Yeom, D.-J.; Na, E.-J.; Lee, M.-Y.; Kim, Y.-J.; Kim, Y.S.; Cho, C.-S.
Performance Evaluation and Life Cycle Cost Analysis Model of a Gondola-Type Exterior Wall Painting Robot. Sustainability 2017, 9, 1809.
https://doi.org/10.3390/su9101809
AMA Style
Yeom D-J, Na E-J, Lee M-Y, Kim Y-J, Kim YS, Cho C-S.
Performance Evaluation and Life Cycle Cost Analysis Model of a Gondola-Type Exterior Wall Painting Robot. Sustainability. 2017; 9(10):1809.
https://doi.org/10.3390/su9101809
Chicago/Turabian Style
Yeom, Dong-Jun, Eun-Ji Na, Mi-Young Lee, Yoo-Jun Kim, Young Suk Kim, and Chung-Suk Cho.
2017. "Performance Evaluation and Life Cycle Cost Analysis Model of a Gondola-Type Exterior Wall Painting Robot" Sustainability 9, no. 10: 1809.
https://doi.org/10.3390/su9101809
APA Style
Yeom, D. -J., Na, E. -J., Lee, M. -Y., Kim, Y. -J., Kim, Y. S., & Cho, C. -S.
(2017). Performance Evaluation and Life Cycle Cost Analysis Model of a Gondola-Type Exterior Wall Painting Robot. Sustainability, 9(10), 1809.
https://doi.org/10.3390/su9101809