Next Article in Journal
Exploring Cultivation Path of Building Information Modelling in China: An Analysis from the Perspective of an Innovation Ecosystem
Next Article in Special Issue
Integrated Evaluation of the Impediments to the Adoption of Coconut Palm Wood as a Sustainable Material for Building Construction
Previous Article in Journal
Using Characteristic Energy to Study Rural Ethnic Minorities’ Household Energy Consumption and Its Impact Factors in Chongqing, China
Previous Article in Special Issue
Granulated Blast-Furnace Slag and Coal Fly Ash Ternary Portland Cements Optimization
 
 
Article
Peer-Review Record

Practical Analysis of BIM Tasks for Modular Construction Projects in South Korea

Sustainability 2020, 12(17), 6900; https://doi.org/10.3390/su12176900
by Myungdo Lee 1, Dongmin Lee 2, Taehoon Kim 3 and Ung-Kyun Lee 4,*
Reviewer 1: Anonymous
Reviewer 2:
Reviewer 3: Anonymous
Sustainability 2020, 12(17), 6900; https://doi.org/10.3390/su12176900
Submission received: 7 July 2020 / Revised: 20 August 2020 / Accepted: 21 August 2020 / Published: 25 August 2020
(This article belongs to the Special Issue Sustainable Construction and Building Materials for Environment)

Round 1

Reviewer 1 Report

  • Sample size is small. What statistical method is used for sampling? How is it determined that 22 is enough?
  • Using mean and especially standard deviation is not correct with ordinal data.
  • Inclusiveness and exclusiveness of tasks and activities could be elaborated.
  • The logic of BIM UI should be explained.
  • Possibly some non-parametric tests could be used to highlight the important results (e.g. in Table 5)

Author Response

We are very grateful for your opinions. I have faithfully reflected your opinions in the manuscript. Please see the attachment.

Author Response File: Author Response.pdf

Reviewer 2 Report

  • the relation the authors want to start between BIM and the modular construction is weak. cause BIM is a methodology that helps improve the different phases of any project. so the tools exist and any tools could be applied without being assigned to a specific construction method such as the modular method
  • the list could be expanded or even shrank according to top the BIM manger and the job description 
  • I would rather prefer as a BIM user to know what template /software more involved in this methodology 

Author Response

We are very grateful for your opinions. I have faithfully reflected your opinions in the manuscript. Please see the attachment.

Author Response File: Author Response.pdf

Reviewer 3 Report

The paper is well-structured and written.

My minor revisions are:

- line 196. The references Lee and Sheeare are cited in the text in a wrong way according to journal template.

- Literature review section should be placed as main heading before the others sub-sections

- Result and Discussion should be listed in the manuscript as separate heading sections

Author Response

We are very grateful for your opinions. I have faithfully reflected your opinions in the manuscript. Please see the attachment.

Author Response File: Author Response.pdf

Round 2

Reviewer 1 Report

I believe further revision, especially in the methodology section, can improve the paper.

Author Response

 We have supplemented the methodology according to your opinion. First, for a clear description of the methodology, " 2. Research methodology" was newly distinguished, and supplementary explanations for the procedure and Figure 2 were added. Please see the attachment.

Author Response File: Author Response.pdf