Li, R.; Zhang, D.; Wu, P.; Fang, Q.; Li, A.; Cao, L.
Combined Application of Pipe Roof Pre-SUPPORT and Curtain Grouting Pre-Reinforcement in Closely Spaced Large Span Triple Tunnels. Appl. Sci. 2020, 10, 3186.
https://doi.org/10.3390/app10093186
AMA Style
Li R, Zhang D, Wu P, Fang Q, Li A, Cao L.
Combined Application of Pipe Roof Pre-SUPPORT and Curtain Grouting Pre-Reinforcement in Closely Spaced Large Span Triple Tunnels. Applied Sciences. 2020; 10(9):3186.
https://doi.org/10.3390/app10093186
Chicago/Turabian Style
Li, Ran, Dingli Zhang, Peng Wu, Qian Fang, Ao Li, and Liqiang Cao.
2020. "Combined Application of Pipe Roof Pre-SUPPORT and Curtain Grouting Pre-Reinforcement in Closely Spaced Large Span Triple Tunnels" Applied Sciences 10, no. 9: 3186.
https://doi.org/10.3390/app10093186
APA Style
Li, R., Zhang, D., Wu, P., Fang, Q., Li, A., & Cao, L.
(2020). Combined Application of Pipe Roof Pre-SUPPORT and Curtain Grouting Pre-Reinforcement in Closely Spaced Large Span Triple Tunnels. Applied Sciences, 10(9), 3186.
https://doi.org/10.3390/app10093186