1. Introduction
The European Union is transitioning towards a low-carbon society, driven by Directives and Regulations in the energy sector concerned with the promotion of the use of energy from renewable sources, with common rules for the internal market of electricity, with risk-preparedness in the electricity sector, and with energy efficiency [
1]. Novel requirements for Distribution Network (DN) operation, presented in the “Clean Energy for all Europeans” package [
2], prompt the development and integration of new elements, an electricity market, and services. If an element of a network can be controlled, it is an active element. Otherwise, it is a passive element. The conventional methods of planning DNs, based only on deterministic, network solution planning, worst-case, and fit-and-forget methods, are considered obsolete and are being replaced by active planning approaches [
3]. The consideration of active elements in these modern approaches should enable network operations and operations in extreme, still permissible conditions to have greater flexibility, which were previously not possible due to DN’s passive nature.
Furthermore, a proliferated introduction of Advanced Measuring Infrastructure (AMI) aims to include system meters for all system users, a communication infrastructure that allows for data transmission from system counters to measuring centers and a single information system. If utilized and managed correctly, AMI should provide the input data necessary for advanced network operation, design, and optimization algorithms.
This paper deals with the optimization of DN operations in terms of minimization of power losses at a considered point of operation by simultaneously determining the optimal settings of active elements present in the network. A decrease in the voltage level at which electricity is transferred through the network results in higher electric currents and higher power and energy losses. Therefore, reductions in power losses in Medium Voltage (MV) and Low Voltage (LV) parts of the electric power system are crucial for improving its performance. Furthermore, reducing power losses also reduces CO2 emissions and improves DN efficiency, which coincides with the “Clean Energy for all Europeans” package goals. The following literature review first provides an overview of the approaches to DN optimization. It then focuses on the procedures that consider active participation of reactive power provision, network configuration, and on-load tap change (OLTC) equipped substations. Finally, it presents the novelties and contributions of the proposed procedure by comparing it with similar approaches found in the literature.
Mathematical formulation and program implementation of various approaches to DN optimization differ significantly in terms of implementation reliability, complexity, and required computational effort, as certain techniques are more suitable for specific types of problems. A comprehensive review paper [
4] describes DN optimization from the viewpoint of utilized optimization algorithms, including the selection of fitness functions and decision variables, loading models, size of the test networks, planning type, and planning period. This review concludes that, although various optimization algorithms have already been applied to various aspects of DN optimization problems, the development of efficient algorithms capable of escaping from local optima and finding near-global solutions remains an important issue. Sedghi et al. [
5] outlined the main advantages of meta-heuristic algorithms for DN planning, compared to the classical, nowadays, considered outdated algorithms, such as the transportation [
6] or branch and bound algorithms [
7]. Within the metaheuristics, the authors of [
5] distinguished between trajectory-based algorithms (e.g., branch exchange, simulated annealing, and tabu search) and population-based (e.g., genetic and evolutionary algorithms, ant colony, particle swarm optimization, and hybrid methods) and compared them. They concluded that the individual metaheuristics’ capability depends on the dimension and complexity of the problem and finds that hybrid methods modified for specific problem solving show the most promising results, which is a similar conclusion to the one given in [
8]. Additional literature surveys on the metaheuristic methodologies for minimization of power and energy losses are found in [
4,
9]. The papers compare different approaches, such as network reconfiguration, optimal installation of distributed generation (DG) units, their participation in reactive power provision, optimal placement of capacitor banks, optimal operation of tap-changer equipped substations, and demand response. Different approaches to solving a mixed-integer, nonlinear optimization problem for network reconfiguration aim to improve the computational efficiency and convergence characteristics and to reduce the possibility of selecting a local optimal solution. Examples of such approaches include simulated annealing [
10,
11], particle swarm optimization [
12,
13], evolutionary algorithms [
14,
15,
16], fuzzy frameworks [
17], and artificial neural networks [
18,
19]. Sultana et al. concluded that metaheuristic methods for network reconfiguration require fewer calculations and may converge to a final feasible solution quickly [
20]. Although designed and built in a meshed topology, DN operates almost exclusively in a radial configuration [
21]. The development of modern switching gears enabled more frequent changes in radial configuration, which could, provided AMI and proper algorithms, be utilized to optimize real-time operation [
22]. Studies performed on real networks, considering fixed vs. hourly changes in network configurations [
23,
24], concluded that network reconfiguration results in a reduction in power losses. However, they emphasized caution when increasing the number of switching actions since these cause transient phenomena and reduce the devices’ lifespan. Studies that also considered the presence of DG of constant [
25] or variable power generation [
22], and multi-criteria operation cost optimization [
26] concluded that the benefits for the network outweigh the concerns mentioned above due to the volatile nature of DG.
The optimal reactive power provision by DG units in the network can reduce the network’s power losses [
27,
28,
29] and shows excellent potential as an ancillary service provider [
30]. Micro-inverters of photovoltaic (PV) systems result in greater network operation flexibility through optimal reactive power generation. However, the inverter’s efficiency characteristics should be taken into account, as they are dependent on the amount of reactive power generated [
31].
OLTC is a mechanical device that enables open-loop voltage control by varying the transformer turn ratio under load [
32]. Once present only in primary distribution substations (DSSs), OLTC equipped transformers are nowadays also installed within secondary DSSs. Vacuum-type OLTCs require no scheduled maintenance in their lifetime (300,000 up to 600,000 tap operations, i.e., from 20 to 40 tap operations per day during a 40 year-long lifespan [
32]), which makes them particularly suitable not only in the improvement of voltage profiles [
33,
34] but also in the reduction of network losses [
35,
36]. An example of the combined consideration of optimal reactive power provision and reduction in unnecessary tap operations also shows that minimization of power losses can be achieved while performing voltage control [
37,
38]. Although the approaches mentioned above offer specific solutions to optimizing various aspects of network operation, they lack the simultaneous consideration of active elements selected in the proposed procedure, with the objective to minimize power losses and to ensure operational constraints.
The procedure proposed in this paper is formulated as a nonlinear and constrained optimization problem, where the Differential Evolution (DE) algorithm [
39] is used as the optimization tool. The active elements considered are DG units, capable of active participation in reactive power provision; remotely controlled switches for changing the network configuration; and an OLTC equipped substation, supplying the network. The search population, evaluated using a DE algorithm, finds optimal settings of these active elements, while constraints ensure proper ampacities of line segments and voltage profiles defined within EN 50160 [
40]. Even though the same set of active elements can also be found in [
41,
42], their role in network operation, the optimization method, formulation of objective and constraint functions, and the type of test site considered are different. In our paper, the role of active elements in optimizing DN operation is the minimization of power losses while ensuring proper voltage profiles and line ampacities. Furthermore, our procedure is intended as a tool for online optimization of network operation, while the authors of [
41] proposed a network planning tool and those of [
42] offered a model for reactive power optimization. The IEEE 33-node network model was utilized in [
41,
42] while the proposed procedure was developed during the demo project on an actual DN to analyze the time-dependent role of installed active elements in minimizing power losses.
This paper simultaneously considers the active network elements in a network and gives them new roles in optimizing network operations through the proposed procedure. Therefore, the novelties and main contributions presented within the paper include the following:
development of a computationally efficient and reliable optimization procedure for minimization of power losses at a considered point of operation using reactive power generation, network reconfiguration, and an OLTC equipped substation;
at the same time, the procedure ensures proper voltage profiles and line ampacities;
the procedure is scalable and flexible as it can be modified to include additional types of active elements and their increase in numbers;
the procedure is intended to be used as a standalone tool for optimizing a single operation point or in a series of time-discrete optimization procedures in which long-term network operation is improved; and
the procedure is intended to be easily implemented in real-world networks and to provide the proper measurement and communication infrastructure.
Improvement of a time-discrete and daily DN operation that can be achieved using the proposed procedure is demonstrated on a model of a real MV network. The considered network was a part of a smart grid demo project funded by Japanese technology agency NEDO and Slovenian Transmission system operator Eles d.o.o., implemented in Slovenian distribution networks.
The rest of the paper is structured as follows. The second section introduces and explains the proposed procedure for optimizing a DN operation through the utilization of active DN elements. The procedure is tested on a model of an actual MV DN through a case study presented in
Section 3. The results obtained by implementing the procedure on the chosen test site are presented in
Section 4, followed by the fifth section, which concludes the paper.
2. Methodology
A flowchart of the proposed procedure for optimization of a time-discrete DN operation using active elements is presented in
Figure 1. The procedure comprises nine steps, marked (
a)–(
i) in
Figure 1 for clarity purposes.
First, an evaluation of the operation state for the original network conditions is performed. Then, a detailed model of the considered network is created (step (
a)). The initial settings of the considered active elements, i.e., the actual reactive power generation, network configuration, and OLTC’s tap position at a considered time point and other loading and generation data, are provided in step (
b). Based on these information, power losses for the original network conditions are calculated
using a backward–forward sweep method [
43] for load flow calculation. From here, optimization of the procedure follows, i.e., the optimization module, which was implemented based on a DE algorithm [
39]. The role of the optimization module is to find a vector of search parameters
that minimizes the chosen fitness function
. In this paper, a vector of the search population defines the operational parameters, i.e., settings of the considered active elements, and their formulation is discussed in the following subsections. The optimization module comprises five steps, marked (
d)–(
h) in
Figure 1. Step (
d) includes the initialization of the vector of search population
as well as the other optimization parameters, such as the maximum number of iterations, the crossover and mutation parameters, and the strategy for selection of new generations of a search population. For every vector of search population
considered, the DE algorithm recalculates power losses (step (
e)) and evaluates the corresponding value of the chosen fitness function
(step (
f)), with the goal of minimizing power losses while ensuring proper voltage profiles and preventing thermal overloading of power lines. The evaluation is performed until the maximum number of iterations is exceeded (step (
g)). In the end, the optimization module returns the optimal settings of active elements (i.e., reactive power generation, network configuration, and tap position of the OLTC) for which the network operates with minimum losses (step (
i)).
The fitness function
is formulated with the objective to minimize the power losses in a time-discrete point, i.e., in the form of a quotient between the power losses of a currently evaluated solution
and losses of the initial network operation
, as given in (
1). During every evaluation of
in step (
f), penalty
p is applied if any of the defined constraints is violated, i.e., a search parameter not on a permitted interval
or the occurrence of undervoltages, overvoltages, or thermal overloading.
The vector of search parameters is a three-element vector
. Parameter
searches for the optimal share of reactive power generation by DG units, the parameter
searches for the optimal network configuration, and parameter
searches for the optimal tap position of the OLTC equipped DSS supplying the network. DE, in its original formulation as given by its authors [
39], searches for the optimal solution in a continuous space, i.e., in a set of real numbers
, usually on a normalized interval
. However, network configuration and the tap position of OLTC are defined by discrete values and are selected from the set of positive integers
and a complete set of integers
, respectively. Therefore, some modifications of the original code, given by the authors of the DE [
39], had to be made to allow for selection of the optimal network configuration and tap position from the set of integers. The idea of utilizing a DE for finding a solution that is not in a continuous space is not a new one, and different approaches to solving binary [
44,
45,
46], or integer and mixed-integer differential evolution [
47,
48] can be found. The transition from a continuous to discrete search space, utilized for determining optimal network configuration and tap position, is discussed in
Section 2.2 and
Section 2.3.
2.1. Reactive Power Generation
The optimal value of the first search parameter
determines such reactive power generation from the DG units integrated within the network, for which the network operates with minimum power losses. Its value is the same value for all DG units, thus ensuring reactive power generation impartiality between the individual units. Reactive power generation is defined as a relative share of active power generation on the interval
. A positive sign represents the capacitive, and a negative sign represents the inductive nature of the generated reactive power. The maximum allowed share
is determined from [
49], which states that DG units integrated within the network must operate with a power factor up to
. Using the phasor representation of a complex power in
Figure 2, and basic relations between the amplitudes of its real component (active power)
and imaginary component (reactive power)
, the percentage (75%) can be obtained by (
2). A reactive power generation
in any observed time point is then defined as a share of active power generation
in the same instance, using the value of the search parameter
(
3). The linear function
, which occurs in
Figure 2 and (
3), describes how the interval in which the independent variable is defined
and translated into the dependent variable’s interval
, as illustrated in the upper left corner in
Figure 2.
2.2. Network Reconfiguration
The second active element considered in this paper is a remotely controlled switch for changing the configuration in which the network operates. Its active participation in this paper is referred to as network reconfiguration. When appropriately utilized, the time-variant network reconfiguration can facilitate higher cost-effectiveness, efficiency, reliability, and power quality. However, some challenges remain in terms of network protection and stability [
50,
51].
In the proposed optimization algorithm, the second search parameter
is used for finding such a network configuration, which yields the minimum power loss at a considered operation point. The search parameter is defined on a normalized interval
. This search interval is then divided into
subintervals, where
equals the number of considered network configurations. Then, any value of
on the
subinterval corresponds to the
configuration, as presented in
Figure 3. For example, the first configuration
is returned for
and the second configuration
is returned for
, where vector
represents pointers to all possible network configurations.
Index
of the radial configuration yielding minimum power losses represents an element of a vector of possible network configurations
. It is determined from the value of search parameter
, as given in (
4). In other words, search parameter
is used in the calculation of a pointer to an individual network configuration
. Even though the DE has to search for an optimal solution in discrete space, some of the nature of continuity is maintained by sorting the indices of radial configurations in the same order as the remotely controlled switches occur along the feeder. This way, opening consecutive switches along the line causes a gradual increase or decrease in power losses, as the network loads are transferred gradually from one feeder to another. Therefore, a proper ordering of indices in vector
plays an important role in preventing the local minima in which the DE may get stuck.
2.3. Operation of OLTC
An OLTC is a mechanical device installed inside a transformer tank or mounted in a separate compartment normally welded to the transformer. It enables voltage control by varying the transformer turn ratio under load without interruption in the electric energy supply. The change in turn ratio is performed by adding or subtracting turns from high- or low-voltage winding, using the control or tap winding connected to the OLTC. The voltage between the taps represents the step voltage
[
32]. The basic performance design of an OLTC, “make before break”, allows for operation under load, as a resistor (or reactor) can connect two adjacent taps and can transfer the load from one tap to the other without supply interruption or a significant change in the load current. Simultaneously, they limit the circulating current for the period when both taps are used [
32]. Advanced algorithms for active control of OLTC may be utilized to enable such an OLTC operation, which in addition to performing voltage control, can also minimize the power losses [
52]. Similarly, the OLTC in this paper is utilized for both minimizing power losses and ensuring proper voltage profiles through given fitness and penalization functions, respectively.
An MV busbar of an OLTC equipped DSS supplying a network represents the slack node of a network model. The voltage amplitude
of the slack node, for the tap positions
, is determined using (
5), with
being the base voltage of an MV part of the network.
The vector of possible tap positions
is a symmetrical vector of negative and positive integers determined from the number of all tap positions for a considered OLTC device
using (
6).The optimal tap position of OLTC
is an integer number determined from the search parameter
. The problem of transition from a continuous to a discrete space is resolved by dividing the interval
into
subintervals as depicted in
Figure 3, with each subinterval corresponding to an individual tap position. Parameter
plays a role in choosing the optimal tap position, i.e, it is used in a calculation of a pointer to an individual tap position
(
7). Voltage control from the lowest tap position
towards the highest one
results in a gradual increase in the voltage, which is suitable for searching for an optimal tap position with the DE algorithm, as there are no local minima in the search space.
2.4. Loading Models
The behavior of the loads with respect to the supply voltage has a great impact on the operation of network elements [
53]. Therefore, polynomial models of the active
(
8) and reactive power
(
9) consumed in a node
i with voltage amplitude
are utilized [
54]. The pairs of coefficients for defining constant power, constant current, and constant impedance loading models are
,
, and
, respectively. These coefficients represent the independence, linear dependency, and quadratic voltage dependency of active
and reactive power
and correspond to the constant power, constant current, and constant impedance loading models, respectively. Each pair of coefficients describes the share of a single model in the whole polynomial model. Therefore, the sum of coefficients for active and reactive power has the value 1, as given in (
10) and (
11).
3. Test Site
The following section presents an actual MV network model used in a case study of optimization of a network operation by utilizing active elements. The network considered within simulations in
Section 4 was included in the Slovene–Japanese smart grid project NEDO and was equipped with the above standard devices, functionalities, and network observability. Although above standard, the measurement and communication infrastructure is still insufficient to provide the exact value of power losses in the network, since power generation and consumption data are not provided for all network users. Therefore, DN operation simulations are still used when discussing and assessing network losses since the required measurements cannot be performed. Furthermore, minimization of power losses was not the primary goal of the abovementioned project, and our paper analyzes how the newly installed active network elements could be used to improve additional aspects of network operation.
The single line diagram of the considered MV network presented in
Figure 4 was used for the quasi steady-state analysis of the network operation. Three 20 kV feeders were connected to the 110/20 kV transformer substation supplying 110 MV/LV DSSs and 30 DG units. The total rated power of the generation units was
, composed of the PV systems and hydropower plants, in approximately the same share. Time-dependent loading conditions in the discussed network were determined from power loading and generation measurements for 5 July 2019, provided by the electric utility company. The network model is composed of 296 nodes and 297 branches, forming two loops. Loops can be opened or closed remotely by introducing relays with switching capability and bi-directional communication between them, at 14 points (referred to as breakpoints), in the considered part of the network. These elements enable the consideration of network configuration as an active element of the network. A schematic presentation of the considered network is given in
Figure 5, with 14 remotely controlled breakpoints, i.e., relays with switching capabilities, marked by a red cross sign “
×”.
Numbers 1 to 22 in
Figure 5 represent the indices of network configurations obtained by decoupling two feeders. Opening some breakpoints can result in two or three possible configurations, which is a result of the breakpoint being placed at the location of an MV/LV substation, allowing the substation to be supplied by different feeders. In order to achieve a radial configuration from the original meshed topology, two breakpoints from the sets
(
12) and
(
13) must be opened. The number of possible radial configurations
is then determined from the product of cardinalities of sets
and
, marked
and
, resulting in 72 possible radial configurations (
14).
However, a detailed analysis, including the simulations and measurements performed in the part of the network discussed during the NEDO project, has shown that the optimal radial configuration always included decoupling Feeder 1 and Feeder 3 at a breakpoint indexed 20. On the other hand, optimal decoupling of Feeder 1 and Feeder 2 was dependent on an operational point and had to be carefully chosen each time. Therefore, an assumption that decoupling Feeders 1 and 3 is independent of the operational point was made, reducing the number of possible combinations from 72 to 12. In order to find the pointer in an optimal network configuration
out of all of the vectors of possible radial configurations
utilized by decoupling Feeders 1 and 2 (
15), the expression given in (
4) is rewritten as (
16).
The primary substation supplying the considered part of the network is equipped with an OLTC, which allows for voltage control in a range
of the rated voltage in
discrete steps with 1.33% per step, i.e., tap positions
. The amplitude of the voltage of the slack bus
for the selected tap position
is determined by (
17).
where
Thus, we rewrite (
7) as (
19).
5. Conclusions
The proliferated integration of active network elements and the measurement and communication infrastructure enable innovative approaches for evaluating and optimizing DN operations. This paper presents a straightforward and computationally efficient procedure that utilizes active elements to improve the technical aspects of a network operation, such as minimization of power losses while ensuring the proper ampacities and voltage profiles. The active elements considered within the paper are DG units, capable of reactive power provision; remotely controlled switches for changing the network configuration; and OLTC equipped substation, supplying the network. The proposed procedure is scalable and flexible and can include increased numbers and additional types of active elements. The novelties include simultaneous consideration of the aforementioned active elements for achieving minimization of power losses of a time-discrete operation state while ensuring voltage and current constraints. Furthermore, by performing a series of consecutive optimization producers on a given time interval, the optimization of a network operation for an extended period with arbitrarily time-discretization can be achieved.
Evaluation of the optimal participation of active elements, considered individually or simultaneously, on a network operation was analyzed on a real MV network model. The impact of a voltage profile on load behavior was also considered through two extreme cases, i.e., all loads in the network represented using the constant power or constant impedance loading model.
The results show that active participation of the DG units in local reactive power provision could be used to optimize network operation. The extent to which DG units can affect DN operation depends on their number, size, and location. Therefore, with the anticipation of an increased number of DG units, it is expected that their role in improving the voltage profile and in reducing power losses will also increase.
The network reconfiguration for a considered case study is the least efficient method for reducing power losses, yielding only up to 1% reduction. However, the results do not imply that network reconfiguration is an inappropriate measure but rather that the network was already designed well and that the radial configuration in which the network operates is almost the optimal one. The importance of time-dependent network reconfiguration will also increase with the integration of new network elements, increasing power demand, and the volatile nature of DG units.
OLTC is already a well-known tool for voltage control. However, if properly utilized, it can facilitate reductions in power losses as well. The optimal tap operation behavior depends significantly on the loading model used and points to the importance of proper modeling of network elements. Original daily energy losses in the constant impedance loading model are higher than in a constant power loading model due to the aforementioned voltage dependency. Additionally, the percentage of reduction achieved is higher since lowering the network voltage by lowering OLTC’s tap position results in a reduction in the power consumption. Therefore, the load behavior as a function of network voltage should be permanently monitored and evaluated in network operation. This way, proper loading models required for determining optimal tap positions can be provided.
Utilization of the individually determined settings of the active elements should be avoided for optimization of the network operation. Even though each active element is set to optimize network operation in its way, the combination of individually determined parameters could yield suboptimal results, increased power flow in a network, or even violations of the voltage constraints. Therefore, calculating optimal operation of the active elements should be performed simultaneously to avoid such problems. Furthermore, simultaneous consideration of the active elements yielded a significant 27.5% reduction in power loss. Considering that the discussed active elements are already present in the network, implementation of the proposed algorithm represents a path towards reducing power consumption in the network, improving overall DN operation efficiency, and reducing CO emissions, provided proper communication of the measurement infrastructure. Further improvements in the reduction of power losses could be achieved by incorporating additional active elements. The procedure proposed in this paper is formulated to easily include these additional elements by adding new search parameters in the existing objective function.