An Exploratory Economic Analysis of Underground Pumped-Storage Hydro Power Plants in Abandoned Deep Coal Mines
Next Article in Special Issue
Evolutionary Hybrid System for Energy Consumption Forecasting for Smart Meters
Previous Article in Journal
Functional Properties and Microbiological Stability of Fatty Acid Methyl Esters (FAME) under Different Storage Conditions
Previous Article in Special Issue
Replacement and Maintenance Decision Analysis for Hydraulic Machinery Facilities at Reservoirs under Imperfect Maintenance
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Optimal ESS Scheduling for Peak Shaving of Building Energy Using Accuracy-Enhanced Load Forecast

Department of Electrical and Information Engineering, Seoul National University of Science and Technology, Seoul 01811, Korea
*
Author to whom correspondence should be addressed.
Energies 2020, 13(21), 5633; https://doi.org/10.3390/en13215633
Submission received: 24 September 2020 / Revised: 23 October 2020 / Accepted: 23 October 2020 / Published: 28 October 2020
(This article belongs to the Special Issue Forecasting and Optimization of Energy Use in Buildings)

Abstract

:
This paper proposes an optimal Energy Storage System (ESS) scheduling algorithm Building Energy Management System (BEMS). In particular, the focus is placed on how to reduce the peak load using ESS and load forecast. To this end, first, an existing deep learning-based load forecast method is applied to a real building energy prediction and it is shown that the deep learning-based method leads to an accuracy-enhanced load forecast. Second, an optimization problem is formulated in order to devise an ESS scheduling. In the optimization problem, the objective function and constraints are defined such that the peak load is reduced; the cost for electricity is minimized; and the ESS’s lifetime is elongated considering the accuracy-enhanced load forecast, real-time electricity price, and the state-of-charge of the ESS. For the purpose of demonstrating the effectiveness of the proposed ESS scheduling method, it is implemented using a real building load power and temperature data. The simulation results show that the proposed method can reduce the peak load and results in smooth charging and discharging, which is important for the ESS lifetime.

1. Introduction

In a city, buildings are the main consumers of electric energy, and their impact on the entire utility grid in cities is fast growing due to an increasing number of buildings and extreme weather changes. Especially, the peak load of huge buildings has been increasing. To supply the load demand even for the peak load, inevitably, the number of power plants needs to be increased, which is not only expensive, but also not good for global warming and CO2 emission [1]. Therefore, many research efforts have been devoted to reducing the peak load without constructing additional power plants.
The Energy Storage System (ESS) is one of the most popular approaches for such peak shaving by moving the peak load to other times during a day [2,3,4]. As the ESS is expensive, it is important to compute the optimal capacity for a given purpose and to devise a charging and discharging scheme considering both the cost and the ESS’s lifetime [5,6]. Recently, research interests are directed to Building Energy Management System (BEMS) or Home Energy Management System (HEMS) that propose ESS scheduling methods in order to decrease the cost for electricity in terms of consumers. Their primary objective is to make a scheduling scheme to charge the ESS during the off-peak time and discharge it during the on-peak time [7,8].
In order to design an optimal ESS scheduling, it is indispensable to have a load forecast method with high accuracy as charging and discharging ESS efficiently according to the load forecast with good accuracy can reduce the peak load and result in cost reduction [9,10,11,12]. Moreover, it is well known that the load power of a building is affected by the outdoor temperature as the use of air conditioning or heating systems can change greatly depending on the outdoor temperature. This means that the accuracy of the load forecast can be improved if better temperature information in terms of accuracy is available. Therefore, forecasting load power and temperature simultaneously for better ESS scheduling or using a method to use temperature information efficiently for load forecast is required. Due to the advances of deep learning, deep learning-based load forecast methods have been drawing attention [13,14]. In addition to the conventional neural network, Recurrent Neural Network (RNN) having feedback structures has been popularly used for the load and temperature forecast as the load demand and temperature during a day can be viewed as a time series which is repeated every day. As the RNN shows weak long-term dependency of the past data owing to its structure, Long Short-Term Memory (LSTM) has been developed and it is also widely used to predict load demand [15,16,17,18,19]. In this paper, both LSTM and Multi-Layer Perceptron (MLP) are used for load and temperature forecasts.
Day-ahead ESS scheduling is heavily dependent on load forecast [20]. Consequently, if the load forecast is not accurate enough, the performance of the ESS scheduling can be poor, which can result in non-trivial cost loss. Therefore, existing results in the literature focus on how to enhance the accuracy of the load forecast and use the load forecast in the ESS scheduling together with various real-time information [21,22]. As the outdoor temperature is the most influential element on the load power, better information on the outdoor temperature can improve the performance of ESS scheduling [15,16,17].
Along this line of research, this paper presents an optimal ESS scheduling method based on the load forecast generated by dual deep learning-based method in which the real-time outdoor temperature information is used to enhance the accuracy of the forecast. The contribution of the paper is threefold: First, it is shown that the recently proposed dual deep learning-based load forecast enhances forecast accuracy when it is applied to real building energy and temperature data. Second, an optimal ESS scheduling based on the accuracy-enhanced load forecast is proposed for peak shaving of building energy. Third, it is demonstrated using real building energy and its outdoor temperature data that the proposed ESS scheduling not only reduces the cost for electricity by achieving better peak shaving, but also takes the ESS’s lifetime into account.
As depicted in Figure 1, this paper consists mainly of two parts: load forecast and ESS scheduling. In Section 2, the load forecast using the past load power and outdoor temperature data is described. In addition, it is presented how to enhance the forecast accuracy using the real-time outdoor temperature. Then, based on the load forecast, the proposed ESS scheduling is presented in Section 3. Finally, the performance of the proposed ESS scheduling is validated using the real building data in Section 4.

2. Building Load Forecast Using Real-Time Temperature Information

This section introduces how to predict the building load using the dual deep learning-based load forecast method proposed in [19]. The forecasting method in [19] is based mainly on two deep learning networks: LSTM and MLP. LSTM forecasts both building load and outdoor temperature for the next 24 h using past load and temperature data, and MLP compensates the load forecast for the next 16 h using the real-time temperature information for 8 h from when the load forecast by LSTM is made. The entire forecasting procedure is described in Figure 2. The trained LSTM is used to generate the load ( P ^ ) and temperature ( T ^ ) prediction using the past load P and temperature T. Then, the temperature prediction error Δ T is calculated using real-time temperature information T real - time . The trained MLP computes the expected load power variation Δ P ^ induced by Δ T . Finally, the compensated load power forecast P ^ comp is made by adding Δ P ^ to P ^ . In the next subsection, each network is briefly explained.

2.1. Load Demand Forecast Using LSTM

In this paper, LSTM is adopted to predict the building load as the load can be viewed as time-series data. A common LSTM is comprised of a hidden layer called a memory cell and three gates layer controlling the input–output behavior of the memory cell [23]. The three gates consist of one forget gate, one input gate, and one output gate, which are described in (1)–(3), respectively. Each gate has a sigmoid function σ ( · ) for the activation function, where h t 1 denotes the output of the hidden layer in the previous time step; x t is the input vector; W x and W h are weights for x t and h t 1 , respectively; and b is the bias. Equation (4) computes a candidate of the memory cell for the current time stamp t. From (5), the memory cell is calculated by considering its candidate value (i.e., i t C ˜ t ) and forgetting value in the previous time stamp (i.e., f t C t 1 ). Last, the cell state is passed through an activation function as the hidden layer’s output, as shown in Equation (6).
f t = σ ( W x f x t + W h f h t 1 + b f )
i t = σ ( W x i x t + W h i h t 1 + b i )
o t = σ ( W x o x t + W h o h t 1 + b o )
C ˜ t = tanh ( W x c x t + W h c h t 1 + b c )
C t = f t C t 1 + i t C ˜ t
h t = o t tanh ( C t )
In this work, LSTM is trained using past building load and temperature data such that it predicts both the load and temperature for the next 24 h when the past 24 h load and temperature are given. Figure 3 describes this, and the input and output data of the LSTM are given in the form of Equations (7)–(10), where the data are sampled at every hour, and T and P denote the normalized temperature and power, respectively. Note that the outdoor temperature is the most influential nature parameter on the load power. This is why the past temperature is another input to the LSTM together with the past load power.
T = { T t 24 , , T t 2 , T t 1 } Past temperature data , LSTM input
P = { P t 24 , , P t 2 , P t 1 } Past load data , LSTM input
T ¯ = { T t , , T t + 22 , T t + 23 } Temperature data , LSTM output
P ¯ = { P t , , P t + 22 , P t + 23 } Load data , LSTM output
where T and P are the true data for the input of the LSTM, and T ¯ and P ¯ are the true data for the output of the LSTM. As depicted in Figure 3, once the LSTM is trained using past data, the load and temperature forecast ( P ^ , T ^ ) for 24 time points (i.e., 00:00, 01:00, ⋯, 23:00) of the next day are made at 23:00 at every day.

2.2. Forecast Compensation Using Real-Time Temperature Data

As the building load is heavily dependent on the temperature, it is better to use the real-time temperature for enhancing the accuracy of the load forecast if possible. To this end, the temperate is measured from 00:00 to 07:00 and let us denote the measured temperature by T [ 0 , 7 ] . From 00:00 to 07:00, the load power is similar to the past load data since there are rare people in the building at that time. However, if the temperature is quite different from the past data during the time, the load forecast must be corrected considering the temperature variation. In other words, the load variation Δ P [ 8 , 23 ] can be inferred using the temperature difference Δ T [ 0 , 7 ] = : T [ 0 , 7 ] T ^ [ 0 , 7 ] and MLP. For the sake of correcting the load forecast, an MLP can be designed such that it approximates the following input–output relation (i.e., labeled data for supervised learning).
Δ T [ 0 , 7 ] = { T t T ^ t , , T t + 7 T ^ t + 7 } MLP input ,
Δ P [ 8 , 23 ] = { P t + 8 P ^ t + 8 , , P t + 23 P ^ t + 23 } MLP output
To be specific, in order to train the MLP [24] generating prediction Δ P ^ [ 8 , 23 ] , the training data ( Δ T [ 0 , 7 ] , Δ P [ 8 , 23 ] ) is made using P ^ and T ^ by LSTM. With the trained MLP and the measured temperature Δ T [ 0 , 7 ] , Δ P ^ [ 8 , 23 ] is generated, which is added to the P ^ [ 8 , 23 ] made by LSTM in order to compensate the accuracy due to the temperature variation. As Δ T [ 0 , 7 ] can be interpreted as real-time temperature data, this is how the real-time information can be used for the building load forecast. Figure 4 depicts such a prediction.
Therefore, when the temperature is measured over [00:00,07:00], the load forecast is compensated as follows.
Resulting load forecast : P ^ comp = P ^ [ 8 , 23 ] + Δ P ^ [ 8 , 23 ]
Figure 5 summarizes the proposed compensation procedure using the trained LSTM and MLP.

3. Optimal ESS Scheduling for Peak Shaving

This section presents the two-step ESS scheduling scheme for peak shaving of building energy using the accuracy-enhanced load forecast in the previous section. First, a day-ahead ESS schedule is made at midnight using P ^ for the next 24 h [00:00, 23:00]. Second, ESS rescheduling for the next 16 h [08:00, 23:00] is made at 8 AM when P ^ comp is computed. Figure 6 shows when the scheduling and rescheduling are performed using which load forecast information. As shown in Figure 7, the BEMS determines the amount of charging and discharging of the ESS for a day in order to reduce the peak load using the information on the electricity price, the state of the charge of the ESS, and the load forecast. The proposed ESS scheduling method aims to decrease load peak during the day, thereby reducing electricity price to pay, and also consider ESS lifetime.

3.1. Day-Ahead ESS Scheduling

When P ^ is generated in the load forecasting, the first step of the ESS scheduling is performed by solving the following optimization problem,
min P ess ( t ) t { 0 , , 23 } t = 0 23 w 1 c ( t ) P s h a v e ( t ) + P e s s ( t ) + w 2 S o C ( t ) S o C ( t 1 ) 2 + w 3 P ^ g r i d ( t ) P p e a k 2 + w 4 P e s s ( t ) P e s s ( t 1 ) 2 subject to t { 0 , 1 , , 23 }
P ^ grid ( t ) = P ^ ( t ) + P ess ( t )
P ^ grid ( t ) 0
P shave ( t ) = P ^ ( t ) P peak , P ^ ( t ) P peak , 0 , P ^ ( t ) < P peak ,
P shave ( t ) + P ess ( t ) 0
S o C ( t ) = S o C ( t 1 ) + η E c P ess ( t )
P m a x P ess ( t ) P m a x
S o C m i n S o C ( t ) S o C m a x
| t = 0 23 P ess ( t ) | α
where w 1 , w 2 , w 3 , w 4 are constant weights, P ess ( t ) denotes the amount of charging and discharging from the ESS, c ( t ) is time-varying electricity price, and P shave ( t ) is the load power in between the load forecast and P peak . Here, P peak is a tuning parameter and denotes the desired peak load. Therefore, the load power higher than P peak has to be provided by the ESS for peak shaving. P shave ( t ) implies the shaved load power by the ESS. This is modeled by the first term P shave ( t ) + P ess ( t ) in the objective function, see Figure 8. Besides, S o C ( t ) denotes the state of charge of the ESS, P ^ grid ( t ) is the estimated amount of electricity purchasing from the utility grid in the proposed scheduling, P m a x is the maximum output of the ESS, and S o C m i n and S o C m a x are the minimum and maximum of S o C ( t ) . E c denotes the capacity of the ESS and η efficiency of charging and discharging. In Equation (22), α is a small constant.
The objective function in (14) consists of four parts. The first term represents the cost of ESS scheduling. To be specific, the scheduling algorithm determines P ess ( t ) considering c ( t ) and P shave ( t ) such that the corresponding cost for the peak shaving becomes as cheap as possible.Consequently, the first term makes the ESS charge when the electricity price is cheap and discharge when it is expensive such as during the on-peak time. The second term makes the ESS used as small as possible. The third term tries to achieve peak shaving as much as possible. Note that reducing the size of P ^ grid ( t ) P peak by discharging means increasing the amount of the peak shaving. The fourth term prevents P ess ( t ) from rapidly changing. Therefore, the first and third terms consider the peak load shaving, and the second and last terms take the ESS’s lifetime into account.
Equations (15)–(22) represent constraints modeling various situations in the ESS scheduling. Equation (15) denotes the estimated amount of provided electricity from the utility grid, and P ess ( t ) 0 implies charging and P ess ( t ) < 0 implies discharging in this paper. Equation (16) is a natural constraint on the positiveness of the provided electricity from the utility grid. Constraints (17) means that load only higher than P peak is shaved by the ESS, which means that the ESS provides electricity only when P ^ [ 0 , 23 ] ( t ) P peak , as shown in Figure 8. Equation (18) implies that P ess ( t ) can not shave (i.e., discharge) more than P shave ( t ) . Moreover, constraint (18) implies that P ess ( t ) is affected by P peak owing to the definition of P shave ( t ) . Equation (19) shows how S o C ( t ) evolves according to the charging or discharging where Equations (20) and (21) are the upper and lower bounds of charging and discharging, and S o C ( t ) . Equation (22) makes S o C ( t ) of the ESS at 23:00 similar every day in order to make the ESS be ready for the next day since the sum of the amount of charging and discharging is equal to almost zero (i.e., α ). Notice that the third term in the objective function makes the ESS charge after the on-peak time but the ESS also has to satisfy constraint (22). In such an optimization based decision making, recursive feasibility is important. Note that the optimization problem (14) is always feasible as P ^ grid ( t ) is not bounded above.
As seen in the optimization (14), the performance of the scheduling is heavily dependent on the accuracy of the load forecast P ^ ( t ) . Therefore, if it is allowed to use the load forecast with better accuracy, it is also possible to obtain better performance of ESS scheduling, i.e., better peak shaving. In the next section, it is shown how the accuracy-enhanced load forecast is used in the ESS rescheduling.

3.2. ESS Rescheduling Using Accuracy-Enhanced Load Forecast

When P ^ comp ( t ) (i.e., compensated P ^ [ 8 , 23 ] ) is computed as explained in the previous section, ESS charging and discharging can be rescheduled using P ^ comp ( t ) for the rest of the day, i.e., from 08:00 to 23:00. The optimization problem for ESS rescheduling is given by
min P ess ( t ) t { 8 , , 23 } t = 8 23 w 1 c ( t ) P s h a v e ( t ) + P e s s ( t ) + w 2 S o C ( t ) S o C ( t 1 ) 2 + w 3 P ^ g r i d ( t ) P p e a k 2 + w 4 P e s s ( t ) P e s s ( t 1 ) 2 , subjectto t { 8 , 9 , , 23 }
P ^ grid ( t ) = P ^ c o m p ( t ) + P ess ( t ) ,
P ^ grid ( t ) 0 ,
P shave ( t ) = P ^ c o m p ( t ) P peak , P ^ c o m p ( t ) P peak , 0 , P ^ c o m p ( t ) < P peak ,
P shave ( t ) + P ess ( t ) 0
S o C ( t ) = S o C ( t 1 ) + η E c P ess ( t ) ,
P m a x P ess ( t ) P m a x ,
S o C m i n S o C ( t ) S o C m a x ,
| k = 0 7 P ess ( k ) + t = 8 23 P ess ( t ) | α .
Note that, in (23), the same variable names are used as in (14) for only notational simplicity. Compared with (14), the main difference is P ^ comp ( t ) in (26) instead of P ^ ( t ) . All the others are exactly the same as (14). Because the accuracy of P ^ comp ( t ) is better than P ^ [ 8 , 23 ] ( t ) , the performance of peak shaving can be improved since the scheduler tries to charge or discharge better in advance in order to handle the peak load more efficiently using the accuracy-enhanced load forecast P ^ comp ( t ) .
In the next section, the proposed ESS scheduling is implemented using real building load and temperature data. It is shown that the ESS scheduling with the accuracy-enhanced load forecast indeed leads to better peak shaving.

4. Case Study

In this section, the previously presented load forecast and ESS scheduling are implemented using real building load data and it is shown that the proposed method leads to lower cost by doing peak shaving better.

4.1. Load Demand Forecast

For the purpose of training the LSTM and MLP network, energy and temperature data from the real building obtained from the work in [25] are used. The building is located at Richland, WA and the consumed electric power and temperature outside the building are measured at every hour of weekdays from 2009 to 2011. Especially, summer data from June to September is used. For example, Figure 9 depicts the consumed power and temperature for every July from 2009 to 2011. In other words, daily data of the load power and outdoor temperature are overlapped for July of 2009 to 2011. In view of Figure 9, the outdoor temperature and load power show synchronous behavior, which confirms the underlining assumption that the outdoor temperature is the most influential on the load power.
For the LSTM, data from 2009 is used for training and data from 2010 for testing. The LSTM and MLP parameters are given in Table 1 and these parameters are chosen by trial and error considering the performance of the forecast. The training is implemented using Tensorflow 2.0 in Intel(R) Core(TM) i7-4790 with 8GB memory [26].
The trained LSTM is tested using the data from 86 weekdays of 2010. Among the testing result (i.e., forecast), the forecast for five consecutive days is shown in Figure 10 in which the upper panel is about load demand and the lower panel the temperature. Figure 10 demonstrates that the load and temperature forecast are similar to their real values but there are nontrivial errors. In view of the relation between real data and forecast in Figure 10, two observations can be made. First, the load power (i.e., consumed electric power) relies heavily on the temperature. Although it is well-known and natural, it can be verified from data and prediction. This again means that the better temperature information can bring about better load forecast. Second, Δ T : = T T ^ > 0 is obtained in the third and fifth days and Δ T < 0 in the other days. When Δ T > 0 , the corresponding Δ P : = P P ^ is high. On the other hand, when Δ T < 0 , the corresponding Δ P is small. Such a relation is also observed in the temperature and load forecast for most 86 days. This can be interpreted as more energy is consumed when the true temperature is higher than the forecast (i.e., expected temperature). However, when the true temperature is lower than the forecast, energy consumption is similar to the past consumption.

4.2. Compensating Load Forecast

In order to compensate the load forecast, the MLP presented in the previous section is trained. For training data of the MLP, Δ T [ 0 , 7 ] and Δ P [ 8 , 23 ] are computed using Equations (11) and (12) based on the data from 2010 and they are shown in Figure 11. Δ T [ 0 , 7 ] denotes the temperature deviation from 00:00 to 07:00 and Δ P [ 8 , 23 ] represents the load power deviation from 08:00 to 23:00.
In Figure 11b, Δ P [ 8 , 23 ] after 18:00 is quite small as the dependency between load and temperature is weak during that time period. Note that the building under consideration is a commercial building and there are rare people in the building after 18:00. The parameters of the MLP are shown in Table 1. The testing result with arbitrary value of Δ T [ 0 , 7 ] is shown in Figure 12a,b. In light of Figure 12a,b, it can be shown that reasonable Δ P ^ [ 8 , 23 ] is generated according to positive and negative Δ T [ 0 , 7 ] . These testing results are consistent with the observation made in Figure 10 in the sense that Δ T > 0 leads to relatively high Δ P and Δ T < 0 results in negligible Δ P . To see the compensation performance, the data from 2011 is used. First, the trained LSTM generates the load forecast P ^ for 2011. Second, the compensation Δ P ^ [ 8 , 23 ] made by the MLP is added to P ^ over the time interval [ 8 , 23 ] in accordance with Equation (13). By doing this repeatedly, P ^ c o m p is generated for 85 days and the forecast pattern and accuracy are similar for 85 days. The forecast of 5 days out of them is depicted in Figure 13.
Figure 13 shows that the performance of the compensated load forecast is indeed better than the forecast by only the LSTM, which can also be verified using Root Mean Square Error (RMSE) given in Table 2.

4.3. ESS Scheduling

Based on the compensated load forecast using real building data, the ESS scheduling depicted in Figure 6 is done by solving the optimization problems (14) and (23). The optimization problems are solved using the CVX toolbox in MATLAB [27], and the parameters are shown in Table 3. The scheduling result is shown in Figure 14. In Figure 14, the first panel shows the real load power P r e a l , P ^ by LSTM only, and P ^ c o m p . Note that the ESS is scheduled to dispatch for only the load in between the load forecast (i.e., P ^ or P ^ c o m p ) and P peak . For instance, in Figure 14 the red area is wider than the blue area as P ^ c o m p is much closer to the real load than P ^ . In the second panel of Figure 14, the blue line is the provided power from the utility grid without using the ESS, the orange line the provided power using the ESS scheduling with P ^ , and the red dashed line the provided power using the ESS scheduling with P ^ c o m p . The red dashed line shows that the proposed ESS scheduling reduces the peak load successfully especially when the accuracy-enhanced load forecast is employed. Besides, the green line denotes the electricity price for a day. The on-peak time is defined from 11:00 to 15:00 on which the price is 5 times more expensive than the normal price. In the third panel in Figure 14, the orange line and the red dashed line are the ESS outputs when the scheduling is done with P ^ and P ^ c o m p , respectively. The circle and asterisk denote the corresponding SoC evolution. Note that the ESS scheduling based on P ^ c o m p charges more during the off-peak time in order to reduce the peak load during the on-peak time. As the ESS is charged during the off-peak time and discharge more during the on-peak time, the electricity price to pay is reduced. Indeed, the cost (i.e., c ( t ) P grid ( t ) ) for consumed electricity is 1772 when the ESS scheduling is based on P ^ c o m p while 1887 when the ESS scheduling uses P ^ computed by LSTM only. Note that P grid ( t ) denotes consumed electricity, i.e., the total electricity provided by the utility grid, and that P grid ( t ) is used for computing the cost instead of P ^ grid ( t ) , which is used in the optimization (14) and (23) for the scheduling. Moreover, note that the ESS starts to charge right after on-peak time due to the constraint (31) (or (22)). In the simulation of Figure 14, P peak is determined such that the blue area becomes 50 % of the ESS capacity.
In Figure 15, similar simulation is done but different electricity price ( c ( t ) ) profile is used. In the second figure of Figure 15, the green line denotes the electricity price ( c ( t ) ) profile. Again, the red dashed line shows that the proposed method reduces the peak load successfully this electricity price ( c ( t ) ) profile. The price has three levels: off-peak, shoulder, and on-peak. The on-peak time is the same as the previous simulation, and the shoulder time is from 05:00 to 10:00 and from 16:00 to 18:00, and the other times are off-peak times. During the shoulder, the electricity price is double that of the off-peak time and it is five times during the on-peak time. In view of the simulation results with this setting in Figure 15, again, it is verified that the ESS scheduling with the accuracy-enhanced load forecast leads to cheaper cost compared with that using LSTM based load forecast. In other words, the cost changes from 2193 to 2094. Figure 16 shows the cost before (blue bar) and after (red bar) compensation for the total test data. It is shown that the proposed ESS scheduling using the compensated load forecast leads to a lower cost for the most testing days. Considering the sum of the electricity rate for all testing 85 days, it costs 136,550 before compensation while 133,590 after compensation.

5. Discussion: Effect of Tuning Parameters on Performance

In the proposed ESS scheduling method, there are two kinds of tuning parameters: w 1 , w 2 , w 3 , w 4 and P peak . As the role of w 1 and w 2 is rather straightforward, in this section, it is shown that how parameters w 3 , w 4 and P peak influence on the performance of the ESS scheduling. For comparison purpose, the parameters setting used in Figure 14 are the baseline case.

5.1. Effect of Weights w 3 and w 4

Figure 17 shows how the cost (i.e., c ( t ) P grid ( t ) ) changes according to w 3 and w 4 . With the parameters w 3 = 0.015 and w 4 = 0.008 resulting in the lowest cost, all the previous simulations are done. As not only the cost but also ESS lifetime matter in this paper, ESS charging and discharging pattern are investigated in accordance with various w 3 and w 4 in Figure 18 and Figure 19. Note that smooth charging and discharging are helpful to the ESS lifetime in addition to satisfaction of SoC constraints (28). As seen in Figure 18, the peak shaving is carried out better as w 3 increases with fixed w 4 = 0.008 . Furthermore, the charging and discharging become smoother as w 4 increases with fixed w 3 = 0.015 in Figure 19.

5.2. Effect of P peak

In Figure 20 and Figure 21, the effect of parameter P peak is tested, and Table 4 summarizes the parameters setting and simulation results. As shown in Table 4, when P peak is lower than the baseline (i.e., Case 1), the resulting cost is reduced since the amount of charging and discharging becomes larger. However, such active charging and discharging can decrease the lifetime of the ESS. In contrast, when P peak is higher than the baseline (i.e., Case 2), the situation is the other way around. Therefore, a trade-off has to be considered in real application between the reduced electricity cost and the cost due to the reduced lifetime of the ESS.

6. Conclusions

This paper proposed an ESS scheduling for peak load shaving in building energy management. Especially, a focus is placed on how to use the load forecast effectively in the ESS scheduling. To this end, first, an existing method to enhance the accuracy of the load forecast is applied to real building energy and temperature data and it is verified that the accuracy of the resulting load forecast is indeed improved. Second, an optimization problem is formulated for the ESS scheduling using the previously obtained accuracy-enhanced load forecast. The proposed ESS scheduling is tested using load power and temperature data from a real commercial building. Simulation results demonstrate that the proposed ESS scheduling reduces the peak load successfully. Moreover, it is discussed how to tune the parameters in the optimization in order to take both the reduced cost by the peak shaving and the ESS lifetime into account. One implication of this paper is that not only historical data but also real-time data on nature and building need to be used properly for efficient building energy management in today’s big data era. Therefore, more effort has to be put to collect and analyze the data, and to extract required important information from the data for better building energy management.
Only the outdoor temperature is considered, which has an effect on the load power in this paper and the detailed information of the building is not used in the forecast and the ESS scheduling. Therefore, a natural future work is to take more information affecting the load power such as humidity into account for load forecast and to consider various indoor building parameters for the ESS scheduling. Furthermore, another promising future work includes reinforcement learning based ESS scheduling which can replace the optimization in this paper.

Author Contributions

J.S.H. and I.R.F. surveyed the backgrounds of this research, designed the preprocessing data, designed the deep learning network, and performed the simulations and experiments to show the benefits of the proposed method. J.-S.K. and H.S. supervised and supported this study. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Acknowledgments

This study was supported by the Research Program funded by the SeoulTech (Seoul National University of Science and Technology).

Conflicts of Interest

The authors declare no conflict of interest.

Abbreviations

The following abbreviations are used in this manuscript.
LSTMLong Short-Term Memory
MLPMulti-Layer Perceptron
BEMSBuilding Energy Management System
ESSEnergy Storage System
MAEMean Absolute Error
RMSERoot Mean Square Error
Nomenclature
Forecast
TOutdoor temperature.
PLoad power.
T ^ Prediction of the outdoor temperature.
P ^ Prediction of the load power.
Δ T Deviation of temperature prediction ( T T ^ ).
Δ P ^ Deviation error of load prediction ( P P ^ ).
P ^ comp Compensated prediction of the load power.
ESS Scheduling
tHourly time interval.
P ess ( t ) Power from the ESS.
P shave ( t ) Power between the load forecast and P peak .
P ^ grid ( t ) Estimated power purchased from the utility.
P peak A tuning parameter for peak shaving.
S o C ( t ) State of charge of the ESS.
c ( t ) Electricity price.
P grid ( t ) Power purchased from the utility.

References

  1. Uddin, M.; Romlie, M.F.; Abdullah, M.F.; Abd Halim, S.; Abu Bakar, A.H.; Chia Kwang, T. A review on peak load shaving strategies. Renew. Sustain. Energy Rev. 2018, 82, 3323–3332. [Google Scholar] [CrossRef]
  2. Rahimi, A.; Zarghami, M.; Vaziri, M.; Vadhva, S. A simple and effective approach for peak load shaving using Battery Storage Systems. In Proceedings of the 2013 North American Power Symposium (NAPS), Manhattan, KS, USA, 22–24 September 2013; pp. 1–5. [Google Scholar]
  3. Joshi, K.A.; Pindoriya, N.M. Day-ahead dispatch of Battery Energy Storage System for peak load shaving and load leveling in low voltage unbalance distribution networks. In Proceedings of the 2015 IEEE Power Energy Society General Meeting, Denver, CO, USA, 26–30 July 2015; pp. 1–5. [Google Scholar]
  4. Kodaira, D.; Jung, W.; Han, S. Optimal Energy Storage System Operation for Peak Reduction in a Distribution Network Using a Prediction Interval. IEEE Trans. Smart Grid 2020, 11, 2208–2217. [Google Scholar] [CrossRef]
  5. Martins, R.; Hesse, H.C.; Jungbauer, J.; Vorbuchner, T.; Musilek, P. Optimal Component Sizing for Peak Shaving in Battery Energy Storage System for Industrial Applications. Energies 2018, 11, 2048. [Google Scholar] [CrossRef] [Green Version]
  6. Gibilisco, P.; Ieva, G.; Marcone, F.; Porro, G.; Tuglie, E.D. Day-ahead operation planning for microgrids embedding Battery Energy Storage Systems. A case study on the PrInCE Lab microgrid. In 2018 AEIT International Annual Conference; IEEE: Piscataway, NJ, USA, 2018; pp. 1–6. [Google Scholar]
  7. Yu, L.; Jiang, T.; Zou, Y. Online Energy Management for a Sustainable Smart Home With an HVAC Load and Random Occupancy. IEEE Trans. Smart Grid 2019, 10, 1646–1659. [Google Scholar]
  8. Kim, N.K.; Shim, M.H.; Won, D. Building Energy Management Strategy Using an HVAC System and Energy Storage System. Energies 2018, 11, 2690. [Google Scholar] [CrossRef] [Green Version]
  9. Niu, D.X.; Wanq, Q.; Li, J.C. Short term load forecasting model using support vector machine based on artificial neural network. In Proceedings of the 2005 International Conference on Machine Learning and Cybernetics, Guangzhou, China, 18–21 August 2005; Volume 7, pp. 4260–4265. [Google Scholar]
  10. Chen, C.; Duan, S.; Cai, T.; Liu, B.; Hu, G. Optimal Allocation and Economic Analysis of Energy Storage System in Microgrids. IEEE Trans. Power Electron. 2011, 26, 2762–2773. [Google Scholar] [CrossRef]
  11. Soroudi, A.; Siano, P.; Keane, A. Optimal DR and ESS Scheduling for Distribution Losses Payments Minimization Under Electricity Price Uncertainty. IEEE Trans. Smart Grid 2016, 7, 261–272. [Google Scholar] [CrossRef] [Green Version]
  12. Mukhopadhyay, P.; Mitra, G.; Banerjee, S.; Mukherjee, G. Electricity load forecasting using fuzzy logic: Short term load forecasting factoring weather parameter. In Proceedings of the 2017 7th International Conference on Power Systems (ICPS), Pune, India, 21–23 December 2017; pp. 812–819. [Google Scholar]
  13. González, P.A.; Zamarreño, J.M. Prediction of hourly energy consumption in buildings based on a feedback artificial neural network. Energy Build. 2005, 37, 595–601. [Google Scholar] [CrossRef]
  14. Deb, C.; Eang, L.S.; Yang, J.; Santamouris, M. Forecasting diurnal cooling energy load for institutional buildings using Artificial Neural Networks. Energy Build. 2016, 121, 284–297. [Google Scholar] [CrossRef]
  15. Rahman, A.; Srikumar, V.; Smith, A.D. Predicting electricity consumption for commercial and residential buildings using deep recurrent neural networks. Appl. Energy 2018, 212, 372–385. [Google Scholar] [CrossRef]
  16. Bouktif, S.; Fiaz, A.; Ouni, A.; Serhani, M.A. Optimal Deep Learning LSTM Model for Electric Load Forecasting using Feature Selection and Genetic Algorithm: Comparison with Machine Learning Approaches. Energies 2018, 11, 1636. [Google Scholar] [CrossRef] [Green Version]
  17. Fan, C.; Wang, J.; Gang, W.; Li, S. Assessment of deep recurrent neural network-based strategies for short-term building energy predictions. Appl. Energy 2019, 236, 700–710. [Google Scholar] [CrossRef]
  18. Kong, W.; Dong, Z.Y.; Jia, Y.; Hill, D.J.; Xu, Y.; Zhang, Y. Short-Term Residential Load Forecasting Based on LSTM Recurrent Neural Network. IEEE Trans. Smart Grid 2019, 10, 841–851. [Google Scholar] [CrossRef]
  19. Yudantaka, K.; Kim, J.S.; Song, H. Dual Deep Learning Networks Based Load Forecasting with Partial Real-Time Information and Its Application to System Marginal Price Prediction. Energies 2020, 13, 148. [Google Scholar] [CrossRef] [Green Version]
  20. Tushar, M.H.K.; Zeineddine, A.W.; Assi, C. Demand-Side Management by Regulating Charging and Discharging of the EV, ESS, and Utilizing Renewable Energy. IEEE Trans. Ind. Inform. 2018, 14, 117–126. [Google Scholar] [CrossRef]
  21. Zhang, Z.; Wang, J.; Ding, T.; Wang, X. A Two-Layer Model for Microgrid Real-Time Dispatch Based on Energy Storage System Charging/Discharging Hidden Costs. IEEE Trans. Sustain. Energy 2017, 8, 33–42. [Google Scholar] [CrossRef]
  22. Choi, S.; Min, S. Optimal Scheduling and Operation of the ESS for Prosumer Market Environment in Grid-Connected Industrial Complex. IEEE Trans. Ind. Appl. 2018, 54, 1949–1957. [Google Scholar] [CrossRef]
  23. Hochreiter, S.; Schmidhuber, J. Long Short-Term Memory. Neural Comput. 2006, 9, 1735–1780. [Google Scholar] [CrossRef] [PubMed]
  24. Goodfellow, I.; Bengio, Y.; Courville, A. Deep Learning; MIT Press: Cambridge, MA, USA, 2017. [Google Scholar]
  25. OpenEI. Available online: https://openei.org/datasets/dataset/consumption-outdoor-air-temperature-11-commercial-buildings (accessed on 30 September 2019).
  26. Tensorflow.org. Deep Learning Library developed by Google. Available online: https://www.tensorflow.org/ (accessed on 14 October 2019).
  27. CVX. Matlab Software for Disciplined Convex Programming. Available online: http://cvxr.com/ (accessed on 1 June 2020).
Figure 1. The proposed Energy Storage System (ESS) scheduling using load forecast.
Figure 1. The proposed Energy Storage System (ESS) scheduling using load forecast.
Energies 13 05633 g001
Figure 2. Entire structure of the forecast network.
Figure 2. Entire structure of the forecast network.
Energies 13 05633 g002
Figure 3. Forecasting the load demand and temperature using only past data.
Figure 3. Forecasting the load demand and temperature using only past data.
Energies 13 05633 g003
Figure 4. Relation between temperature deviation and load deviation.
Figure 4. Relation between temperature deviation and load deviation.
Energies 13 05633 g004
Figure 5. Timeline of the forecast compensation procedure.
Figure 5. Timeline of the forecast compensation procedure.
Energies 13 05633 g005
Figure 6. Two-stage ESS scheduling.
Figure 6. Two-stage ESS scheduling.
Energies 13 05633 g006
Figure 7. Structure of the proposed Building Energy Management System (BEMS).
Figure 7. Structure of the proposed Building Energy Management System (BEMS).
Energies 13 05633 g007
Figure 8. Description of P shave and P peak .
Figure 8. Description of P shave and P peak .
Energies 13 05633 g008
Figure 9. Training data: temperature and load data for July from 2009 to 2011.
Figure 9. Training data: temperature and load data for July from 2009 to 2011.
Energies 13 05633 g009
Figure 10. Temperature and load forecast using LSTM for five testing days.
Figure 10. Temperature and load forecast using LSTM for five testing days.
Energies 13 05633 g010
Figure 11. Training data: temperature and load forecast deviations for 86 days in 2010.
Figure 11. Training data: temperature and load forecast deviations for 86 days in 2010.
Energies 13 05633 g011
Figure 12. Δ P ^ [ 8 , 23 ] with arbitrary Δ T [ 0 , 7 ] .
Figure 12. Δ P ^ [ 8 , 23 ] with arbitrary Δ T [ 0 , 7 ] .
Energies 13 05633 g012
Figure 13. Compensated load forecast P ^ comp .
Figure 13. Compensated load forecast P ^ comp .
Energies 13 05633 g013
Figure 14. ESS scheduling results. The first figure shows real load power P, load forecast P ^ by LSTM, and the compensated load forecast P ^ comp . The second figure depicts the load power P without ESS (blue line), load power P with ESS and P ^ by LSTM (orange line), and load power P with ESS and P ^ comp (red dashed line). In the second figure, the difference between the blue line and red dashed line denotes the shaved load power during on-peak time. The green line denotes the time-varying electricity price. The best peak shaving is obtained with P ^ comp in the ESS scheduling. The third figure shows P ess and S o C ( t ) .
Figure 14. ESS scheduling results. The first figure shows real load power P, load forecast P ^ by LSTM, and the compensated load forecast P ^ comp . The second figure depicts the load power P without ESS (blue line), load power P with ESS and P ^ by LSTM (orange line), and load power P with ESS and P ^ comp (red dashed line). In the second figure, the difference between the blue line and red dashed line denotes the shaved load power during on-peak time. The green line denotes the time-varying electricity price. The best peak shaving is obtained with P ^ comp in the ESS scheduling. The third figure shows P ess and S o C ( t ) .
Energies 13 05633 g014
Figure 15. ESS scheduling results with different electricity price c ( t ) .
Figure 15. ESS scheduling results with different electricity price c ( t ) .
Energies 13 05633 g015
Figure 16. Daily cost for total test data.
Figure 16. Daily cost for total test data.
Energies 13 05633 g016
Figure 17. Effect of Weights w 3 and w 4 on the Cost.
Figure 17. Effect of Weights w 3 and w 4 on the Cost.
Energies 13 05633 g017
Figure 18. Effect of Weights w 3 on the Amount of Peak Shaving.
Figure 18. Effect of Weights w 3 on the Amount of Peak Shaving.
Energies 13 05633 g018
Figure 19. Effect of Weights w 4 on the Charging and Discharging Shape.
Figure 19. Effect of Weights w 4 on the Charging and Discharging Shape.
Energies 13 05633 g019
Figure 20. Result for Case 1. Significant peak shaving and large charging and discharging.
Figure 20. Result for Case 1. Significant peak shaving and large charging and discharging.
Energies 13 05633 g020
Figure 21. Result for Case 2. Little peak shaving and little charging and discharging.
Figure 21. Result for Case 2. Little peak shaving and little charging and discharging.
Energies 13 05633 g021
Table 1. Network parameters for training.
Table 1. Network parameters for training.
ParameterLSTMMLP
Number of layers33
Number of neurons128 × 128 × 264 × 64 × 16
Batch size55
Number of epochs100100
Learning rate0.0010.001
Loss functionMAEMAE
OptimizerADAMADAM
Table 2. Root Mean Square Error (RMSE) value for test data.
Table 2. Root Mean Square Error (RMSE) value for test data.
RMSE Value i = 1 85 ( P i P ^ i ) 2 85
Prediction P ^ by only the LSTM5.078
Compensated prediction P ^ comp 4.306
Table 3. Parameters for ESS scheduling.
Table 3. Parameters for ESS scheduling.
w 1 w 2 w 3 , w 4
0.55000.015, 0.008
η E c α
0.95120 kWh3
P m a x So C m i n So C m a x
300.10.9
Table 4. Effect of parameters P peak .
Table 4. Effect of parameters P peak .
Baseline P peak = 50 kW (50% of ESS)
c ( t ) P grid ( t ) 1772
Case 1 P peak = 46 kW (80% of ESS)
c ( t ) P grid ( t ) 1703
Case 2 P peak = 54 kW (20% of ESS)
c ( t ) P grid ( t ) 1868
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Hwang, J.S.; Rosyiana Fitri, I.; Kim, J.-S.; Song, H. Optimal ESS Scheduling for Peak Shaving of Building Energy Using Accuracy-Enhanced Load Forecast. Energies 2020, 13, 5633. https://doi.org/10.3390/en13215633

AMA Style

Hwang JS, Rosyiana Fitri I, Kim J-S, Song H. Optimal ESS Scheduling for Peak Shaving of Building Energy Using Accuracy-Enhanced Load Forecast. Energies. 2020; 13(21):5633. https://doi.org/10.3390/en13215633

Chicago/Turabian Style

Hwang, Jin Sol, Ismi Rosyiana Fitri, Jung-Su Kim, and Hwachang Song. 2020. "Optimal ESS Scheduling for Peak Shaving of Building Energy Using Accuracy-Enhanced Load Forecast" Energies 13, no. 21: 5633. https://doi.org/10.3390/en13215633

APA Style

Hwang, J. S., Rosyiana Fitri, I., Kim, J. -S., & Song, H. (2020). Optimal ESS Scheduling for Peak Shaving of Building Energy Using Accuracy-Enhanced Load Forecast. Energies, 13(21), 5633. https://doi.org/10.3390/en13215633

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.