Optimising Grid-Connected PV-Battery Systems for Energy Arbitrage and Frequency Containment Reserve

by
Rodolfo Dufo-López
*,
Juan M. Lujano-Rojas
,
Jesús S. Artal-Sevil
and
José L. Bernal-Agustín
Department of Electrical Engineering, Universidad de Zaragoza, 50018 Zaragoza, Spain
*
Author to whom correspondence should be addressed.
Batteries 2024, 10(12), 427; https://doi.org/10.3390/batteries10120427
Submission received: 4 November 2024 / Revised: 27 November 2024 / Accepted: 1 December 2024 / Published: 2 December 2024
(This article belongs to the Section Battery Modelling, Simulation, Management and Application)

Abstract

:
This study introduces a novel method for optimising the size and control strategy of grid-connected, utility-scale photovoltaic (PV) systems with battery storage aimed at energy arbitrage and frequency containment reserve (FCR) services. By applying genetic algorithms (GA), the optimal configurations of PV generators, inverters/chargers, and batteries were determined, focusing on maximising the net present value (NPV). Both DC- and AC-coupled systems were explored. The performance of each configuration was simulated over a 25-year lifespan, considering varying pricing, solar resources, battery ageing, and PV degradation. Constraints included investment costs, capacity factors, and land use. A case study conducted in Wiesenthal, Germany, was followed by sensitivity analyses, revealing that a 75% reduction in battery costs is needed to make AC-coupled PV-plus-battery systems as profitable as PV-only systems. Further analysis shows that changes in electricity and FCR pricing as well as limits on FCR charging can significantly impact NPV. The study confirms that integrating arbitrage and FCR services can optimize system profitability.

1. Introduction

Utility-scale PV generators sell electricity to AC grids in the long-term market through a power purchase agreement (PPA) or in the daily/intraday market, thus establishing a marginal cost of electricity [1]. Adding storage to PV generators, specifically batteries (PV-plus-battery systems), helps the system enhance its functionality. The functionalities added by the battery are energy arbitrage and also a range of support services, including black start capability, frequency regulation, reactive support, voltage control, and strategic participation in ancillary service markets [2,3]. Other benefits can also be obtained using batteries, such as reduced curtailment or ramp rate control. Zhao et al. [4] reviewed the application and integration of grid-connected batteries.
Energy arbitrage consists of the following:
  • Storing the energy produced by the PV generator (charging the battery) when the energy prices are low (usually when there is low demand);
  • Selling energy to the grid by discharging the battery when the prices are high (high demand).
FCR is an ancillary service, also known as the primary control reserve (PCR), which is the first response to frequency disturbances. When frequency deviations occur, FCR intervenes automatically within seconds to restore the balance between supply and demand. Battery systems are particularly suitable for FCR because of their short reaction times (less than 1 s total response time, including control and inverter delays) [5].
With the continuous increase in renewable energy generation, the shape of day-ahead hourly price curves has changed, lowering daytime prices [6]. When the PV penetration is high, the hourly electricity price turns into a “duck” shape [7], with significantly low prices at noontime (high photovoltaic generation). This has happened in California [6] and western Australia [7]. In these cases, storage can be helpful to provide energy arbitrage and ancillary services such as FCR. Depending on the shape of the electricity price curve and the battery cost and duration, energy arbitrage can be economically viable in PV-plus-battery systems compared to PV-only systems. Zhao et al. [6] showed the dependence of electricity market prices on renewable penetration and also on storage. With an increase in storage, storage will no longer be a price-taker but also a price-maker. They concluded that with the expected cost reduction, Li-ion batteries would dominate the storage market (compared to lead–acid, vanadium redox flow batteries, and compressed air energy storage).
PV-plus-battery plants are economically viable in specific scenarios, such as improving flexibility and system performance [8]. In the literature review, previous studies analysed energy arbitrage using batteries. Many have found that storage costs should be reduced to be financially rewarding, but others have found it profitable. However, this depends on the storage costs, degradation, and hourly electricity pricing curves. The following paragraphs present the main contributions obtained from the literature review.
Zhang et al. [9] asserted that price arbitrage using only storage (charge from the grid at low prices and discharge at high prices) is not viable because storage capacity costs are high, specifically for Li-ion batteries. The authors of the current study found similar results [10]. Hu et al. [11] analysed energy arbitrage using battery energy storage systems (BESS) in European countries. Using a Li-ion battery as a reference, the wear cost was higher than 0.073 EUR/kWh and the hourly electricity price of the daily market in 2019 and 2020. They concluded that energy arbitrage with Li-ion batteries was only suitable for less than 10% of the time during those years. However, the PV-plus-battery system can be profitable at different spot prices, battery costs, and durations. Arcos-Vargas et al. [12] presented a mixed-integer linear programming (MILP) model for the optimisation of the battery and inverter size and a trading strategy for energy arbitrage of BESS in the Spanish electrical system, considering the recent reduction in costs and increase in roundtrip efficiency and cycle life. They concluded that the optimal inverter power/battery capacity ratio is 3 MW/10 MWh (3.33 h battery duration) and that after 2024, BESS energy arbitrage could be profitable. Terlouw et al. [13] showed multi-objective optimisation (minimisation of both costs and CO2 emissions) of an aggregator in the Swiss intra-day market. They considered energy arbitrage and compared six different types of batteries (using a simple ageing model), concluding that Li-ion batteries can be economically profitable. Campana et al. [14] performed a Monte Carlo analysis to study the impacts of climate, electricity prices, and different Li-ion battery parameters on PV-plus-battery systems in commercial buildings used for price arbitrage, peak shaving, and self-consumption.
In energy arbitrage, battery degradation substantially impacts system profitability, as shown by Wankmüller et al. [15], and its impact on costs was also discussed by Wu et al. [16] in PV-plus-battery systems. Mulleriyawage and Shen [17] also mentioned the importance of accurately calculating the battery degradation.
Concerning the differences between AC- and DC-coupled PV-plus-battery systems used for arbitrage, DiOrio et al. [8] designed an optimisation model for the energy storage operation of PV-plus-battery systems with AC- or DC-coupled configurations, modelling the interactions with the AC grid. The battery degradation was not calculated but was considered a fixed value (20% in 20 years). Some researchers have considered AC-coupled systems. Feng et al. [18] optimised the battery bank size of an AC-coupled PV-wind-battery system using genetic algorithms (GA) to increase net revenue by considering energy arbitrage. However, the authors did not calculate the battery degradation. They only considered a fixed depreciation factor, and the battery was charged only during the lowest price periods and discharged only during the highest price periods without optimising the price signal thresholds. Wu et al. [19] presented an optimisation model of the battery size in PV-battery AC-coupled systems under time-of-use tariffs. They optimised the charging/discharging rates during different hourly periods, considering battery degradation.
Regarding DC-coupled PV-plus-battery systems, Schleifer et al. [20] optimised this type of system in the United States. They considered the inverter loading ratio (ILR: PV nominal power/inverter nominal power) from 1.4 to 2.6 and the battery/inverter ratio (BIR: battery nominal power/inverter nominal power) from 0.25 to 1.0. They found that with low-cost renewable power, the optimal ILR can be 2.0–2.4 at a BIR of 1.0 (even with high clipping and/or curtailment energy). Montañés et al. [21] analysed different scenarios for DC- and AC-coupled PV-plus-battery and wind-plus-battery systems. They considered different values for the battery size and ILR in different U.S. power markets, including battery degradation (cycling and calendar). The authors concluded that battery size has the most significant impact on the NPV of the system, and a two-hour battery duration is optimal.
For FCR services, utility-scale BESS have become increasingly attractive for grid ancillary services, particularly FCR [22]. FCR units must provide FCR automatically, offering positive and negative FCR power (charge/discharge) for the same service period. In Germany, the former service period for FCR was one month (the service had to be provided continuously for one month) in a pay-as-bid auction. In 2011, the FCR service period decreased to one week, and the minimum bid size was reduced to 1 MW. In 2019, the service period decreased to one day, and the pricing was modified to a market-clearing-price procedure for the offered power. In 2020, the service period was reduced to 4 h (six daily slots) [23,24]. The FCR service period could be reduced to 1 h in the future. Several previous studies have investigated or optimised BESS to provide FCR services. Khajeh et al. [25] developed a model to optimise the location and size of a BESS in a distribution network, thereby maximising profits by providing FCR. Krupp et al. [26] studied the impact of the operating strategy of a BESS coupled with a power-to-heat module, considering FCR. Wigger et al. [27] studied the economic and environmental implications of service FCR provided by a standalone BESS or hybrid systems composed of BESS with power-to-heat units or BESS with electrolysers. Meschede et al. [28] demonstrated the profitability of supplementing an existing generating technology with a BESS to provide FCR, compared to the standalone operation of the current technology.
Other studies have optimised the BESS for arbitrage and ancillary services (FCR) using Li-ion batteries. Biggins et al. [29] optimised the bidding strategy for a battery system. They concluded that tight-band arbitrage can provide significant income and not impede the storage’s ability to provide FCR services. Pusceddu et al. [30] proved the synergies of arbitrage and FCR, obtaining maximum benefits for 1.5–2 h battery duration storage. Naemi et al. [31] presented an optimisation model to maximise the NPV of a wind-farm battery system by optimising the battery size and considering the energy arbitrage and FCR ancillary services. The authors did not consider battery degradation. Gomez-Gonzalez et al. [32] showed that when adding FCR, there was a significant increase in total income with a low impact on battery degradation in low-power PV self-consumption systems. Some authors suggested that the benefits of arbitrage are usually higher than ancillary services [18], whereas others suggested the opposite [29].
The main contribution of this study is that it is the first time that an optimisation model has been developed that includes all the following features. It determines the appropriate sizes for PV generators, batteries, and inverter/chargers. It optimizes the control strategies, analysing price signals and state-of-charge (SOC) thresholds for deciding when to engage in arbitrage or FCR operations. It includes both AC- and DC-coupled systems and uses sophisticated models for battery degradation. The simulations run for a system’s entire 25-year lifespan in one-minute intervals. Additionally, the model considers how the battery degrades, how photovoltaic power decreases over time, changes in solar irradiation, and variations in electricity prices hour by hour throughout the system’s life. It also evaluates changes in inverter efficiency and the energy the storage system uses. We employed a genetic algorithm (GA) metaheuristic for optimisation and considered FCR service durations, which are currently four hours in Central Europe, with a possibility of reducing to one hour in the future. This thorough methodology is unique compared to previous studies.

2. Materials and Methods

Optimising a PV-plus-battery system is complex. Various combinations of technologies and sizes of PV generators, batteries, inverters/chargers, and set points for control strategies can be considered. For each combination, the system’s performance must be simulated during the system lifetime in steps of 1 min, considering battery degradation, PV derating, and changes in irradiation and electricity prices during the years. After the simulation of each combination was performed, we calculated the economic results (net present cost, NPC, and others). After all combinations were evaluated (or a fraction of them, if using GA), we obtained the optimal system. Figure 1 shows the PV-plus-battery system in both AC- and DC-coupled versions [5] (the efficiencies shown in Figure 1 are defined later in Section 2.4). The DC-coupled inverter-charger includes a DC–DC converter.
The following subsections present the optimisation objective, applied metaheuristic technique (GA), economic calculations, and detailed system simulation.

2.1. Optimisation Objective

The software simulates, in time steps of one minute during the system lifetime (typically 25 years, equal to the expected PV lifetime), different combinations of possible components (PV generator, inverter/charger, battery, etc.) and control strategies (set points for arbitrage and FCR). The objective of the optimisation is to maximise the NPV of the system (the difference between the present value of cash inflows and that of cash outflows over the system’s lifetime [33]), as calculated in Section 2.3, and subject to the following constraints (Equations (1)–(3)).
  • The total investment cost cannot exceed a maximum C A P E X m a x (MEUR).
C o s t j < C A P E X m a x
where C o s t j   is the CAPEX of component j (PV cell, battery, and inverter/charger).
  • The total land the system uses must not exceed the maximum allowable L a n d _ u s e m a x (ha).
P V s i z e · P V l a n d _ u s e + B s i z e · B l a n d _ u s e < L a n d _ u s e m a x
where P V s i z e (MW) and B s i z e (MWh) are the PV and battery sizes, respectively; P V l a n d _ u s e (ha/MW) and B l a n d _ u s e (ha/MWh) are the specific land uses, respectively.
  • The capacity factor (CF) is defined here as the total energy injected (sold) to the grid ( E t o t a l _ s e l l , calculated in Section 2.5) during the system lifetime L i f e s (years) divided by the maximum energy that can be injected into the grid. CF must be higher than the minimum capacity factor C F m i n .
C F = E t o t a l _ s e l l P m a x _ g r i d · 365 · 24 · L i f e s > C F m i n
where P m a x _ g r i d   (MW) is the maximum power that can be injected into the grid (grid power limit).
These constraints are defined by the designer, considering the maximum cost of the inverters, the maximum land available for the project, and the minimum capacity factor, which determines the minimum efficiency of the system (considering the maximum capacity of the grid). In some countries, this regulation is required.

2.2. Genetic Algorithms

The software employs the GA for optimisation if the computation time is extended. Two GAs were used: a main GA to optimise the combination of components and a secondary GA to optimise the control strategy (for each combination of components considered).
The vectors of the variables to be optimised are as follows.
Five variables are optimised for the main GA (optimisation of components). Figure 2 shows the vector of variables that represents each individual (possible solution) in the main GA.
These variables are integer values. P V t y p e is the code for the PV generator type (in AC-coupled, it includes its inverter), P V N p a r is the number of PV generators of the type P V t y p e in parallel, B t y p e is the code for the battery type, B N p a r is the number of batteries in parallel, and I C t y p e is the code for the inverter-charger type.
Four variables are optimised for the secondary GA (optimisation of the control strategy, that is, the variables to decide between arbitrage and FCR in each time step). Figure 3 shows the vector of these variables.
These variables are float values obtained between a minimum and maximum in a specific number of steps. The values of P r e l e c _ m i n   _ d i s c h ,   P r e l e c _ m a x   _ c h are in the range of the sold electricity price (between minimum and maximum), while the values of S O C m i n   _ a r b ,   S O C m a x   _ a r b are between the minimum and maximum SOC allowed for the battery (typically between 10 and 100%).
P r e l e c _ m i n   _ d i s c h and P r e l e c _ m a x   _ c h are the price variables to determine if the system operates under arbitrage or FCR conditions, as the electricity price is compared to these values at the beginning of each service period (every 4 h or 1 h, depending on the service period selected), as shown in Figure 4, where t is the time (min), from 0 to the end of the system lifetime ( L i f e S , usually 25 years): 60 min/h·24 h/day·365 day/year·25 year = 1.314·107 min. In the flowchart in Figure 4, h o u r is the hour of the day, m i n u t e is the minute of the hour, and h o u r s t a r t _ p e r i o d is the hour of the day when the FCR service period starts; if the service period is 4 h, h o u r s t a r t _ p e r i o d is 0, 4, 8, … 20, whereas if the service period is 1 h, h o u r s t a r t _ p e r i o d is 0, 1, 2, … 23.
P r e l e c _ m i n   _ d i s c h is the minimum electricity price necessary for the discharge under arbitrage operation: If the price of electricity at a given hour is higher than P r e l e c _ m i n   _ d i s c h (and S O C t > S O C m i n   _ a r b ), the batteries must be discharged, and electricity must be injected into the AC grid. P r e l e c _ m a x   _ c h is the maximum price required for the charge under arbitrage operation: If the price at a particular hour is sufficiently low (less than P r e l e c _ m a x   _ c h , and S O C t < S O C m a x   _ a r b ), the batteries will be charged using renewable power. If none of the above conditions are met, the batteries are used for the FCR.
S O C m i n   _ a r b and S O C m a x   _ a r b are the minimum and maximum SOC of the battery for the arbitrage operation, respectively. Under the arbitrage operation, the battery charges up to the S O C m a x   _ a r b limit, and when discharging the battery, it discharges to the S O C m i n   _ a r b limit.
Figure 4 shows a flowchart that clearly illustrates the procedure followed to determine arbitrage or FCR at the beginning of each service period.
The secondary GA obtains the optimal control for each combination of components the main GA considers (Figure 5).
The GA used for the optimisation of components starts with the random generation of Nm vectors (first generation, Ngen_main = 1). The secondary GA is used to optimise the control strategy of each combination of components: A first generation is randomly obtained, simulating the performance of each combination and obtaining NPV and fitness. Then, using the selection, crossing, and mutation, a second generation is obtained by the secondary GA, repeating the process of the first generation. This process is repeated Ngen_sec_max times, and finally, the optimal control strategy for each combination of components is found. The main GA uses the selection, crossing, and mutation to obtain the second generation, repeating the process until Ngen_main_max generations have been obtained. The optimal combination of components and control strategy is one of the last generations of the main GA with the maximum NPV.
The calculation of the fitness of each vector of the main algorithm depends on its rank in the population, as given in Equation (4) [32,33,34] (the secondary algorithm uses a similar equation):
f i t n e s s i = N m + 1 i n = 1 N m N m + 1 n
In order to obtain the parents, the GA uses roulette proportional selection, one-point crossover, and non-uniform mutation. The parameters used by the GA were obtained in a previous work [35].

2.3. NPV, LCOE, and IRR Calculation

The NPV of combination i of components and k of control strategy evaluated ( N P V i , k ) is calculated using Equation (5), which considers the income from the FCR service during the system lifetime LifeS (years) and from selling electricity to the grid and all the costs (the components CAPEX and OPEX, their cost of replacement, and the cost of electrical energy purchased from the grid).
N P V i , k = y = 1 L i f e S I n c s e l l E y + I n c F C R y C o s t p u r c h E y 1 + I y j C o s t j + N P C r e p j + y = 1 L i f e S C o s t O & M _ j 1 + I n f y 1 + I y
where NPCrep_j is total present costs owing to replacements of component j (PV, battery, and inverter/charger) during the PV lifetime (same as system lifetime; battery lifetime depends on its performance; inverter-charger lifetime is usually 10–15 years). CostO&M_j is the annual OPEX of component j at the beginning; Costpurch_E_y and Incsell_E_y are, respectively, the cost of the electricity purchased from the AC and the income owing to the electricity sold to the AC grid during year y; IncFCR_y is the income from FCR service during year y; Inf and I are, respectively, the annual inflation and nominal interest (discount rate).
The electrical energy income ( I n c s e l l _ E _ y owing to the energy injected into the grid and I n c F C R _ y owing to the FCR service) as well as the costs ( C o s t p u r c h _ E _ y ) during year y are calculated using Equations (6)–(8).
I n c s e l l _ E _ y = t = T 1 s t _ y T 1 s t _ y + 8760 · 60 m i n E s e l l t · P r E s e l l t  
I n c F C R _ y = p e r = N p _ 1 s t _ y N p _ s t _ y + N p e r P F C R p e r · P r F C R p e r
C o s t p u r c h _ E _ y = t = T 1 s t _ y T 1 s t _ y + 8760 · 60 m i n E p u r c h t · P r E p u r c h t
where Esell(t) and Epurch(t) are the electrical energy sold (injected) to the AC grid and the electrical energy purchased from the AC grid during each time step of year y (MWh), respectively; PrEsell(t) and PrEpurch(t) are the sell and buy electricity prices (EUR/MWh), respectively; T 1 s t _ y is the first minute of the year y; PFCR(per) and PrFCR (per) are the FCR power bid offered (MW) and the FCR price (EUR/MW) of each FCR service period (duration of 4 h or 1 h), respectively; N p _ 1 s t _ y is the first period of the year; Nper is the number of FCR service periods in one year (8760 h/4 h = 2190 in the case of 4 h periods or 8760 in the case of 1 h periods).
Real-time pricing (RTP) is considered. The hourly electricity price of the first year can be converted to the rest of the years using the estimated annual inflation. The effect of the increase in PV and wind penetration with time in electricity price is obtained using Equation (9) [36].
P r E s e l l h ,   y = P r E s e l l h ,   0 1 F P V G h ,   1 + F w   y 1 L i f e s 1 1 + I n f P r E y       1 y L i f e s
where P r E s e l l h ,   y is the sell electricity price per hour h of year y, F P V and F w i n d are the PV and wind factors, and I n f P r E is the annual inflation rate for the electricity price. The purchase price of electricity is affected similarly.
Electricity cost will be reduced in the following years due to the increase in renewable penetration. Rifkin [37] showed that the cost of energy from renewables would tend to zero. In this work, for each hour of the year, the reduction in price during the years due to the increase in PV penetration, with factor F P V , is proportional to the irradiance G h ,   1   (expecting that in the hours of higher irradiance, the price reduction will be higher, as occurs with the “duck” curve). The reduction in price during the years due to the increase of wind penetration, with factor F W , is expected to be similar for all the hours of the day. Both reductions are proportional to the year number. For example, let us suppose the case of F P V = 0.5, and F w i n d   = 0.2. The reduction during night hours will be due to the wind factor, that is, 20%, at the end of the system lifetime. At noon, if the irradiance during an hour is, for example, 0.8 kW/m2, the reduction will be 0.8·50% due to the PV factor plus 20% due to the wind factor, that is, a total of 60% reduction at the end of the system lifetime.
The FCR service price is expected to be affected by inflation in electricity prices (Equation (10)).
P r F C R p e r ,   y = P r F C R p e r ,   0 1 + I n f P r E y       1 y L i f e s  
where P r F C R p e r ,   y is the FCR service price of period per of year y.
The price variables to determine whether the operation is arbitrage (charge or discharge) or FCR during each time interval, P r e l e c _ m i n   _ d i s c h and P r e l e c _ m a x   _ c h , are updated every year with the electricity price inflation to ensure that this price is compared to their real values shown in Figure 4.
The levelled cost of energy ( L C O E i , k ) is calculated as the net present cost (NPV total minus present income) divided by the sold energy and affected by electricity inflation and the nominal interest rate (Equation (11)).
L C O E i , k = N P V i , k y = 1 L i f e S I n c s e l l _ E _ y + I n c F C R _ y 1 + I y y = 1 L i f e S t = T 1 s t _ y T 1 s t _ y + 8760 · 60 m i n E s e l l t 1 + I n f P r E y 1 + I y
The internal rate of return ( I R R i , k ) is the discount rate that makes the N P V i , k = 0.

2.4. Simulation of the System

Each combination of components and control strategy was simulated in time steps of 1 min during the system lifetime. A simulation of the system is presented in the following subsections (see Figure 1 for reference).

2.4.1. Irradiation and PV Generation

The global hourly irradiation of year 1, G h , 1 (W/m2), can be downloaded from different databases (PVGIS [38], Renewables Ninja [39], or NASA [40]). For each hour (h) of each year (y), the irradiation G h , y , is obtained by multiplying G h , 1 by a random number N ( 0 , σ h ) that follows a normal distribution centred at 0 with standard deviation σ h [36] (Equation (12)):
G h , y = G h , 1 1 + N 0 , σ h     1 < y L i f e S ,   0 h 8760
A similar procedure is utilized for the diffuse hourly irradiation. The global and diffuse irradiations for each hour of the system lifetime are obtained: Ghours(t) and Dhours(t).
For each time step of 1 min t, the calculation of the 1 min time step irradiance G(t) (W/m2) is carried out using a first-order autoregressive (AR) function ( γ ( t ) ) [36] (Equations (13) and (14)).
γ ( t ) = ϕ 1 G γ ( t 1 ) + N 0 , σ m i n 1 ϕ 1 G 2
G ( t ) = m a x D h o u r s ( t ) , G h o u r s ( t ) 1 + γ ( t )
where ϕ 1 G and σ m i n are the correlation factor and the standard deviation, respectively.
The PV generation output (DC) is obtained in Equation (15) [36], showing the degradation of PV efficiency during the years (factor ( 1 f r e d _ P V ) y 1 ) and the dependence on the temperature (factor [ 1 + α / 100 T c t T c _ r e f ] ):
P P V t = P N ( 1 f r e d _ P V ) y 1 G ( t ) / G r e f f P V _ l o s s [ 1 + α / 100 T c t T c _ r e f ]
where P N is the rated power of the PV generator (MWp), f r e d _ P V is the PV annual degradation factor, f P V _ l o s s is the loss factor, α is the PV power temperature coefficient (%/°C), G r e f and T c _ r e f are the standard irradiance and the cell temperature, and T c t (°C) is the PV cell temperature, calculated in Equation (16).
T c t = T a t + N O C T 20 800 G t
where NOCT (°C) is the nominal operation cell temperature of the PV modules, and T a t (°C) is the ambient temperature.
For bifacial PV modules, the back surface irradiance, Gback(t) (W/m2), was obtained following the work of Durusoy et al. [41]. The bifacial PV generator will supply the power obtained using Equation (17).
P P V ( t ) = P N ( 1 f r e d _ P V ) y 1 G t + β   G b a c k t / G r e f f P V _ l o s s [ 1 + α / 100 T c t T c _ r e f ]
Equation (17) is similar to Equation (15) by simply adding the contribution of the PV generation of the back surface (adding the factor β   G b a c k t to the front irradiation). β is the bifaciality (ratio of the rear to the front power of the PV module under standard conditions).
In AC-coupled systems, the inverter converts DC PV power to AC power, limited to its rated power ( P i n v _ P V ) (Equation (18)). The inverter efficiency ( η i n v _ P V ) varies with the output power. There is a curtailment when the DC output PV power exceeds the inverter rated power, which depends on the ILR (DC/AC ratio) [8].
P P V _ A C ( t ) = m i n   ( P P V t η i n v _ P V ,   P i n v _ P V )
In DC-coupled systems (Equation (19)), if the strategy determines that the PV must inject power into the grid, the inverter/charger converts the PV DC power to AC. Its efficiency ( η i n v _ I C ) also depends on the output power, and the AC power is limited by the inverter rated power ( P i n v _ I C ).
P P V _ A C ( t ) = m i n   ( P P V t η D C D C η i n v _ I C ,   P i n v _ I C )
where η D C D C is the DC–DC efficiency of the DC-coupled inverter-charger.

2.4.2. Battery Charge and Discharge

Depending on the operation (arbitrage or FCR, charge, or discharge, as shown in Figure 4), the battery is charged, discharged, or remains in the float state for each time step.

Arbitrage, Battery Charge

If, during a time step, the operation is arbitrage and battery charge, the battery will be charged with the PV power, considering that it cannot be higher than (i) the power of the charger of the inverter-charger, (ii) the maximum power allowed by the battery, and (iii) the power to charge the battery in the time step to the maximum SOC allowed for arbitrage. The charging power that enters the battery under an arbitrary operation, P c h _ B _ A r b ( t ) , is calculated considering the different efficiencies shown in Figure 1 using Equation (20) (DC-coupled system) or Equation (21) (AC-coupled system).
P c h _ B _ A r b ( t ) = min   P P V ( t ) η D C D C ,   P c h _ I C ,   P m a x _ C h _ B , S O C m a x   _ a r b S O C ( t ) η c h _ B t
P c h _ B _ A r b ( t ) = min   P P V _ A C t η c h _ I C ,   P c h _ I C ,   P m a x _ C h _ B , S O C m a x   _ a r b S O C ( t ) η c h _ B t
where P c h _ I C (MW) is the rated power of the charger of the inverter-charger (maximum charge current multiplied by the DC battery nominal voltage), P max _ c h _ B (MW) is the maximum charge power allowed for the battery (Li-ion, typically 0.5 C), SOCmax_arb is the maximum state of charge of the battery allowed for arbitrage operation (energy, MWh), SOC(t) is the energy SOC at the beginning of time step t, η c h _ B is the battery charge efficiency, Δt = 1/60 h, and η ch _ I C is the charger efficiency of the AC coupled inverter-charger.

Arbitrage, Battery Discharge

If the operation is arbitrage during a time step, and the battery is discharged, it will be discharged with its maximum power. The discharge power of the battery, P disch _ B _ a r b ( t ) , is calculated using Equation (22) (DC-coupled system) or Equation (23) (AC-coupled system).
P d i s c h _ B _ a r b ( t ) = min   S O C ( t ) S O C m i n   _ a r b t η d i s c h _ B , m i n   ( P i n v _ I C , P m a x _ g r i d ) η D C D C η i n v _ I C   ,   P m a x _ d i s c h _ B
P d i s c h _ B _ a r b ( t ) = min   S O C ( t ) S O C m i n   _ a r b t η d i s c h _ B , m i n   ( P i n v _ I C , P m a x _ g r i d ) η i n v _ I C   ,   P m a x _ d i s c h _ B
where SOCmin_arb is the minimum state of charge of the battery allowed for arbitrage operation (MWh), η d i s c h _ B is the battery discharge efficiency, and P m a x _ d i s c h _ B (MW) is the maximum charge power allowed for the battery (Li-ion, typically 1 C).
Figure 6 shows the battery capacity bands used for the arbitrage and FCR.

FCR Operation

Suppose FCR operation is initiated during a service period, which can be either 1 h or 4 h. The bidirectional FCR power that the battery can provide for that period is calculated based on specific regulations. In Germany, since 2019, the maximum offered bidirectional FCR power must be sustainably available for at least 15 min ( t s u p p l y = 0.25 h) at any point within the service period. Additionally, the FCR provider is required to maintain a buffer of 25% over its prequalified power ( F b u f f e r   = 1.25) [23]. The minimum bid is 1 MW, and the minimal increment is also 1 MW. The maximum offered bidirectional FCR power is determined using Equation (24) for AC-coupled systems.
P F C R ( p e r ) = i n t min   S O C ( t ) S O C m i n t s u p p l y η d i s c h _ B η i n v _ I C , S O C m a x S O C ( t ) t s u p p l y η c h _ B η c h _ I C ,   P m a x _ c h _ B   η c h _ I C ,   P m a x _ d i s c h _ B η i n v _ I C , P i n v _ I C · 1 F b u f f e r
For DC-coupled systems, the same equation applies; however, it includes the DC–DC efficiency within the battery charge and discharge efficiencies.
Therein, SOCmin = FSOC_minCn and SOCmax = FSOC_maxCn_y are the minimum and maximum SOC allowed for battery operation (MWh) (Figure 6), respectively; Cn_y is the remaining rated energy capacity of the battery (MWh) (for year 1, it is the rated capacity, Cn; in the following years, owing to degradation, the remaining capacity is reduced annually until its replacement). FSOC_min and FSOC_max are the factors used to calculate the minimum and maximum allowed SOC, respectively. As the capacity of the battery is continuously decreasing because of its degradation (cycling and calendar), SOCmax is being reduced until the battery is replaced (when its remaining capacity drops to a specific percentage of the rated capacity, typically 80%, that is, when the capacity loss reaches 20%); in this study, we update SOCmax at the end of each year, considering degradation.
Once the FCR power bid offered is determined for each period, the charge or discharge power is set for every time step, considering that discharge occurs during time steps when the deviation from the nominal frequency is positive (Δf(t) = fn − f(t) > 0), and charge occurs during time steps of negative deviation (Δf(t) < 0) [42]. The charge/discharge power, P c h _ B _ F C R ( t ) and P d i s c h _ B _ F C R t , is linearly proportional to the deviation Δf(t), with a maximum at Δƒ = ±0.2 Hz. When |Δƒ(t)| > 0.2 Hz, the battery is charged or discharged with the full offered FCR power. The insensitivity range of the frequency control (dead band) is Δƒ(t) = ±10 mHz (within these limits, the battery is not charged or discharged). Equations (25) and (26) detail how the charge and discharge power is adjusted based on frequency deviation, as explained above.
P d i s c h _ B _ F C R ( t ) = P F C R p e r   η i n v _ I C ,     f t > 0.2   H z P F C R p e r   η i n v _ I C · f ( t ) 0.2 H z   ,   0.01 H z < f t 0.2   H z 0 ,   f t 0.01   H z
P c h _ B _ F C R ( t ) = P F C R p e r η c h _ I C ,   f t < 0.2   H z P F C R p e r η c h _ I C · f ( t ) 0.2 H z   ,   0.2 H z f t < 0.01   H z 0 ,     f t 0.01   H z
The previous equations are valid for AC-coupled systems; for DC-coupled systems, the same equations apply, multiplied by the inverter and charger efficiencies and the DC–DC efficiency.
If, during time step t, the PV power is higher than P c h _ B _ F C R ( t ) , the battery is charged with the available power from the PV (not exceeding the maximum allowed), provided SOC is lower than the maximum SOC for arbitrage (Equation (27) for DC-coupled system and Equation (28) for AC-coupled system). When SOC is higher than that value, to prevent a high SOC at the end of the time step and a lower probability of obtaining a high FCR power bid for the next period, if the Boolean variable x bool is 1, the charge is limited to the value obtained in Equation (26).
P c h _ B _ F C R t = m a x P c h B F C R t , m i n P P V t η D C D C ,   P max ch B   , S O C m a x S O C t η c h B t   ,   S O C t S O C m a x   _ a r b   m a x P c h B F C R t , m i n P P V t η D C D C ,   P max ch B   , S O C m a x S O C t η c h B t 1 x b o o l ,     S O C t > S O C m a x   _ a r b
P c h _ B _ F C R t = m a x P c h B F C R t , m i n P P V A C t η c h I C ,   P max ch B   , S O C m a x S O C t η c h B t ,     S O C t S O C m a x   _ A r b   m a x P c h B F C R t , m i n P P V A C t η c h I C ,   P max ch B   , S O C m a x S O C t η c h B t 1 x b o o l ,     S O C t > S O C m a x   _ A r b
When Δƒ(t) is within the dead band, and the battery SOC(t) is higher/lower than a set point SOCmax_corr_start/SOCmin_corr_start, a corrective discharging/charging power (at a specific C-rate Crate_corr) will be applied until the battery drops from/reaches a set point SOCmax_corr_stop/SOCmin_corr_stop [42] (Figure 6).

Battery SOC

The SOC at the beginning of the next time step (minute t + 1) is calculated using Equation (29) when charging or discharging and with Equation (30) during the float stage (when neither charging nor discharging).
S O C ( t + 1 ) = S O C ( t ) + P c h _ B _ a r b ( t ) + P c h _ B _ F C R ( t ) t   η c h _ B P d i s c h _ B _ a r b ( t ) + P d i s c h _ B _ F C R ( t ) η d i s c h _ B t
S O C ( t + 1 ) = S O C ( t )   1 f s e l f _ d i s c h 30 · 24 t
where f s e l f _ d i s c h is the monthly self-discharge factor (approximately 1–3%).

2.5. Energy Sold and Purchased to/from the Grid

The energy sold (injected) to the AC grid is calculated according to Equation (31). For any given time step t, the sell energy E s e l l t is determined by the minimum of several factors.
E s e l l t = m i n P P V t + P d i s c h _ B _ a r b ( t ) + P d i s c h _ B _ F C R ( t ) η D C D C η i n v _ I C P l o a d a u x t , P i n v I C P l o a d _ a u x t ,   P m a x   _ g r i d
where P l o a d _ a u x t is the AC auxiliary consumption of the storage system, which includes cooling, heating, instruments, control, lighting, and battery management system (BMS) control.
For an AC-coupled system, the calculation adjusts, as shown in Equation (32).
E s e l l t = m i n P P V _ A C t + P d i s c h _ B _ a r b t + P d i s c h _ B _ F C R ( t ) η i n v _ I C P l o a d _ a u x t ,   P m a x   _ g r i d
The total energy sold during the system lifetime is calculated using Equation (33).
E t o t a l _ s e l l = y = 1 L i f e S t = 0 8760 · 60 E s e l l t
For energy purchased from the AC grid in a DC-coupled system, refer to Equation (34).
E p u r c h t = m i n max P c h _ B _ A r b t + P c h _ B _ F C R ( t ) + P l o a d _ a u x t η c h _ I C P P V ( t ) η D C D C   / η c h _ I C , 0 , P m a x _ g r i d
For an AC-coupled system, the energy purchased calculation adjusts as in Equation (35).
E p u r c h t = m i n max P c h _ B _ A r b t + P c h _ B _ F C R t + P l o a d _ a u x t η c h _ I C P P V _ A C t η c h _ I C   / η c h _ I C , 0 , P m a x _ g r i d
Finally, the total energy purchased during the system lifetime is given by Equation (36).
E t o t a l _ p u r c h = y = 1 L i f e S t = 0 8760 · 60 E p u r c h t

2.6. Li-Ion Battery Ageing Model

There are different Li-ion technologies [43]; in this study, we considered the lithium iron phosphate (LFP) type, which is typical for this type of application. Regarding cycle ageing [44] and calendar ageing [45], we used the model proposed by Naumann et al., which was obtained by testing LiFePo4/graphite cells (commercial model Sony US26650FTC1). Capacity fading is caused by cycle ageing (Equation (37), dependent on the complete equivalent cycles performed and considering the effect of the depth of discharge DOD and the charge/discharge rate) and calendar ageing (Equation (38), considering the impact of temperature, SOC, and time).
Q l o s s _ c y c = i = 1 10 a c y c C r a t e + b c y c D O D i 0.6 3 c c y c + d c y c F E C i z
Q l o s s _ c a l = k r e f e x p E a R 1 T 1 T r e f S O C 0.5 3 c c a l + d c a l 60 t b a t
where Q l o s s _ c y c (%) is the percentage of capacity loss owing to cycling when F E C i full-equivalent cycles (energy discharged by the battery divided by the battery energy capacity) are cycled at a C-rate C r a t e and depth of discharge D O D i . Q l o s s _ c a l (%) is the percentage of capacity loss owing to the calendar when a time t b a t (min) has passed with an average charge level SOC and average temperature T (K). E a is the activation energy (17,126 Jmol−1), R = 8.314 Jmol−1K−1 is the universal gas constant, T r e f is the reference temperature (298.15 K), and k r e f , a, b, c, d (for cycling or for calendar), and z are constant parameters shown in references [44,45], respectively, which can be modified to fit the ageing performance of another manufacturer’s battery.
The full-equivalent cycles of charge–discharge during the system lifetime are accounted for in 11 intervals ( F E C 1 is the number of full-equivalent cycles performed by the battery at 0.1–2% of DOD, and D O D 1 is the average of the range, that is, 0.01; F E C 2 is the number of FEC at 2–10% of DOD, and D O D 2 = 0.06; … F E C 11 is the number of FEC at 90–100% DOD and D O D 11 = 0.95). Equation (39) includes the sum of all the contributions of the DOD ranges.
Equations (37) and (38) are calculated at the end of each year, comparing the total loss Q l o s s _ c y c + Q l o s s _ c a l (%) with the maximum loss allowed ( Q l o s s _ m a x , generally considered as 20 or 30% of Cn). When the total loss reaches Q l o s s _ m a x , the battery end of life is reached, and the battery must be replaced (currently, F E C i   a n d   t b a t are reset to 0). A maximum operating life of 20 years is considered for stationary battery systems [45].
The battery remaining capacity at the start of each year y is calculated using Equation (39).
C n _ y = C n Q l o s s _ c y c + Q l o s s _ c a l 100

3. Results and Discussion

This section presents the results of this study and addresses the research questions listed in Section 2. A base case located in Wiesenthal, Germany, was optimised. After that, a sensitivity analysis was performed to evaluate the effects of certain variables.
The following subsections explain the data, results, and sensitivity analysis.

3.1. Base Case Data

A system was optimised near Wiesenthal, Germany (latitude 50.70° N, longitude 10.18° E). The following subsections present the irradiation and temperature data, FCR data, component features and costs, and electricity prices.

3.1.1. Irradiation and Temperature

The hourly irradiation and temperature data were downloaded from the PVGIS [38] database (data for the year 2020). Figure 7 and Figure 8 show the hourly irradiance at an azimuth (south-faced) horizontal axis tracking. The annual irradiation over the front surface was 1432 kWh/m2, whereas the back irradiation was 306 kWh/m2 (albedo 0.2). Figure 9 shows the hourly temperature data for 2020.
The irradiance in minute steps for all 25 years was obtained with the values σ h = 0.05 (from NASA data [40]), ϕ 1 G = 0.9, and σ min = 0.2. The annual irradiation over the average (%) for the 25 years of the simulation is shown in Figure 10. The random results (following a Gaussian distribution) obtained in this case (Figure 10) imply that irradiation decreases in year 25, which could seem strange. It was due to the randomness of the model. A future improvement for this work would be considering not only the randomness but also the predictions on sun irradiance for the future years.

3.1.2. FCR

The average frequency for each minute of the year 2022 was calculated using frequency data available at [46]. Figure 11 shows the frequency for one week in July.
The price for the FCR used is based on data downloaded from [47] and corresponds to the entire year 2023. Figure 12 shows the prices for the first week of July 2023.
An FCR service period of 4 h was considered in the base case (the German case, with data shown in Section 2.4.2). The correction set points were as follows: SOCmax_corr_start = 80%, SOCmin_corr_start = 20%, SOCmax_corr_stop = 70%, and SOCmin_corr_stop = 30%, with a power rate of Crate_corr = 0.125.

3.1.3. Costs

The cost assumptions were based on the utility-scale data storage (60 MW/240 MWh) from ref. [48]. The storage CAPEX cost, including all costs (including inverter-charger and extra costs: BOS, taxes, installation labour, permitting fees, overheads, and contingencies), for a 4 h duration storage in the USA, Q1 2022, was approximately 430 EUR/kWh (Li-ion standalone storage system [48]). A wide range of costs has been reported in the literature, for example, 321 USD/kWh [8] or 575 USD/kWh [49].
For the battery cabinet (including battery packs, containers, thermal management system, and fire suppression system), we consider 211 USD/kWh, which is affected by a factor of 1.5, to include the extra costs (BOS, taxes, etc.), using a total of 295 EUR/kWh [48] (considering a euro/dollar exchange rate of 0.93).
For the inverter-charger, 116 USD/kW was reported in [48], which is also affected by the same factor of 1.5 to include extra costs, resulting in approximately 160 EUR/kW. The total cost of the Li-ion standalone storage system was 295 EUR/kWh + (160 EUR/kW/4 h) = 335 EUR/kWh.
The PV CAPEX (including the inverter) in AC-coupled PV systems without storage was reported to be 0.54 EUR/Wac for the 5th percentile [50]. This percentile is considered because in PV-plus-battery systems, coupling allows sharing several hardware components between the PV and energy storage systems, which can reduce costs. The PV inverter cost can represent 8% of the total cost of the PV system [48], so the absence of a PV inverter in DC-coupled systems reduces the total cost to 0.5 EUR/Wdc. For bifacial PV, there are four additional cents per Watt [51].
Batteries are expected to reduce their cost annually by 4% (cost escalation of 4%/year [8]). This value calculates the replacement costs during the system’s lifetime (when batteries reach their end of life and must be replaced).
The O&M (OPEX) annual costs for PV were reported to be 10 EUR/kWac [52]. Considering that the PV and energy storage systems share several hardware components, we estimate the PV OPEX to be 1% of the PV CAPEX in this work. For the battery, we considered 1% of the battery CAPEX [53] (higher OPEX costs are reported by NREL [54], which include battery replacement costs, which are considered separately in this study).
BESS in Germany are exempt from many network costs and other charges that usually apply to regular consumers. Specifically, batteries do not have to pay network fees and the electricity tax [55].
The financial costs are the nominal discount rate I = 7% and general inflation rate Inf = 2%. The duration of the study was 25 years. The total CAPEX of the system should be obtained through a loan with a 7% interest rate for 25 years.
According to the European Central Bank projections, inflation in Germany is expected to gradually decrease in the coming years, reaching 2.4% in 2024 and 2.0% in 2025 [56]. The Deutsche Bundesbank also provides detailed inflation forecasts. According to their projections, inflation in Germany follows a downward trend [57]. These forecasts suggest that, for economic studies over 25 years, a reasonable average annual inflation rate for Germany could be around 2%.

3.1.4. Electricity Price

At the beginning of the system (year 0), the hourly electricity spot price for 2023 in Germany [58] (average 0.0952 EUR/kWh) was considered for the selling and purchasing prices of electricity (Figure 13).
Using Equation (9) with F PV = 0.5 and F wind   = 0.2, we obtained the electricity prices, considering Inf PrE   = 2% annual inflation for the electricity price.
Figure 14 shows the daily average hourly electricity selling price for the different years; all are compared to the 1st year.

3.1.5. Components

Before selecting the component sizes, the maximum grid power must be determined. In this case, P m a x _ g r i d = 100 MW. Two types of PV generators were considered: PV type = 0 , 1 , both 20 MWdc; one was monofacial, while the other was bifacial. The number in parallel was between 4 and 8; PV Npar = x Z | 4     x   8 (between 80 MW and 160 MW total PV power). For the battery, only one type was considered: 40 MWh/10 MW (4 h duration [8]) ( B type = 0 ), from 4 to 8 in parallel; B Npar = x Z   |   4   x   8 (between 160/40 and 320/80 MWh/MW total). For the inverter-charger, five types were considered, namely I C type = 0 ,   1 ,   2 ,   3 , 4 , in steps of 20 MW (40–120 MW). The binary variable x bool was set to 1.
Auxiliary load consumption for the battery (cooling, heating, instruments, control, lighting, and BMS control) was considered to be 0.4% of the battery-rated power [59]: P l o a d _ a u x t = 0.4/100· P m a x _ c h _ B . The ambient temperature of the batteries is supposed to be constant at 20 °C.
The land uses considered in this work were 2.5 ha/MW for PV [60] and 10 ha/GWh for battery storage.
Table 1 lists the main data, and Figure 15 shows the inverter efficiency curve.

3.2. Constraints

The constraints were as follows: CAPEX max = 250 MEUR, Land _ use max = 400 ha, maximum 160 MW (PV-only), and CF min = 0.2. The maximum land use implies a PV-only system with a maximum of 160 MW. A minimum capacity factor (defined as annual output AC energy divided by the yearly maximum energy that could be injected into the grid considering the grid limit of 100 MW, which is 876,000 MWh) of 0.2 implies a minimum PV monofacial generator of approximately 0.2 × 876,000/1432/0.8 = 152.9 MW (considering 1432 kWh/m2 annual irradiance on the front surface and a performance ratio of 0.8). These constraints are valid since we have two types of PV generators (monofacial and bifacial), and the system includes BESS.

3.3. Base Case Optimisation Results

The simulation used an Intel i5-6500 CPU (3.2 GHz and 16 GB RAM). In addition, the simulation (during 25 years in 1 min time steps) and evaluation of each combination of components and control were for 17.8 s.
The parameters for the selected GA were as follows: maximum number of generations, 10; population, 7 for the main GA and 15 for the secondary GA; crossover rate, 70%; and mutation rate, 1%. These parameters were selected based on a previous study [62], where the optimal parameters of a typical GA used to optimise standalone hybrid renewable systems were obtained. Also, more than 50 quick optimisation tests were performed (considering much faster simulations of just one year with 1-h time steps), comparing the GA with the case of evaluating all the combinations. In these quick tests, with the selected parameters and in all cases, the optimal system was found before the maximum number of generations was reached. Therefore, we can expect that in the normal optimizations (considering in the simulations 25 years in 1 min time steps), the optimal system obtained by the GA is the real optimal one.
For each optimisation, evaluating all combinations would have taken 66 days, whereas using the GA took one day and 9 h. Table 2 lists the optimal systems determined by the GA for the AC-coupled- and DC-coupled systems. The energy values are averaged yearly (different for each year).
The optimal control of PV-plus-battery systems employs FCR and arbitrage. Similar to the works of Biggins et al. [29] and Naemi et al. [31], we found that the combination of arbitrage and FCR improves economic results. Using tight-band arbitrage can provide significant income and not impede the storage’s ability to provide FCR services. In another study, Pusceddu et al. [30] showed the potential synergies between the provision of FCR and arbitrage in the same way.
The results show that AC-coupled systems are more profitable (higher NPV and IRR and lower LCOE) than DC-coupled systems. In addition, the capacity factor was slightly higher for AC-coupled systems. The highest incomes are from selling PV generation directly, whereas FRC incomes account for approximately 15% of the total income. The PV generator included in the optimal configuration is bifacial. The ILR for the AC-coupled system was 1.25, and for the DC-coupled system, it was 1.4. Moreover, BIR was 1 for the AC-coupled and 0.4 for the DC-coupled system. The battery lifetime obtained in the degradation model was 19.8 years for the AC-coupled and 20.4 years for the DC-coupled systems, which are higher than the maximum operating life for stationary battery systems (20 years); this is the final value considered in the economic calculations.
The system without storage (PV-only system of 160 MWdc) has an NPV 56% higher than that of the optimal AC-coupled PV-plus-battery system, indicating that storage, with the present costs and considering the electricity fees used in this study, is not profitable.
Figure 16 shows the simulation of the optimal AC-coupled system over two consecutive days (year 12, 1–2 January). The FCR operation is selected for all the time except for 4 h (from 12:00 to 16:00 on the second day) when there is arbitrage and discharge. At 12:00, the SOC is higher than the minimum SOC for arbitrage, and the electricity price is higher than the set point limit. Therefore, arbitrage and discharge are selected for the next 4 h. In PV generation, there is a limitation in PV production because of its inverter (ILR = 1.25; rated power of the inverter is 112 MW) and the injected energy limit of the power grid (100 MW).
Figure 17 shows the simulation of the optimal DC-coupled system for the same two consecutive days, where the FCR service is used throughout the day (no arbitrage). In Figure 17, we can see the curtailment (to the limit of 100 MW) in the power injected into the grid due to the inverter-charger power limit.
In both figures, the maximum and minimum SOC for arbitrage are the percentages shown in Table 2 multiplied by the battery’s maximum capacity during year 12.
The FCR service implies low battery charge/discharge power, as shown in Figure 16 and Figure 17, where the SOC variations are relatively low compared to the variations when the battery is charged due to the PV curtailment or discharged due to the arbitrage operation. The arbitrage operation implies higher changes in SOC and therefore a higher number of full-equivalent cycles per year. As shown in Table 2, the battery lifetime is 19.8 years in the case of the AC-coupled optimal system and more than 20 years in the case of DC-coupled system. Given that a maximum operating life of 20 years is considered for stationary battery systems [45], in both cases, the battery lifetime is almost unaffected by FCR and arbitrage operation.
Using second-life batteries [63] (with much lower price) instead of new batteries, the degradation would also be low. Therefore, these systems with second-life batteries could cause the PV-battery system to be competitive with the PV-only.
Lithium titanate batteries (LTO) can reach a much higher number of cycles than LFP [64]; however, the limitation of 20 years of operating life for stationary battery systems is also applied to these batteries. As LTO batteries are much more expensive than LFP, the results using LTO would not be expected to be better. Regarding sodium-ion batteries, they will be a promising alternative to lithium-ion batteries in the following years. Nowadays, there is a limited manufacturing capacity, which restricts the supply chain, raises costs, and diminishes its manufacturing [65]. In the near future, if manufacturing problems disappear, if the sodium-ion batteries’ cost is lower than LFP, and if the cycle lifetime is similar or even better, the results obtained in this paper could be improved with this new technology. The battery degradation model shown in Section 2.6 is valid for LFP batteries. If another battery chemistry is considered, the model parameters should be changed to fit the new chemistry degradation curves, or a new model should be established.
The loss factor ( f P V _ l o s s ) is assumed to be 95% (Table 1), which means that (apart from the losses due to temperature and inverter efficiency), an extra 5% loss is considered in the PV generation, which could include maintenance downtimes and equipment failures. In real conditions, if these failures imply more than 5% of the PV generation, the system profitability would decrease. Also, maintenance and equipment failure in the inverter-charger and in the battery could affect profitability.
For comparison purposes, we again optimised the PV-plus-battery AC-coupled system using a discrete version of the particle swarm optimisation (PSO) algorithm [66] with the following parameters: number of epochs = 20, population = 500, cognitive coefficient = 2, and social coefficient = 2. PSO was programmed to optimise the components and control strategy using a unique algorithm (all variables were codified in a unique vector). The optimal PV-plus-battery AC-coupled system obtained by PSO has an NPV of 76.54 MEUR, slightly lower than the optimal obtained using GA (77.35 MEUR). The components are the same, but the control strategy is different. With PSO, the arbitrage price limits are 0.176 and 0.352 EUR/kWh, and the arbitrage SOC limits are 30% and 50%. In this study, GA obtained better results than PSO, possibly because GA uses two algorithms, while the PSO algorithm was programmed with a single algorithm to reduce complexity. Figure 18 shows the evolution of both algorithms.

3.4. Sensitivity Analysis

The sensitivity analysis of the most relevant variables was evaluated by repeating the optimisation for each case.

3.4.1. Cases of x bool = 0, no FCR, and 1 h FCR Service

If x bool = 0, that is, if there is no extra limitation for P c h _ B _ F C R ( t ) when the SOC is higher than the maximum for arbitrage, the NPV variation over the base case as a percentage is shown in Table 3 (NPV is reduced by approximately 20%). In the same table, we can see that the NPV decreases significantly if there is no FCR service, resulting in a reduction of roughly 25% for AC-coupled systems and 45% for DC-coupled systems. This indicates that FCR can be a good source of income for battery systems. In addition, considering a 1 h FCR service instead of a 4 h results in a significantly low increase in NPV.
The FCR service has little impact on the life of the batteries due to the low charge/discharge current, as shown in Table 4.

3.4.2. Cases of Different Inflation of Electricity Prices

The effect of annual electricity price inflation on the NPV of the optimal system is presented in Table 5. Electricity price inflation has a significant impact on NPV (higher in DC-coupled systems).

3.4.3. Cases of Reduction in Battery CAPEX

Table 6 shows the effect of the decrease in battery CAPEX.
For a battery price reduction of 75% (considering only battery cost reduction and no reduction in the inverter-charger), the optimal AC-coupled system has an NPV similar to the PV-only system without storage.

3.4.4. Cases of Different F PV and F wind Factors (Change in Future Electricity Price Curves)

The effect of the NPV variation on the AC-coupled and DC-coupled optimal results for different cases of F PV and F wind factors is shown in Table 7 (base case used F PV = 0.5 and F wind = 0.2). The results show the high dependence of NPV on the values of F PV and F wind Low values of F PV and F wind imply higher future electricity price and therefore an increase in NPV, while high values imply high lower electricity price and a decrease in NPV.
The extreme case of F PV = 1 (maximum reduction in price at noon) and F wind = 0 (no price change at night) implies the greatest differences in electricity price between the night peak and the noon valley; this way the storage systems can benefit. In this case, the average electricity price is lower than in the base case; therefore, the NPV is lower in all the cases, but the NPV reduction is much lower in the storage systems. The AC-coupled optimal system NPV is reduced by 6% compared to the base case, the DC-coupled is reduced by 7%, and the PV-only is greatly reduced by 39%. In this case, the NPV of the AC-coupled optimal system is similar to the PV-only, showing that if the hourly electricity price curve takes a steeper duck shape in the coming years, a system with storage can be competitive with the photovoltaic-only system.

3.5. System Located in Spain

The same system was optimized near Zaragoza, Spain (latitude 41.66° N, longitude 0.86° W), considering the same FCR data, component features, and costs and using the hourly electricity spot price for 2023 in Spain (average 0.0877 EUR/kWh). Table 8 shows the optimal results, which include the same components as in the Germany optimizations but different control variables and economic results (higher NPV due to higher irradiation in Spain).
In the case of Spain, to achieve an NPV for the AC-coupled system similar to the NPV of the PV-only system, the battery price needed to be reduced by 80%.

4. Conclusions

This paper presents a new method for simulating and optimising utility-scale PV-plus-battery systems considering energy arbitrage and FCR. Unlike previous studies, both AC-coupled and DC-coupled systems were considered, and more accurate models were used in the simulations. More accurate simulation models imply more accurate economic results and more precise optimisation. The optimisation attempted to determine the most profitable system (with the highest NPV). The optimisation variables were the sizes of the components and the control set points (the electricity price limit for charge/discharge and the SOC limits for the arbitrage operation). Each combination of components and control strategy was simulated in 1 min steps during the system lifetime (typically 25 years). In the simulations, changes in all the relevant variables during the years (irradiation, electricity price, battery degradation, and PV derating) were considered. Owing to the inadmissible computation times when evaluating all possible combinations, optimisations were performed using the GA. Unlike previous studies, this study considered advanced battery degradation models (for cycling and calendar) and PV derating, different irradiation, and hourly electricity price curves for each year of the system lifetime. In addition, the auxiliary load consumption of the storage system and variable inverter efficiencies were considered.
A particular case study of Wiesenthal (Germany) was investigated. The present components’ cost and the hourly electricity price in 2023 in Germany were used. The electricity prices of the rest of the years were estimated with the effect of the increase or renewable penetration (“duck curve”). Also, 2023 FCR service prices in Germany (4 h service periods) were used, considering a yearly inflation rate of electricity and FCR service of 2%. The optimal system included a small SOC range for arbitrage (20% to 40% for AC-coupled services and 20% to 60% for DC-coupled services), showing the synergy between arbitrage and FCR services. AC-coupled systems are more profitable than DC-coupled systems (24% higher NPV); however, they cannot compete economically with PV systems without storage, whose NPV is 56% higher than that of AC-coupled PV-plus-battery systems.
The variations in the base cases were evaluated. It can be seen that a limitation for the charge under the FCR service (when SOC is higher than the maximum for arbitrage to avoid excessive SOC and reduction in future FCR incomes) is essential. Otherwise, a significant reduction in NPV was achieved. In addition, systems with only arbitrage (without FCR) achieved significant reductions in the NPV, indicating that FCR services are an essential source of income. By reducing the FCR service period to 1 h, a slight increase in the NPV was achieved. As expected, a reduction in the annual inflation of electricity and FCR service prices (even considering negative inflation values) implies a significant reduction in the NPV. Finally, the effect of the decrease in the battery CAPEX was evaluated. With a 75% reduction in battery CAPEX (from the present value of 295 EUR/kWh to 74 EUR/kWh), the NPV of the optimal PV-plus-battery AC-coupled system would be similar to that of the PV system without storage. It was also found that, if the hourly electricity price curve takes a steeper duck shape in the coming years, a system with storage can be competitive with the photovoltaic-only system. As in previous studies, we found that combining arbitrage and FCR improves economic results compared to a system with only FCR or arbitrage. The same system was optimized in Zaragoza, Spain (using the hourly electricity price of Spain, 2023), obtaining better economic results due to higher irradiation. Similar conclusions were found for Spain, needing an 80% reduction in battery CAPEX to make AC-coupled PV-plus-battery systems as profitable as PV-only systems.
In the coming years, the battery cost is expected to be reduced but not in the percentage needed. Therefore, the price of the FCR service should be increased substantially for the PV-battery system to be competitive with the PV-only system in the next years. On the other hand, using second-life batteries (which are much cheaper) could lead to profitable systems with storage. Finally, if cost effectiveness compared to PV-only is unclear, state regulations may need to somehow require the inclusion of storage in PV generators.

Author Contributions

Conceptualization, R.D.-L. and J.M.L.-R.; methodology, R.D.-L.; software, R.D.-L. and J.M.L.-R.; validation, J.L.B.-A., J.M.L.-R. and J.S.A.-S.; formal analysis, R.D.-L., J.L.B.-A., J.M.L.-R. and J.S.A.-S.; investigation, R.D.-L. and J.M.L.-R.; resources, R.D.-L. and J.L.B.-A.; data curation, J.S.A.-S.; writing—original draft preparation, R.D.-L.; writing—review and editing, R.D.-L., J.L.B.-A., J.M.L.-R. and J.S.A.-S.; visualization, R.D.-L.; supervision, R.D.-L.; project administration, R.D.-L.; funding acquisition, R.D.-L. All authors have read and agreed to the published version of the manuscript.

Funding

This work was supported by the Spanish Government (Ministerio de Ciencia e Innovación, Agencia Estatal de Investigación) and by the European Regional Development Fund [Grant PID2021-123172OB-I00 funded by MCIN/AEI/10.13039/501100011033 and by “ERDF A way of making Europe”]. It was also supported by the the Spanish Government (Ministerio de Ciencia e Innovación, Agencia Estatal de Investigación) and the European Union [Grant No. TED2021-129801B-I00 funded by MCIN/AEI/10.13039/501100011033 and by European Union NextGenerationEU/PRTR].

Data Availability Statement

Data will be made available on request.

Acknowledgments

We wish to thank Dongwei Zhao for his support in the generation of electricity price curves.

Conflicts of Interest

The authors declare that there are no conflicts of interest regarding the publication of this paper.

References

  1. Legrand, M.; Labajo-Hurtado, R.; Rodríguez-Antón, L.M.; Doce, Y. Price arbitrage optimization of a photovoltaic power plant with liquid air energy storage. Implementation to the Spanish case. Energy 2022, 239, 121957. [Google Scholar] [CrossRef]
  2. Bassett, K.; Carriveau, R.; Ting, D.S.K. Energy arbitrage and market opportunities for energy storage facilities in Ontario. J. Energy Storage 2018, 20, 478–484. [Google Scholar] [CrossRef]
  3. Liu, X. Research on Grid-Connected Optimal Operation Mode between Renewable Energy Cluster and Shared Energy Storage on Power Supply Side. Int. J. Energy Res. 2024, 2024, 21. [Google Scholar] [CrossRef]
  4. Zhao, C.; Andersen, P.B.; Træholt, C.; Hashemi, S. Grid-connected battery energy storage system: A review on application and integration. Renew Sustain. Energy Rev. 2023, 182, 113400. [Google Scholar] [CrossRef]
  5. Koltermann, L.; Drenker, K.K.; Cortés, M.E.C.; Jacqué, K.; Figgener, J.; Zurmühlen, S.; Sauer, D.U. Potential analysis of current battery storage systems for providing fast grid services like synthetic inertia—Case study on a 6 MW system. J. Energy Storage 2023, 57, 106190. [Google Scholar] [CrossRef]
  6. Zhao, D.; Jafari, M.; Botterud, A.; Sakti, A. Strategic energy storage investments: A case study of the CAISO electricity market. Appl. Energy 2022, 325, 119909. [Google Scholar] [CrossRef]
  7. Wilkinson, S.; Maticka, M.J.; Liu, Y.; John, M. The duck curve in a drying pond: The impact of rooftop PV on the Western Australian electricity market transition. Util. Policy 2021, 71, 101232. [Google Scholar] [CrossRef]
  8. DiOrio, N.; Denholm, P.; Hobbs, W.B. A model for evaluating the configuration and dispatch of PV plus battery power plants. Appl. Energy 2020, 262, 114465. [Google Scholar] [CrossRef]
  9. Zhang, X.; Qin, C.; Loth, E.; Xu, Y.; Zhou, X.; Chen, H. Arbitrage analysis for different energy storage technologies and strategies. Energy Rep. 2021, 7, 8198–8206. [Google Scholar] [CrossRef]
  10. Dufo-López, R. Optimisation of size and control of grid-connected storage under real time electricity pricing conditions. Appl. Energy 2015, 140, 395–408. [Google Scholar] [CrossRef]
  11. Hu, Y.; Armada, M.; Sánchez, M.J. Potential utilization of battery energy storage systems (BESS) in the major European electricity markets. Appl. Energy 2022, 322, 119512. [Google Scholar] [CrossRef]
  12. Arcos-Vargas, Á.; Canca, D.; Núñez, F. Impact of battery technological progress on electricity arbitrage: An application to the Iberian market. Appl. Energy 2020, 260, 114273. [Google Scholar] [CrossRef]
  13. Terlouw, T.; AlSkaif, T.; Bauer, C.; van Sark, W. Multi-objective optimization of energy arbitrage in community energy storage systems using different battery technologies. Appl. Energy 2019, 239, 356–372. [Google Scholar] [CrossRef]
  14. Campana, P.E.; Cioccolanti, L.; François, B.; Jurasz, J.; Zhang, Y.; Varini, M.; Stridh, B.; Yan, J. Li-ion batteries for peak shaving, price arbitrage, and photovoltaic self-consumption in commercial buildings: A Monte Carlo Analysis. Energy Convers. Manag. 2021, 234, 113889. [Google Scholar] [CrossRef]
  15. Wankmüller, F.; Thimmapuram, P.R.; Gallagher, K.G.; Botterud, A. Impact of battery degradation on energy arbitrage revenue of grid-level energy storage. J. Energy Storage 2017, 10, 56–66. [Google Scholar] [CrossRef]
  16. Wu, Y.; Liu, Z.; Liu, J.; Xiao, H.; Liu, R.; Zhang, L. Optimal battery capacity of grid-connected PV-battery systems considering battery degradation. Renew. Energy 2022, 181, 10–23. [Google Scholar] [CrossRef]
  17. Mulleriyawage, U.G.K.; Shen, W.X. Optimally sizing of battery energy storage capacity by operational optimization of residential PV-Battery systems: An Australian household case study. Renew. Energy 2020, 160, 852–864. [Google Scholar] [CrossRef]
  18. Feng, L.; Zhang, X.; Li, C.; Li, X.; Li, B.; Ding, J.; Zhang, C.; Qiu, H.; Xu, Y.; Chen, H. Optimization analysis of energy storage application based on electricity price arbitrage and ancillary services. J. Energy Storage 2022, 55, 105508. [Google Scholar] [CrossRef]
  19. Wu, Y.; Liu, Z.; Li, B.; Liu, J.; Zhang, L. Energy management strategy and optimal battery capacity for flexible PV-battery system under time-of-use tariff. Energy 2022, 200, 558–570. [Google Scholar] [CrossRef]
  20. Schleifer, A.H.; Murphy, C.A.; Cole, W.J.; Denholm, P. Exploring the design space of PV-plus-battery system configurations under evolving grid conditions. Appl. Energy 2022, 308, 118339. [Google Scholar] [CrossRef]
  21. Montañés, C.C.; Gorman, W.; Mills, A.D.; Kim, J.H. Keep it short: Exploring the impacts of configuration choices on the recent economics of solar-plus-battery and wind-plus-battery hybrid energy plants. J. Energy Storage 2022, 50, 104649. [Google Scholar] [CrossRef]
  22. Thien, T.; Schweer, D.; vom Stein, D.; Moser, A.; Sauer, D.U. Real-world operating strategy and sensitivity analysis of frequency containment reserve provision with battery energy storage systems in the german market. J. Energy Storage 2017, 13, 143–163. [Google Scholar] [CrossRef]
  23. Figgener, J.; Tepe, B.; Rücker, F.; Schoeneberger, I.; Hecht, C.; Jossen, A.; Sauer, D.U. The influence of frequency containment reserve flexibilization on the economics of electric vehicle fleet operation. J. Energy Storage 2022, 53, 105138. [Google Scholar] [CrossRef]
  24. Pant, P.; Hamacher, T.; Perić, V.S. Ancillary Services in Germany: Present, Future and the Role of Battery Storage Systems. TechRxiv. 2024. Available online: https://www.techrxiv.org/users/714191/articles/734392-ancillary-services-in-germany-present-future-and-the-role-of-battery-storage-systems (accessed on 3 November 2024).
  25. Khajeh, H.; Parthasarathy, C.; Doroudchi, E.; Laaksonen, H. Optimized siting and sizing of distribution-network-connected battery energy storage system providing flexibility services for system operators. Energy 2023, 285, 129490. [Google Scholar] [CrossRef]
  26. Krupp, A.; Beckmann, R.; Draheim, P.; Meschede, E.; Ferg, E.; Schuldt, F.; Agert, C. Operating strategy optimization considering battery aging for a sector coupling system providing frequency containment reserve. J. Energy Storage 2023, 68, 107787. [Google Scholar] [CrossRef]
  27. Wigger, H.; Draheim, P.; Besner, R.; Brand-Daniels, U.; Vogt, T. Environmental and economic analysis of sector-coupling battery energy storage systems used for frequency containment reserve. J. Energy Storage 2023, 68, 107743. [Google Scholar] [CrossRef]
  28. Meschede, E.; Schlachter, U.; Diekmann, T.; Hanke, B.; von Maydell, K. Assessment of sector-coupling technologies in combination with battery energy storage systems for frequency containment reserve. J. Energy Storage 2022, 49, 104170. [Google Scholar] [CrossRef]
  29. Biggins, F.A.V.; Homan, S.; Ejeh, J.O.; Brown, S. To trade or not to trade: Simultaneously optimising battery storage for arbitrage and ancillary services. J. Energy Storage 2022, 50, 104234. [Google Scholar] [CrossRef]
  30. Pusceddu, E.; Zakeri, B.; Gissey, G.C. Synergies between energy arbitrage and fast frequency response for battery energy storage systems. Appl. Energy 2021, 283, 116274. [Google Scholar] [CrossRef]
  31. Naemi, M.; Davis, D.; Brear, M.J. Optimisation and analysis of battery storage integrated into a wind power plant participating in a wholesale electricity market with energy and ancillary services. J. Clean. Prod. 2022, 373, 133909. [Google Scholar] [CrossRef]
  32. Gomez-Gonzalez, M.; Hernandez, J.C.; Vera, D.; Jurado, F. Optimal sizing and power schedule in PV household-prosumers for improving PV self-consumption and providing frequency containment reserve. Energy 2020, 191, 116554. [Google Scholar] [CrossRef]
  33. Dufo-López, R. Software iHOGA/MHOGA. 2023. Available online: https://Ihoga.Unizar.Es/En (accessed on 5 May 2023).
  34. Lujano-Rojas, J.; Dufo-Lopez, R.; Dominguez-Navarro, J.A. Genetic Optimization Techniques for Sizing and Management of Modern Power Systems; Elsevier Inc.: Amsterdam, The Netherlands, 2023. [Google Scholar]
  35. Dufo-López, R.; Bernal-Agustín, J.L. Design and control strategies of PV-diesel systems using genetic algorithms. Sol. Energy 2005, 79, 33–46. [Google Scholar] [CrossRef]
  36. Dufo-López, R.; Lujano-Rojas, J.M.; Bernal-Agustín, J.L. Optimisation of size and control strategy in utility-scale green hydrogen production systems. Int. J. Hydrogen Energy 2023, 50, 292–309. [Google Scholar] [CrossRef]
  37. Rifkin, J. The Green New Deal: Why the Fossil Fuel Civilization Will Collapse by 2028, and the Bold Economic Plan to Save Life on Earth; St. Martin’s Press: New York, NY, USA, 2019. [Google Scholar]
  38. European Commission. Interactive Maps. 2023. Available online: https://re.jrc.ec.europa.eu/pvg_tools/en/ (accessed on 13 May 2023).
  39. Staffell, I.; Pfenninger, S. Renewables. Ninja. 2020. Available online: https://Www.Renewables.Ninja/ (accessed on 20 March 2023).
  40. National Aeronautics and Space Administration. NASA POWER Prediction of Worldwide Energy Resources. 2023. Available online: https://Power.Larc.Nasa.Gov/ (accessed on 13 May 2023).
  41. Durusoy, B.; Ozden, T.; Akinoglu, B.G. Solar irradiation on the rear surface of bifacial solar modules: A modeling approach. Sci. Rep. Nat. 2020, 10, 1–10. [Google Scholar] [CrossRef]
  42. Hollinger, R.; Diazgranados, L.M.; Braam, F.; Erge, T.; Bopp, G.; Engel, B. Distributed solar battery systems providing primary control reserve. IET Renew. Power Gener. 2016, 10, 63–70. [Google Scholar] [CrossRef]
  43. Armand, M.; Axmann, P.; Bresser, D.; Copley, M.; Edström, K.; Ekberg, C.; Guyomard, D.; Lestriez, B.; Novák, P.; Petranikova, M.; et al. Lithium-ion batteries—Current state of the art and anticipated developments. J. Power Sources 2020, 479, 228708. [Google Scholar] [CrossRef]
  44. Naumann, M.; Spingler, F.; Jossen, A. Analysis and modeling of cycle aging of a commercial LiFePO4/graphite cell. J. Power Sources 2020, 451, 227666. [Google Scholar] [CrossRef]
  45. Naumann, M.; Schimpe, M.; Keil, P.; Hesse, H.C.; Jossen, A. Analysis and modeling of calendar aging of a commercial LiFePO4/graphite cell. J. Energy Storage 2018, 17, 153–169. [Google Scholar] [CrossRef]
  46. Thiesen, H.; Arne, G.; Jauch, C. Grid Frequency Data—Wind Energy Technology Instiute (WETI); Flensburg University of Applied Sciences: Flensburg, Germany, 2022. [Google Scholar] [CrossRef]
  47. Regelleistung.net. Datencenter. 2024. Available online: https://www.regelleistung.net/apps/datacenter/tendering-files/?productTypes=FCR&markets=CAPACITY&fileTypes=RESULTS&dateRange=2024-01,2024-04 (accessed on 15 June 2024).
  48. Ramasamy, V.; Zuboy, J.; Woodhouse, M.; O’Shaughnessy, E.; Feldman, D.; Desai, J.; Walker, A.; Margolis, R.; Basore, P. U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, with Minimum Sustainable Price Analysis: Q1 2023; National Renewable Energy Laboratory (NREL): Golden, CO, USA, 2024. [CrossRef]
  49. U.S. Department of Energy. Battery Storage in the United States: An Update on Market Trends; U.S. Department of Energy: Washington, DC, USA, 2021; 37p.
  50. Fraunhofer Institute for Solar Energy Systems. Photovoltaics Report. 2014. Available online: https://www.ise.fraunhofer.de/en/publications/studies/photovoltaics-report.html (accessed on 17 June 2024).
  51. EcoWatch, Bifacial Solar Panels. 2023. Available online: https://www.ecowatch.com/solar/bifacial-solar-panels (accessed on 13 May 2023).
  52. Bolinger, M.; Seel, J.; Warner, C.; Robson, D. Utility-Scale Solar, 2022 Edition Utility-Scale Solar; Energy Markets and Policy Department, Energy Analysis and Environmental Impacts Division: Berkeley, CA, USA, 2022.
  53. Asian Development Bank. Handbook on Battery Energy Storage; Asian Development Bank: Mandaluyong, Philippines, 2018. [Google Scholar]
  54. NREL. Utility-Scale Battery Storage. Available online: https://atb.nrel.gov/electricity/2022/utility-scale_battery_storage (accessed on 3 November 2024).
  55. Engels, J.; Claessens, B.; Deconinck, G. Techno-economic analysis and optimal control of battery storage for frequency control services, applied to the German market. Appl. Energy 2019, 242, 1036–1049. [Google Scholar] [CrossRef]
  56. European Central Bank. Economic Bulletin Issue 2, 2024; European Central Bank: Frankfurt, Germany, 2024. [Google Scholar]
  57. Deutsche Bundesbank. Monthly Report March 2024; Deutsche Bundesbank: Frankfurt, Germany, 2024. [Google Scholar]
  58. Ember. European Wholesale Electricity Price Data; Ember: London, UK, 2024. [Google Scholar]
  59. Crawford, A.J.; Wu, D.; Viswanathan, V.V.; Balducci, P.J. Washington Clean Energy Fund: Energy Storage System Consolidated Performance Test Results. 2020. Available online: https://www.osti.gov/servlets/purl/1602252 (accessed on 21 March 2024).
  60. NREL. Land Use by System Technology. Available online: https://www.nrel.gov/analysis (accessed on 12 September 2023).
  61. NREL. Lifetime of PV Panels. Available online: https://www.nrel.gov/state-local-tribal/blog/posts/stat-faqs-part2-lifetime-of-pv-panels.html (accessed on 15 March 2023).
  62. Bernal-Agustín, J.L.; Dufo-López, R. Efficient design of hybrid renewable energy systems using evolutionary algorithms. Energy Convers. Manag. 2009, 50, 479–489. [Google Scholar] [CrossRef]
  63. Koleva, M.; Shi, Y.; McKenna, K.; Craig, M.; Nagarajan, A. Optimal Strategies for Hybrid Battery-Storage Systems Design. Energy Technol. 2023, 11, 2300115. [Google Scholar] [CrossRef]
  64. Itani, K.; De Bernardinis, A. Review on New-Generation Batteries Technologies: Trends and Future Directions. Energies 2023, 16, 7530. [Google Scholar] [CrossRef]
  65. Nekahi, A.; Dorri, M.; Rezaei, M.; Bouguern, M.D.; Reddy, A.K.M.R.; Li, X.; Deng, S.; Zaghib, K. Comparative Issues of Metal-Ion Batteries toward Sustainable Energy Storage: Lithium vs. Sodium. Batteries 2024, 10, 279. [Google Scholar] [CrossRef]
  66. Papazoglou, G.; Biskas, P. Review and Comparison of Genetic Algorithm and Particle Swarm Optimization in the Optimal Power Flow Problem. Energies 2023, 16, 1152. [Google Scholar] [CrossRef]
Figure 1. AC- and DC-coupled PV-plus-battery system (efficiencies defined in Section 2.4).
Figure 1. AC- and DC-coupled PV-plus-battery system (efficiencies defined in Section 2.4).
Batteries 10 00427 g001
Figure 2. Vector of variables representing individuals in main GA.
Figure 2. Vector of variables representing individuals in main GA.
Batteries 10 00427 g002
Figure 3. Vector of variables for control strategy in secondary GA.
Figure 3. Vector of variables for control strategy in secondary GA.
Batteries 10 00427 g003
Figure 4. Flowchart to determine arbitrage or FCR at the beginning of each service period.
Figure 4. Flowchart to determine arbitrage or FCR at the beginning of each service period.
Batteries 10 00427 g004
Figure 5. GA flowchart.
Figure 5. GA flowchart.
Batteries 10 00427 g005
Figure 6. Battery capacity bands for arbitrage and FCR.
Figure 6. Battery capacity bands for arbitrage and FCR.
Batteries 10 00427 g006
Figure 7. Hourly irradiance (front) (kW/m2) near Wiesenthal for 2020 and horizontal axis tracking.
Figure 7. Hourly irradiance (front) (kW/m2) near Wiesenthal for 2020 and horizontal axis tracking.
Batteries 10 00427 g007
Figure 8. Hourly irradiance (front) (kW/m2) near Wiesenthal; detail is for nine days (March–April 2020) and horizontal axis tracking.
Figure 8. Hourly irradiance (front) (kW/m2) near Wiesenthal; detail is for nine days (March–April 2020) and horizontal axis tracking.
Batteries 10 00427 g008
Figure 9. Ambient temperature (°C) near Wiesenthal for 2020.
Figure 9. Ambient temperature (°C) near Wiesenthal for 2020.
Batteries 10 00427 g009
Figure 10. Annual irradiation over average (%) for the 25 years of the simulation.
Figure 10. Annual irradiation over average (%) for the 25 years of the simulation.
Batteries 10 00427 g010
Figure 11. Frequency of the first week of July.
Figure 11. Frequency of the first week of July.
Batteries 10 00427 g011
Figure 12. FCR prices of the first week of July.
Figure 12. FCR prices of the first week of July.
Batteries 10 00427 g012
Figure 13. Hourly electricity selling and purchasing price of the first year.
Figure 13. Hourly electricity selling and purchasing price of the first year.
Batteries 10 00427 g013
Figure 14. Daily average hourly electricity selling price compared to the first year. Each color represents a different year.
Figure 14. Daily average hourly electricity selling price compared to the first year. Each color represents a different year.
Batteries 10 00427 g014
Figure 15. Inverter efficiency.
Figure 15. Inverter efficiency.
Batteries 10 00427 g015
Figure 16. Optimal AC-coupled system, simulation for two consecutive days.
Figure 16. Optimal AC-coupled system, simulation for two consecutive days.
Batteries 10 00427 g016
Figure 17. Optimal DC-coupled system, simulation for two consecutive days.
Figure 17. Optimal DC-coupled system, simulation for two consecutive days.
Batteries 10 00427 g017
Figure 18. Evolution of the GA and the PSO optimisations in AC-coupled system.
Figure 18. Evolution of the GA and the PSO optimisations in AC-coupled system.
Batteries 10 00427 g018
Table 1. Data of the base case.
Table 1. Data of the base case.
VariableValueVariableValue
Location50.70° N, 10.18° EInverter-charger:
Resource dataPVGISCAPEX160 EUR/kW
L i f e S 25 years P i n v _ I C = P c h _ I C 40 MW to 100 MW
P m a x   _ g r i d 100 MW L i f e I C 10 years
I 7% η i n v _ I C Figure 13 [8]
I n f 2% η c h _ I C 0.97 [8]
I n f P r E 1% η D C D C 0.982 [8]
PV (mono./bif.): Li-ion LFP Battery:
AC coup. CAPEX0.54/0.5 EUR/WdcCAPEX295 EUR/kWh
DC coup. CAPEX0.5/0.46 EUR/WdcOPEX1% of CAPEX
OPEX1% of CAPEXCost escalation−4%/year
P N 80 to 160 MW C n 160 MWh to 320 MWh
f r e d _ P V   0.5% [61] F S O C _ m i n 10%
N O C T 43 °C F S O C _ m a x 90%
f P V _ l o s s   95% P m a x _ c h _ B = P m a x _ d i s c h _ B C n /4 (4 h duration)
α −0.4%/°C η c h _ B = η d i s c h _ B 0.9 · 100 %
β 0/0.7 f s e l f _ d i s c h 1%/month
ILR (AC coupled)1.25 Q l o s s _ m a x 20%
η i n v _ P V Figure 13 [8]Ageing model parameters[44,45]
Table 2. Optimal systems for the base case. Comparison to the system without storage (PV-only).
Table 2. Optimal systems for the base case. Comparison to the system without storage (PV-only).
PV-Plus-BatteryPV-Only
AC-CoupledDC-Coupled
PV (MWdc)140 (7 × 20 MWdc), bifacial140 (7 × 20 MWdc), bifacial160 (8 × 20 MWdc), bifacial
Battery (MWh)160 (4 × 40 MWh)160 (4 × 40 MWh)-
Battery max. power (MW)4040
Inverter-charger (MW)40100-
ILR1.25 (own inv.)1.41.25 (own inv.)
BIR10.4-
P r elec _ min _ disch (EUR/kWh)00-
P r elec _ max _ ch (EUR/kWh)0.3520.528-
S O C min _ arb (% of max.)2020-
S O C max _ arb (% of max.)4060-
NPV (MEUR)77.3560.28121.05 MEUR
CAPEX (Invest. cost) (MEUR)129.2133.286.4
Land use (ha)351.6351.6400
CF (%)21.2920.7222.63
IRR (%)12.910.1520.77
LCOE (EUR/kWh)0.060.0660.035
PV generation (GWh/year)189.2 (AC)199.61 (DC)216.24 (AC)
Batt. charge energy (GWh/year)7.929.61-
Batt. disch. energy (GWh/year)7.128.64-
Hours of bat. charge per year2725.62730.5-
Hours of bat. disch. per year2693.82714.9-
Battery lifetime (years)19.820.4 → 20-
Sold energy (GWh/year)186.46181.52198.22
Purchased energy (GWh/year)3.573.44-
Sell E. incomes (MEUR/year)13.4312.8614.38
Sell E. incomes, NPV (MER)202.70194.22219.75
FCR serv. inc. (MEUR/year)2.302.43-
FCR serv. inc., NPV (MEUR)34.7936.74-
Purch. E. cost (MEUR/year)0.320.31-
Purchase E. cost, NPV (MEUR)4.694.54-
Table 3. NPV variation over the base case (%) for cases of x_bool = 0, cases without FCR, and cases of 1 h FCR service.
Table 3. NPV variation over the base case (%) for cases of x_bool = 0, cases without FCR, and cases of 1 h FCR service.
AC-CoupledDC-Coupled
x bool = 0−20.2%−23.4%
No FCR−25.4%−44.8%
FCR service 1 h0.9%1.6%
Table 4. Battery lifetime (years) with or without FCR service.
Table 4. Battery lifetime (years) with or without FCR service.
AC-CoupledDC-Coupled
With FCR19.820.4 → 20
Without FCR2021.9 → 20
Table 5. NPV variation over the base case (%) for different electricity price annual inflation cases.
Table 5. NPV variation over the base case (%) for different electricity price annual inflation cases.
Electricity Price Inflation (%)AC-CoupledDC-Coupled
−2−93%−109%
−1−73%−87%
0−52%−61%
1−27%−36%
Table 6. NPV variation over the base case (%) for different cases of battery cost reduction.
Table 6. NPV variation over the base case (%) for different cases of battery cost reduction.
Battery Price Reduction (%)AC-CoupledDC-Coupled
25%20%23%
50%41%46%
75%61%70%
Table 7. NPV variation over the base case (%) for different cases of F PV and F wind factors.
Table 7. NPV variation over the base case (%) for different cases of F PV and F wind factors.
F PV   and   F wind AC-CoupledDC-CoupledPV-Only
0.25 and 0.127%35%19%
0.9 and 0.5−47%−73%−40%
1 and 0−6%−7%−39%
Table 8. Optimal systems for the system located in Spain.
Table 8. Optimal systems for the system located in Spain.
PV-Plus-BatteryPV-Only
AC-CoupledDC-Coupled
PV (MWdc)140 (7 × 20 MWdc), bifacial140 (7 × 20 MWdc), bifacial160 (8 × 20 MWdc), bifacial
Battery (MWh)160 (4 × 40 MWh)160 (4 × 40 MWh)-
Battery max. power (MW)4040
Inverter-charger (MW)40100-
ILR1.25 (own inv.)1.41.25 (own inv.)
BIR10.4-
Pr elec _ min _ disch  (EUR/kWh)0.1450.096-
Pr elec _ max _ ch  (EUR/kWh)0.2420.242-
SOC min _ arb  (% of max.)3040-
SOC min _ arb  (% of max.)6060-
NPV (MEUR)99.3677.02144.33
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Dufo-López, R.; Lujano-Rojas, J.M.; Artal-Sevil, J.S.; Bernal-Agustín, J.L. Optimising Grid-Connected PV-Battery Systems for Energy Arbitrage and Frequency Containment Reserve. Batteries 2024, 10, 427. https://doi.org/10.3390/batteries10120427

AMA Style

Dufo-López R, Lujano-Rojas JM, Artal-Sevil JS, Bernal-Agustín JL. Optimising Grid-Connected PV-Battery Systems for Energy Arbitrage and Frequency Containment Reserve. Batteries. 2024; 10(12):427. https://doi.org/10.3390/batteries10120427

Chicago/Turabian Style

Dufo-López, Rodolfo, Juan M. Lujano-Rojas, Jesús S. Artal-Sevil, and José L. Bernal-Agustín. 2024. "Optimising Grid-Connected PV-Battery Systems for Energy Arbitrage and Frequency Containment Reserve" Batteries 10, no. 12: 427. https://doi.org/10.3390/batteries10120427

APA Style

Dufo-López, R., Lujano-Rojas, J. M., Artal-Sevil, J. S., & Bernal-Agustín, J. L. (2024). Optimising Grid-Connected PV-Battery Systems for Energy Arbitrage and Frequency Containment Reserve. Batteries, 10(12), 427. https://doi.org/10.3390/batteries10120427

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop