1. Introduction
With the increase of customers’ requirements on power quality, power marketing has received more and more attention from power companies [
1,
2]. As a foundation of power marketing, energy metering provides basic data for accurate accounting of energy usage and energy revenue. Hence, the operation quality of the smart meters will have an important impact on the data quality, the application of electricity information acquisition system and the efficiency of power enterprises [
3,
4]. Therefore, it is of practical significance to study the assessment algorithm of operation quality for smart meters [
5,
6].
At present, there are several models and algorithms for comprehensively assessing the operation quality of smart meters produced by suppliers. These models and algorithms can be mainly divided into three types: The first is to evaluate the smart meters and the suppliers based on a certain index. The second is to propose multiple indexes of the smart meters from different aspects and then process data with the simple additive weighting (SAW) [
7] method to evaluate the equipment. However, different indexes have different impacts on the operation quality of smart meters, so the assessment results of such algorithms are inaccurate if the importance of indexes is not considered. The third is to apply the expert scoring algorithm [
8], analytic hierarchy process (AHP) [
9] and some other subjective weighting methods to determine the weight of each index directly, which considers the difference of indexes’ impacts on smart meters. However, the results are quite subjective due to the limitation of experts’ knowledge and experience [
10], which might lead to a large difference in the results of operation quality assessment of smart meters by different experts. Moreover, the quality assessment indexes of terminal meters for pre-operation quality, operation quality and maintenance are proposed and the quality assessment model for whole-life-cycle is presented based on entropy weight method and improved AHP in Reference [
11]. In Reference [
12], the hierarchical model and method of quality assessment for the whole-life-cycle of smart meters is proposed based on triangular fuzzy AHP and defect deduction method. In Reference [
8], the whole-life-cycle quality assessment model of smart meters is constructed and the quality assessment from the perspectives of different suppliers, models, batches and single ones are realized. In Reference [
13], an operation assessment method of electric energy metering device is proposed based on health index. In Reference [
14], the status assessment indexes and models for electricity gateway meters are studied. In Reference [
15], the demand analysis, technical architecture and development platform of the reliability prediction system of electricity meters based on cloud platform are introduced. In Reference [
16], quality assessment indexes such as positive difference rate, negative difference rate and zero difference rate of smart meters are presented, the measurement assessment system of smart meters is constructed and the real-time monitoring platform for smart meters are developed. The strengths and weaknesses of the aforementioned methods are summarized in
Table 1.
In summary, the current research on the quality assessment of smart meters is insufficient and there are fewer studies on the ranking of the suppliers from the operation quality of smart meters. Moreover, the current research is based on the hypothesis that the basic characteristics of smart meters can be acquired but actually, how to extract these basic characteristics is still an issue.
In order to monitor the states of power-consuming in time and accurately, a large number of smart meters have been installed at the user-side terminal, sending the metering and fault alarm data periodically to the metering control center. Because the production batch and installation area of the equipment are different and they have various models and interfaces, massive metering and fault alarm information would be continuously generated by smart meters [
11]. In addition, non-quality factors such as environmental noise and electromagnetic interference may also lead to problems such as bad data and null data. Therefore, using data analysis technology to cluster the collected raw data first will help improve the data quality of smart meters [
17,
18]. Data analysis technology has gradually been applied to the field of power systems, which mainly includes data processing and data analysis algorithms. So far, data analysis technology has been gradually utilized to evaluate the operation quality of smart meters comprehensively [
19]. Therefore, based on the statistical characteristics of the quality data of smart meters, this paper attempts to consider the probability of various fault alarm events produced by smart meters as the superposition of multiple Gaussian distributions. The Gaussian mixture model (GMM) [
20,
21] clustering algorithm is applied to discover the internal correlation among the fault alarm data and to extract the typical indexes that characterize the operation quality of the smart meters, thereby to reduce the storage scale and calculation complexity of the comprehensive assessment model of smart meters.
The motivations of this work are summarized as follows:
The operation quality of the smart meters will influence the metering accuracy greatly, so it is of significant to assess the quality of smart meters comprehensively.
Although there is some research about the assessment of smart meters, they have disadvantages such as one-sidedness and subjective. Therefore, it is required to present a comprehensive assessment algorithm including multiply indexes and combined weight methods to assess the quality of smart meters.
There are massive data to be processed, therefore, it is necessary to utilize suitable clustering method (i.e., GMM clustering method in this work) to reduce the scale of data for further assessment.
Given this background, a GMM, combination weight model and revised TOPSIS (GCT)-based algorithm is proposed in this paper. First, seven indexes are defined to indicate the operation quality of the smart meters. The GMM clustering algorithm is used to extract the typical index data from the massive data of the smart meters. In order to determine the weights of the seven indexes more accurately, the combined optimization model is proposed based on AHP, the entropy weight method, the correlation coefficient method and the variation coefficient method. Then, with the revised TOPSIS, the operation quality of smart meters can be assessed comprehensively and sorted. Finally, the data of smart meters from the power utility company of a district in Ningbo city, Zhejiang Province, China, are adopted to verify the proposed algorithm. The application of the proposed algorithm in the actual system of Zhejiang Province is also introduced briefly.
2. Index Mining of Operation Quality Assessment of Smart Meters Based on GMM Clustering Algorithm
The electricity information acquisition system, which is shown in
Figure 1, is deployed in most of power utilities in China. It can be seen from
Figure 1 that data of energy, instantaneous active power and reactive power, amplitude of three-phase or two-phase currents and voltages and total power factor are recorded by smart meters produced by various suppliers. Then, these data are transmitted to collectors with RS-485 protocol. Next, the collected data would be further concentrated into concentrators by programmable logic controller (PLC) with wireless network. Finally, all data would be transmitted to electricity information acquisition system through optical fiber, general packet radio service (GPRS), the 4th generation of mobile phone mobile communication technology standards (4G) and code division multiple access (CMDA) techniques.
With the enhancement of information technology, these data can be employed to improve the accuracy of analysis for operation state of smart meters. Therefore, these data are gradually utilized to evaluate the operation quality of smart meters. Hence, seven indexes, which can represent the operation quality of smart meters from different aspects, are respectively defined as follows.
When data are collected from the user-side by smart meters, bad data are generated due to factors such as abrupt change of current or voltage and electromagnetic interference. Therefore, before the data collected being delivered into the assessment system, the unavailable data should be eliminated first, leaving the available ones to perform the quality assessment. In fact, smart meters can only measure the power consumption accurately under normal conditions. If the change rates of current and voltage were too fast, then the data measured would be not accurate. Besides, smart meters are electronic device and the transmission process from meters to concentrator is based on wireless network, so the data measured would also be influenced if there were electrometric interference. All these phenomena would influence the accuracy of data measured by smart meters and the ability to defense this influence can be regarded as an index for assessing the quality of smart meters. The more the available data are, the better the quality of the smart meters will be. Therefore, the availability rate of data collection (ARDC) is defined as
where
Nsamp is the total number of sampling points,
Tsamp,i is the window length of the
ith sampling;
and
are respectively the total number of metering load data and the number of non-null load data.
{E, P, Q, V, I,
} denotes the data of energy, active power, reactive power, amplitude of voltage and current and power factor, respectively.
In actual operation, data may not be collected in a time period, which means that the data collection is incomplete. It will cause corresponding measurement errors generated by the metering system. The more completed the data collection is, the more accurate the measurement results of the smart meters will be. Therefore, the collection rate of power data (CRPD) is defined as
where
and
are respectively the number of data that should be collected theoretically and the number of data actually collected during the
ith sampling point.
Abnormal information is recorded by smart meters during operation. In fact, there are many abnormalities w.r.t. smart meters and they can be divided into three categories according to experts’ experiences—serious abnormalities (e.g., energy meter breakdown); general abnormalities (e.g., abnormal power fluctuations, current imbalance, etc.); minor abnormalities (e.g., constant magnetic field interference, load overcapacity, etc.). Therefore, the serious, general and minor abnormalities (SAs, GAs and MAs) are respectively defined as
where
Fser,i,
Fgen,i and
Fmin,i are, respectively, the number of SAs, GAs and MAs of the metering equipment during the
ith sampling point.
The time between failures of smart meters refers to the time that can run before the first fault occurs. It is an important index, which reflects the reliability of the smart meters. The longer the time between failures is, the higher the operational reliability of the smart meters will be. Therefore, the time between failures (TBF) is defined as
where
Nsamp,F is the first sampling point when
Fser,i +
Fgen,i +
Fmin,i0.
In actual operation, the smart meter may continue to operate after self-reset or overhaul after a fault occurs. However, during the time of failures, the smart meter stops working. The longer the time of failures is, the greater the measurement deviation is and the worse the quality in the comprehensive assessment will be. Therefore, the operating failure rate (OFR) is defined as
where
Trate and
TF are the rated running time and fault outage time of the metering equipment, respectively.
Because there are a large number of smart meters and their types are different [
18], the data of smart meters derived from the electricity information collection system cannot be applied to the operation quality assessment directly. Hence, the data clustering method is used to explore the typical characteristics of the operation quality of each supplier’s smart meters, so as to achieve a comprehensive assessment. In fact, the operation quality of smart meters is affected by many independent factors, such as the proficiency of workers in the production of the same batch, random errors in processing operations and the temperature, humidity and pollution levels of operating environment for the equipment. However, the impacts of these factors on the operation quality of the smart meters are not critical. According to the central limit theorem [
22], the sum of distribution of a large number of independent random variables approximates the Gaussian distribution, so it can be considered that the quality data of smart meters collected in the same batch conform to the Gaussian distribution.
For GMM, the Gaussian distribution probability density function is utilized to describe data. By this data analysis technology, data are projected onto multiple Gaussian models and the probability of the data on each Gaussian model is obtained. Then, the model with the highest probability is selected to decompose a large data set into several small data sets that conform to the Gaussian distribution [
20,
21]. Therefore, the Gaussian mixture model can be used for data clustering to extract typical features from a data set. As mentioned before, for
K batches of equipment under a smart meter supplier, the index data can be considered as a superposition of
K Gaussian distribution data sets. Therefore, the Gaussian mixture model clustering algorithm is more suitable for mining the index data of the operation quality of smart meters than other clustering algorithms that do not consider the data distribution characteristics.
Assuming that the GMM is a mixture of
K Gaussian distributions, each Gaussian distribution is called a “component.” The linear addition of these “components” is the probability density function of the GMM and is represented by
where
represents the weight of the
kth multidimensional single Gaussian distribution and
represents the probability density function of the
kth multidimensional single Gaussian distribution.
is an auxiliary vector where
xi represents a point for smart meter
i in the 7-dimensional coordinate system with its coordinates
are the indexes ARDC, CRPD, SAs, GAs, MAs and OFR defined in Equations (1)–(7). The practical meaning of
xi can be regarded as the representation for the quality of smart meter
i.
N is the total number of smart meters to be clustered;
is the expected vector of the
kth Gaussian model and
is the variance of the
kth Gaussian model, respectively.
In the GMM clustering process, the parameters of each Gaussian distribution model need to be estimated and the estimation is performed by the expectation maximum (EM) algorithm [
23]. Therefore, the steps of the GMM clustering algorithm for operation quality of smart meters’ data are as follows.
- (1)
Let
l = 0,
and
. Initiate the values of
and
randomly and find the initial posterior probability of the
ith sample point
xi belonging to the
kth Gaussian model, which is represented by
- (2)
Substitute the initial posterior probability obtained in step (1) into the maximum likelihood formula to obtain the GMM clustering parameters of the (
l + 1)th iteration and as follows.
- (3)
If
< 10−5, terminate the iteration, determine as the estimated GMM clustering parameter and continue to the next step. Otherwise, return to step (2);
- (4)
Obtain the probability of the
ith sample point
xi belonging to the
kth Gaussian model by using the following Bayesian probability formula.
According to the maximum Bayesian probability criterion, the
ith sample point
xi is assigned into the Gaussian model of which the probability is maximized. When all the sample points of one supplier are assigned into their respective Gaussian models following the above steps, the GMM clustering is completed and the corresponding
K cluster centers are obtained, that is,
K typical points that reflect the operation quality of the suppliers’ smart meters. The coordinates of these typical points are typical values of the seven indexes. By obtaining the geometric center of the typical points under the same supplier, a row of decision matrix for the operation quality assessment of smart meters can be formed. A complete decision matrix of operation quality for smart meters, which will be discussed in
Section 3, can be formed by determining the geometric centers of all suppliers.
Thus, the redundant and unimportant information in the original metric data of the operation quality assessment is discarded by the GMM clustering algorithm and the important data and typical characteristics of the original data are retained. Therefore, the GMM clustering algorithm greatly reduces the scale of the data and the calculation complexity of the comprehensive assessment of smart meters but brings about little influence on accuracy.
3. Combined Weight Optimization Model for Smart Meters
After the employment of the GMM clustering algorithm, seven typical operation quality indexes of the smart meters for each supplier can be obtained. These seven indexes characterize the operation quality of the smart meters from various aspects. In order to consider the impact of each index comprehensively on operation quality assessment, it is necessary to select an appropriate method to determine the importance (i.e., the weight) of each index. Weight determination methods commonly used include AHP which considers the subjective experience of experts [
24], the entropy weight method which considers the degree of data dispersion [
25,
26], the correlation coefficient method which considers the degree of data correlation [
27] and the variation coefficient method which considers the contrast strength of data [
28]. In order to consider the degree of data dispersion, correlation, contrast strength and subjective will of experts comprehensively, the combined indexes’ weights for operation quality of smart meters are proposed. In this section, the normalization processing that needs to be performed before weight determination is introduced first; then the above four weight determination methods are introduced; finally, the combined optimization model of the operation quality index of the smart meters is presented. In fact, the seven indexes defined in
Section 2 would not only be influenced by the quality of smart meters but also by many other factors such as quality of power distribution, failure or poor quality of other equipment and external environment. It is hard to completely discriminate among these factors to extract considerations regarding the quality of the smart meters only. This problem is an inherent defect of data-driven algorithms and this paper try to relive this problem by the combined weight optimization model. For instance, some indexes might be largely influenced by factors unrelated with the quality of smart meters, then these indexes can be given small weighs by experts in AHP weight method with their experiences.
Let
D = (
dij)
B × L be the decision matrix of the operation quality assessment problem for smart meters, where
B denotes the number of the suppliers of smart meters,
L denotes the number of the indexes and
dij denotes the
jth index value of the
ith smart meter supplier. Because different indexes have different units and the indexes can be divided into two types: Benefit type and cost type, it is not possible to directly compare the importance of each index. Therefore, they should be normalized by using Equations (15) and (16) to get a normalized decision matrix.
where
and
represent the minimum and maximum values of all smart meter suppliers on the index
j, respectively;
and
represent the sets of benefit indexes and cost indexes, respectively. In this paper,
= {1, 2, 6} and
= {3, 4, 5, 7}.
The AHP, which is a subjective weighting method, obtains the weight of each index by comparing the importance of two pairs of indexes [
24]. Let
L indexes be
U = {
u1,
u2, …,
uL} and use
aij from 1 to 9 to denote the ratio of importance between indexes
ui and
uj on the operation quality of smart meters. The larger the value is, the more important
ui compared with
uj is. In this way, a judgment matrix
A = (
aij)
L×L of the operation quality assessment problem of the smart meters can be obtained and the judgment matrix has the following properties:
aij > 0,
aji = 1/
aij, (
i = 1, 2, …,
L;
j = 1, 2, …,
L). Before determining the weight of each index, the consistency test is performed on the judgment matrix
A. If the consistency test fails, the values of
aij are contradictory and need to be re-assigned. If the test is passed, the values of
aij are consistent and the judgment matrix
A can be used for determining the indexes’ weights [
24] as
where
and
.
In informatics, entropy is used to characterize the degree of disorder of the system and the degree of dispersion of the data [
25,
26]. The larger the information entropy of the index is, the less information it provides in the comprehensive assessment and the smaller the corresponding weight should be. Conversely, the smaller the information entropy is, the larger the weight should be. Therefore, the entropy of the operation quality index of the smart meters is defined as
where
,
and
if
. Therefore, the entropy weight of the
jth operation quality index of smart meters is defined as
where
and
.
In statistics, the correlation coefficient is used to measure the correlation between two variables, including the Pearson correlation coefficient, Spearman correlation coefficient and Kendall correlation coefficient. The Pearson correlation coefficient is more suitable for data with Gaussian distribution. [
27], so Pearson correlation coefficient [
28] is utilized in this paper to detect the intrinsic correlation between indexes. The greater the degree of correlation is, the greater the repeatability of the information between the indexes is and the smaller the weight of the corresponding indexes should be; conversely, the smaller the correlation is, the greater the weight should be. Assuming that
=
and
=
respectively represent the
xth and
yth column vectors of the normalized decision matrix, the Pearson correlation coefficient between the
xth and
yth indexes is defined as
where
and
are the average values of
and
, respectively. Therefore, the weight based on correlation coefficients is defined as
where
and
.
The variation coefficient method is an objective weighting method that determines the weight of an index based on the strength of contrast among data [
29]. The greater the variation of an index is, the greater the contrast strength relative to other indexes is, the higher the importance of the assessment object in the comprehensive assessment is and thus the greater its weight should be. Conversely, the smaller the variation is, the smaller the weight should be. The variation coefficient of the index
uj is defined as
where
denotes the average value of the vector
. Therefore, the weight based on variation coefficient is defined as
where
and
.
Although the four subjective and objective methods are simple and easy to implement, they all have some deficiencies. Only the experiences of experts are considered by the subjective weighting method, which can easily lead to large subjective preferences. Only the actual data are employed in objective weighting method and there are inevitable errors in actual data, which may lead to the inconsistent assessment results in actual situation. In order to fully consider the subjective scoring based on expert experience and modify the weights according to the characteristics of the data themselves, a combined optimization model of index weight of operation quality for smart meters based on the weight membership degree is presented as
where
represents the combined weight of the
jth operation quality index to be optimized,
represents the weight of the
jth index obtained by the
kth method and
G represents the number of weight determination methods;
is the membership function of the representation and is represented by
It can be seen that the larger the is, the closer the and will be.
4. Comprehensive Operation Quality Assessment Algorithm of Smart Meters Based on Revised TOPSIS
Once the combined weight of each operation quality index is determined, the comprehensive operation quality assessment of the smart meters can be transformed into a multi-attribute decision making (MADM) problem [
30]. The revised TOPSIS, one of the MADM methods, measures the distance between the variables by their included angle. Besides, the assessed smart meters are sorted according to the closeness between them and the idealized target [
31]. Therefore, the process of comprehensive operation quality assessment of smart meters based on the revised TOPSIS is as follows.
Form the assessment matrix of
Q operation quality indexes corresponding to
B suppliers of smart meters
where
.
Determine the ideal point and negative ideal point in the operation quality assessment of the smart meters, which are respectively represented as
where
,
and
j = 1, 2, …,
L.
Obtain the angular distance between the operation quality indexes of each supplier and the ideal point/negative ideal point respectively, which are denoted as
where
=
denotes the
ith row vector of assessment matrix
R.
Determine the assessment values of the operation quality of smart meters as
It can be seen from Equations (30)–(32) that the better the operation quality of the smart meters produced by the ith supplier is, the closer the to 1 will be; conversely, the worse the operation quality is, the closer the to 0 will be. Therefore, the assessment result of the operation quality of the smart meters can be obtained according to the value of .
The overall process of the proposed GCT-based algorithm is shown in
Figure 2.
5. Case Studies
In order to verify the effectiveness of the proposed GCT-based algorithm, the data of smart meters from part of Ningbo power distribution systems, Zhejiang Province, China, are involved in this section for assessment. There are total 11,565 records in the original data set and 11,312 available records are retained after data pre-processing. The data are collected from smart meters produced by 17 suppliers (i.e., NB_1, NB_2, …, NB_17) that located in Ningbo city and these suppliers are to be assessed. There are several equipment batches for each supplier and 58 batches in total. In this section, the data analysis of the operation quality of smart meters based on GMM clustering algorithm is performed first. Then, the effectiveness of the operation quality assessment algorithm based on the combined weight optimization model and the revised TOPSIS is demonstrated. Next, the comparisons among the proposed GCT-based algorithm and the algorithms based on SAW and AHP are given. Finally, the application of the algorithm in the actual system is briefly introduced.
5.1. Comprehensive Assessment of the Operation Quality of Smart Meters Based on GCT Algorithm
The data of 17 suppliers and their 58 batches are renumbered sequentially and the effectiveness of data processing by using the GMM clustering algorithm is analyzed by taking the supplier NB_12 as an example. There are 6 batches under the supplier NB_12 with a total of 1514 smart meters, respectively. There are seven indexes for each smart meter and the standardized scatter diagram and GMM clustering result of the operation quality indexes from the supplier NB_12 are shown in
Figure 3. In
Figure 3, the x-axes denotes the seven clusters (i.e., indexes
,
, … and
); and the y-axes denotes the typical values of
,
, …,
for NB_12. Each line denotes a typical smart meter that represents this supplier. It can be seen from
Figure 3 that the operation quality data of the 1514 smart meters under the supplier NB_12 conform to the superposition of 6 multi-dimensional Gaussian distribution models. In other word, the quality of smart meters produced by supplier NB_12 can be represented by six typical smart meters. The typical values reflecting their seven indexes are shown in
Table 2.
By applying GMM clustering to each supplier, typical smart meters of the corresponding supplier can be obtained. As a result, the massive raw data of smart meters for operation quality assessment have been compressed and typical features retained. Then, the decision matrix
D′ can be determined and its entries standardized are shown in
Table 3 by gaining the geometric centers of the typical points.
The weights determined by the AHP algorithm are shown in
Table 4. In addition, the index weights based on the entropy weight, the correlation coefficient, the variation coefficient and the combined weight optimization model are also presented in
Table 4. It can be seen from
Table 4 that the objective weight plays a certain role in correcting the subjective weight. According to the expert’s experience, the SAs (i.e.,
) should be assigned with a large weight but the weights from the three other objective weighting methods are much smaller since the values of
from different suppliers in the original data are relatively close. Therefore, compared with other indexes, this index cannot significantly distinguish the operation quality of the smart meters from each supplier. Thus, it should be given a small weight.
Based on the combined weights, the assessment matrix
R of the operation quality is formed by using Equation (27). Then the operation quality of the smart meters is comprehensively assessed by the revised TOPSIS. Finally, the results of the comprehensive assessment for operation quality of smart meters are shown in
Table 5.
It can be seen from
Table 5 that the top 9 suppliers are as follows: NB_10, NB_9, NB_5, NB_7, NB_6, NB_13, NB_11, NB_16 and NB_4, of which the supplier NB_10 gets the highest score whereas the supplier NB_15 gets the lowest one. It can be seen from
Table 3 that TBF index and the SAs index of the supplier NB_10 are the largest ones among all the suppliers and the other five indexes of the supplier NB_10 are all ranked in top 3 among the 17 suppliers, so the equipment operation quality of the supplier NB_10 is the best. Although the supplier NB_15 has a relatively large value in the CRPD index, all the values of the remaining 6 indexes are small, especially the value of TBF index, which is 0.070 only. In the meantime, the combined weight of TBF index reaches 0.558, which is far more important than the other indexes. Therefore, it is reasonable to judge the equipment operation quality from the supplier NB_15 as the worst.
5.2. Comparisons with Existing Algorithms
In order to demonstrate the effectiveness of the proposed GCT-based algorithm, the results of the equipment operation quality assessment based on SAW, AHP and the proposed GCT-based algorithm are shown in
Table 6, respectively.
It can be seen from
Table 6 that the top 3 suppliers determined by the three algorithms are the same and the top 9 suppliers are nearly the same. Hence, the rationality of this GCT-based algorithm for assessing the comprehensive operation quality of smart meters is verified. In addition, it can be seen from
Table 5 that the worst two suppliers are NB_15 and NB_14 based on the proposed GCT-based algorithm. It can be seen from
Table 3 that the indexes’ values of supplier NB_14 are all small but relatively higher than supplier NB_15, so it is reasonable that supplier NB_14 ranks the last but one. The worst two suppliers of SAW-based and AHP-based algorithms are the suppliers NB_1 and NB_3. As can be seen from
Table 3, although the indexes of supplier NB_1 are all around or below the median, there are 5 indexes’ values of supplier NB_1 obviously higher than those of supplier NB_3, so it is unreasonable to judge the supplier NB_1 as the worst. As can be seen from
Table 5, the supplier NB_6 is ranked in the 4th, 10th and 5th position by the SAW-based, the AHP-based and the GCT-based algorithm, respectively. It can be seen from
Table 3 that the supplier NB_6 is superior to the supplier NB_12 in most indexes and supplier NB_12 is in the top 10 among the three algorithms, so the result obtained by the AHP-based is unreasonable.
In summary, the subjective and objective weights are comprehensively considered in the GCT-based algorithm proposed in this paper and the revised TOPSIS is utilized to perform assessments. Compared with the equipment operation quality assessment of SAW-based algorithm and the AHP-based algorithm, the top-ranked suppliers obtained by GCT-based algorithm is consistent with the results of the other two algorithms, which indicates the effectiveness of this algorithm. By analyzing the lower-ranked suppliers, the results of the proposed GCT-based algorithm are more reasonable than the results based on the other two algorithms. Therefore, the GCT-based algorithm proposed in this paper is more suitable for the operation quality assessment of smart meters.
5.3. Practical Application in Zhejiang Power Distribution Systems
After several tests in small-scale data sets, this assessment algorithm of equipment operation quality has been embedded in the electricity information acquisition system of State Grid Zhejiang Electric Power Company as a core algorithm and it has been in the trial operation since December 2017. In the system, the Ambari unified management tools and Hadoop cluster technology of the big data acquisition and computing platform are also utilized for comprehensive assessment. So far, there are more than 27.6 million records of smart meters (including 85 suppliers and 5684 batches) and 3.46 million records of collecting terminal (including 63 suppliers and 1324 batches) in Zhejiang power distribution systems. Based on these data, the suppliers are assessed and the results are also shown in
Figure 4. It can be seen from
Figure 4 that the top 10 supplier are listed as bar graph and the distribution of score intervals are shown with pie graph, respectively. During several months of trial operation of the system, the assessment results for operation quality of smart meters were accredited by experts and engineers from power utilities.
The novelties of the application of the proposed algorithm in Zhejiang power distribution systems are two-fold: (a) The proposed algorithm is relied on measured data rather than the one by one examination by maintenance personnel, which takes a step toward unmanned management. (b) In the past, the function of quality assessment for smart meters is always developed individually and it is the first time to embed this function into electricity information acquisition system. Therefore, it also takes a step toward unified system and unified management.