Shang, L.; Li, X.; Shi, H.; Kong, F.; Wang, Y.; Shang, Y.
Long-, Medium-, and Short-Term Nested Optimized-Scheduling Model for Cascade Hydropower Plants: Development and Practical Application. Water 2022, 14, 1586.
https://doi.org/10.3390/w14101586
AMA Style
Shang L, Li X, Shi H, Kong F, Wang Y, Shang Y.
Long-, Medium-, and Short-Term Nested Optimized-Scheduling Model for Cascade Hydropower Plants: Development and Practical Application. Water. 2022; 14(10):1586.
https://doi.org/10.3390/w14101586
Chicago/Turabian Style
Shang, Ling, Xiaofei Li, Haifeng Shi, Feng Kong, Ying Wang, and Yizi Shang.
2022. "Long-, Medium-, and Short-Term Nested Optimized-Scheduling Model for Cascade Hydropower Plants: Development and Practical Application" Water 14, no. 10: 1586.
https://doi.org/10.3390/w14101586
APA Style
Shang, L., Li, X., Shi, H., Kong, F., Wang, Y., & Shang, Y.
(2022). Long-, Medium-, and Short-Term Nested Optimized-Scheduling Model for Cascade Hydropower Plants: Development and Practical Application. Water, 14(10), 1586.
https://doi.org/10.3390/w14101586