3. Schematic diagram of TES using phase change materials.
Figure 3. Schematic diagram of TES using phase change materials.
Energies 14 02851 g003
Figure 4. Typical daily electrical load profile.
Figure 4. Typical daily electrical load profile.
Energies 14 02851 g004
Figure 5. Typical daily heat load profile.
Figure 5. Typical daily heat load profile.
Energies 14 02851 g005
Figure 6. Typical available wind power for a month.
Figure 6. Typical available wind power for a month.
Energies 14 02851 g006
Figure 7. Wind generation with the installation of EB.
Figure 7. Wind generation with the installation of EB.
Energies 14 02851 g007
Figure 8. Wind generation with the installation of TES.
Figure 8. Wind generation with the installation of TES.
Energies 14 02851 g008
Figure 9. Energy state of TES.
Figure 9. Energy state of TES.
Energies 14 02851 g009
Figure 10. The wind power consumption rates of different months with TES.
Figure 10. The wind power consumption rates of different months with TES.
Energies 14 02851 g010
Figure 11. The impact of increased wind power capacity on TES configuration and wind power consumption.
Figure 11. The impact of increased wind power capacity on TES configuration and wind power consumption.
Energies 14 02851 g011
Figure 12. The impact of increased electrical load on TES configuration and wind power consumption.
Figure 12. The impact of increased electrical load on TES configuration and wind power consumption.
Energies 14 02851 g012
Figure 13. The impact of increased heat load on TES configuration and wind power consumption.
Figure 13. The impact of increased heat load on TES configuration and wind power consumption.
Energies 14 02851 g013
Table 1. Cost coefficients of CHP units.
Table 1. Cost coefficients of CHP units.
ParameterUnitValue
b 0 t · h 1 4.038
b 1 t · ( MW · h ) 1 0.095
b 2 t · ( MW · h ) 1 0.014
b 3 t · MW 2 · h 1 6 × 10 5
b 4 t · MW 2 · h 1 1.8 × 10 5
b 5 t · MW 2 · h 1 1.3 × 10 6
Table 2. Technical parameters of CHP units.
Table 2. Technical parameters of CHP units.
C v 1 , g C v 2 , g c m , g K g P g max P g min R g up R g dn
0.150.150.85−5 MW20 MW10 MW5 MW/h5 MW/h
Table 3. Configuration results considering TES and EB.
Table 3. Configuration results considering TES and EB.
ValuesWithout EB and TESWith EBWith TES
EB Rated Power Capacity/MW033.530
TES Rated Power Capacity/MW0045.84
TES Rated Energy Capacity/MWh00328.95
EB Annualized Cost/ 10 6  $01.04760
TES Annualized Cost/ 10 6  $001.7166
CHP Generating Cost/ 10 6  $24.588224.405424.6438
Wind Generation Cost/ 10 6  $8.975010.422110.7152
Wind Curtailment Penalty/ 10 6  $5.91871.81860.9880
Tie line Energy Cost/ 10 6  $−80.8849−80.8849−82.0155
Wind Power Utilization Rate/%81.1294.2096.85
Total Cost / 10 6  $−41.4030−43.1912−43.9519
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Luo, H.; Ge, W.; Sun, J.; Jiang, Q.; Gong, Y. Using Thermal Energy Storage to Relieve Wind Generation Curtailment in an Island Microgrid. Energies 2021, 14, 2851. https://doi.org/10.3390/en14102851

AMA Style

Luo H, Ge W, Sun J, Jiang Q, Gong Y. Using Thermal Energy Storage to Relieve Wind Generation Curtailment in an Island Microgrid. Energies. 2021; 14(10):2851. https://doi.org/10.3390/en14102851

Chicago/Turabian Style

Luo, Huanhuan, Weichun Ge, Jingzhuo Sun, Quanyuan Jiang, and Yuzhong Gong. 2021. "Using Thermal Energy Storage to Relieve Wind Generation Curtailment in an Island Microgrid" Energies 14, no. 10: 2851. https://doi.org/10.3390/en14102851

APA Style

Luo, H., Ge, W., Sun, J., Jiang, Q., & Gong, Y. (2021). Using Thermal Energy Storage to Relieve Wind Generation Curtailment in an Island Microgrid. Energies, 14(10), 2851. https://doi.org/10.3390/en14102851