Development of a Construction-Site Work Support System Using BIM-Marker-Based Augmented Reality
Abstract
:1. Introduction
1.1. Research Background and Purpose
1.2. Research Method and Scope
2. Research Trends and Literature Review
2.1. Enhancement of Applicability of 3D Digital Model to Construction Site
2.2. Case Studies of BIM Application Using Revit Dynamo
2.3. Marker-Based AR Studies
2.4. BIM-Based AR Implementation by Unity
3. BIM-Marker-Based AR CWSS
3.1. CWSS Overview
3.2. Work Support System Algorithm
3.2.1. Object Classification by Construction Work Order
3.2.2. BIM-Based 3D Model Reconstruction and Automatic Marker Generation
3.2.3. Creating an Application for AR Execution
4. BIM-Marker-Based Work Support System Verification
5. Discussion
6. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- Hou, L.; Wang, X.; Truijens, M. Using augmented reality to facilitate piping assembly: An experiment-based evaluation. Int. J. Eng. Res. Appl. 2015, 8, 1–12. [Google Scholar] [CrossRef]
- Kim, H.J.; Kim, C.Y.; Jeong, H.Y.; Ha, S.J.; Kim, K.N.; Kim, H.G. 4D CAD Drawings based on Marker-based Augmented Reality. Korean J. Constr. Eng. Manag. 2015, 16, 30–40. [Google Scholar] [CrossRef]
- Kivrak, S.; Arslan, G. Using Augmented Reality in Construction Project Activities. TJENG 2019, 2018, 215–221. [Google Scholar] [CrossRef]
- Park, N.Y.; Koh, I.L. Study on the remodeling process of applying augmented reality-based BIM considering the variable wall structure. In Proceedings of the Autumn Annual Conference of AIK, Busan, Republic of Korea, 23–25 October 2014. [Google Scholar]
- Vishak, D.; Vladimir, V. Superimposing Building Information Models in Augmented Reality. In Proceedings of the 20th International Conference on Construction Applications of Virtual Reality, Middlesbrough, UK, 30 September–2 October 2020. [Google Scholar]
- Moon, S.Y.; Yun, S.Y.; Kim, H.S.; Kang, L.S. Imporved Method for Increasing Maintenance Efficiency of Construction Structure Using Augmented Reality by Marker-Less Method. J. Korean Soc. Civ. Eng. 2015, 35, 961–968. [Google Scholar]
- Nabil, E.B.; Rafika, H.; Zakaria, B.; Youssef, B.B.; Abderrazzaq, K. Assessment of 3D Models Placement Methods in Augmented Reality. Appl. Sci. 2022, 12, 10620. [Google Scholar]
- Kim, S.Y.; Kim, H.S.; Moon, H.S.; Kang, M.S. Field Applicability of Augmented Reality Technology by Marker Mapping for Construction Project (Focused on Measurement Process of Rebar Work). J. Korean Soc. Civ. Eng. 2013, 33, 2509–2518. [Google Scholar]
- Piroozfar, P.; Boseley, M.S.; Essa, M.A.; Farr, E.R.P.; Jin, R. The application of Augmented Reality (AR) in the Architecture Engineering and Construction (AEC) industry. In Proceedings of the Tenth International Conference on Construction in the 21st Century (CITC-10), Colombo, Sri Lanka, 2–4 July 2018. [Google Scholar]
- Kodeboyina, S.M.; Varghese, K. Low cost augmented reality framework for construction applications. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn, AL, USA, 18–21 July 2016; Volume 33, pp. 1–9. [Google Scholar]
- Omar, T.; Nehdi, M.L. Data acquisition technologies for construction progress tracking. Autom. Constr. 2016, 70, 143–455. [Google Scholar] [CrossRef]
- Kim, J.; Irizarry, J. Assessing the effectiveness of augmented reality on the spatial skills of postsecondary construction management students in the U.S. In Proceedings of the 34th International Symposium on Automation and Robotics in Construction, Taipei, Taiwan, 28 June–1 July 2017; Volume 34, pp. 173–180. [Google Scholar]
- Mahmood, B.; Han, S.; Lee, D.E. BIM-Based Registration and Localization of 3D Point Clouds of Indoor Scenes Using Geometric Features for Augmented Reality. Remote Sens. 2020, 12, 2302. [Google Scholar] [CrossRef]
- Bikash, L.; Kyosuke, K. Development and Implementation of AR Application for the Advancement of the Tasks in the Construction sites. In KaTRI Annual Report; Kajima Technical Research Institute: Tokyo, Japan, 2019; Volume 67, pp. 160–165. [Google Scholar]
- Ricardo, L.M.; Cesar, V. Conceptual Framework for Integrating BIM and Augmented Reality in Construction Management. J. Constr. Eng. Manag. 2020, 26, 83–94. [Google Scholar]
- Heo, K.J.; Lee, S.J.; Jung, S.K. A Study of Augmented Reality based Visualization using Shape Information of Building Information Modeling. Spat. Inf. Res. 2012, 20, 1–11. [Google Scholar]
- Han, M.Y.; Beak, K.Y.; Lee, K.T.; Ko, S.J.; Kim, J.H. A Study on Supporting Design Decision Making in Office Building Remodeling Projects by Introducing Mixed Reality. Korean J. Constr. Eng. Manag. 2021, 9, 1–9. [Google Scholar]
- Lee, M.J.; Lee, H.M.; Lee, I.S.; Nam, S.H. Augmented Reality for Construction Industry: Focused on BIM based Electronic Standard Drawing. J. Korean Soc. Steel Constr. 2017, 29, 12–16. [Google Scholar]
- Schiavi, B.; Havard, V.; Karim, B.; David, B. BIM data flow architecture with AR/VR technologies: Use cases in architecture. Autom. Constr. 2022, 134, 104054. [Google Scholar] [CrossRef]
- Lee, K.H.; Park, J.W.; Kang, H.J.; Shin, D.H. Seamless Superimposition Technique of Virtual Objects for AR System of Excavator Based on Image Processing. Korean J. Constr. Eng. Manag. 2017, 18, 21–29. [Google Scholar] [CrossRef]
- Pham, H.; Nguyen, L.; Lee, Y.J.; Park, M.W.; Song, E.S. Augmented Rality Framework to Visualize Information about Construction Resources Based on Object Detection. J. Korean Inst. Build. Inf. Model. 2021, 11, 45–54. [Google Scholar]
- Schall, G.; Zollmann, S.; Reitmayr, G. Smart Vidente: Advances in mobile augmented reality for interactive visualization of underground infrastructure. Pers. Ubiquitous. Comput. 2013, 17, 1533–1549. [Google Scholar] [CrossRef]
- Agarwal, S. Review on Application of Augmented Reality in Civil Engineering. In Proceedings of the ICIDRET, Emporium Building, New Delhi, India, 12–13 February 2016. [Google Scholar]
- Chalhoub, J.; Ayer, S.K. Perception of industry professionals about Mixed Reality for electrical prefabrication. In Proceedings of the CSCE Annual General Conference, Vancouver, BC, Canada, 31 May–3 June 2017. [Google Scholar]
- Chalhoub, J.; Ayer, S.K. Using Mixed Reality for electrical construction design communication. Autom. Constr. 2018, 86, 1–10. [Google Scholar] [CrossRef]
- Chu, M.; Matthews, J.; Love, P.E. Integrating mobile Building Information Modelling and Augmented Reality systems: An experimental study. Autom. Constr. 2018, 85, 305–316. [Google Scholar] [CrossRef]
- Shin, J.S.; Choi, J.P. Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm. Korean J. Constr. Eng. Manag. 2019, 20, 52–60. [Google Scholar]
- Park, S.Y.; Song, J.H.; Oh, K.S. Development of Construction Schedule Management System based on BIM. Korean J. Architect. Inst. 2018, 34, 61–68. [Google Scholar]
- Lee, C.K.; Sin, S.Y.; Issa, R.R. Classification of a Free-Form Surface by Parametric Design and Machine Learning. In Proceedings of the Construction Research Congress, Tempe, AZ, USA, 8–10 March 2020. [Google Scholar]
- Yoon, J.W.; Kim, S.S.; Lee, S.H. A Study on the Development of Dynamo Algorithm for Initial Schedule Creation Using BIM-based Space Division. In Proceedings of the KICEM Annual Conference, Seoul, Republic of Korea, 11–12 November 2021. [Google Scholar]
- Lee, Y.J.; Kim, J.Y.; Phan, H.; Park, M.W. Augmented Reality Framework for Efficient Access to Schedule Information on Construction Sites. J. Korean Inst. Build. Inf. Model. 2020, 10, 60–69. [Google Scholar]
- Chalhoub, J.; Alsafouri, S.; Ayer, S.K. Leveraging Site Survey Points for Mixed Reality BIM Visualization. In Proceedings of the Construction Research Congress 2018, New Orleans, LA, USA, 2–4 April 2018. [Google Scholar]
- Kieran, W.M.; Chandani, K.C.; Ochoa, J.J.; Gu, N.; James, W.; Ross, T.S.; Bruce, H.T. The Identification, Development, and Evaluation of BIM-ARDM: A BIM-Based AR Defect Management System for Construction Inspections. Buildings 2022, 12, 140. [Google Scholar]
- Kwon, O.S.; Park, C.S.; Lim, C.R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality. Autom. Constr. 2014, 46, 74–81. [Google Scholar] [CrossRef]
- Wang, K.C.; Chao, T.C.; Yu, P.Y. A BIM-based Augmented Reality System for Four-Dimensional Simulation. In Proceedings of the International Symposium on Nondestructive Testing in Civil Engineering, Zurich, Switzerland, 16–18 August 2022; Volume 9. [Google Scholar]
- Liu, Y.; Tanudjaja, G.; Jiang, Z.; Beck, N. Workflow of Exporting Revit Models to Unity; Penn State CIC Research Group: University Park, PA, USA, 2016; pp. 22–26. [Google Scholar]
- Garbett, J.; Thomas, H.; David, H. A multi-user collaborative BIM-AR system to support design and construction. Autom. Constr. 2021, 122, 103487. [Google Scholar] [CrossRef]
- Jeon, H.I.; Ko, B.J.; Kim, S.H.; Lee, K.E.; Yu, Y.S.; Koo, B.S. Establishment of Augmented Reality Based Building Element Information Visualization System using Unity 3D. In Proceedings of the KSCE 2020 Convention, Seogwipo-si, Republic of Korea, 21–23 October 2020. [Google Scholar]
Application Software and Hardware | Version | Function | ||
---|---|---|---|---|
Software | Autodesk Revit | 2019.2 | Classifying objects | |
Autodesk Revit, Dynamo | 1.3.4 | Reconstructing BIM 3D model Generating markers automatically | ||
Autodesk 3ds Max | 2020.3.6 | Designating reference coordinates | ||
Unity | 2020.3.12.f1 | Creating an application | ||
Hardware | PC | CPU | AMD Ryzen 5 3600 | Driving system |
RAM | 16.00GB | |||
GPU | NVIDIA GeForce GTX 1660 SUPER | |||
Smart Device | More than Android 7.0 | Testing system | ||
Samsung Galaxy S9 | Android 10.0 |
Schedule of Object & Corresponding Markers | |||||||
---|---|---|---|---|---|---|---|
(2) | (3) | (4) | |||||
Zone | Object | Order | Count | Work Code | Object ID | Marker | |
Before | After | ||||||
Zone 1 | Column | 1 | 4 | 0104 | |||
1C1 | 1C1_0104_1 | ||||||
Beam | 3 | 3 | 0104 | ||||
1B1 | 1B1_0104_3 | ||||||
Girder | 2 | 2 | 0104 | ||||
1G1 | 1G1_0104_2 | ||||||
Zone 2 | Column | 5 | 2 | 0104 | |||
2C1 | 2C1_0104_5 | ||||||
Beam | 7 | 3 | 0104 | ||||
2B1 | 2B1_0104_7 | ||||||
Girder | 6 | 2 | 0104 | ||||
2G1 | 2G1_0104_6 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Yoon, J.-W.; Lee, S.-H. Development of a Construction-Site Work Support System Using BIM-Marker-Based Augmented Reality. Sustainability 2023, 15, 3222. https://doi.org/10.3390/su15043222
Yoon J-W, Lee S-H. Development of a Construction-Site Work Support System Using BIM-Marker-Based Augmented Reality. Sustainability. 2023; 15(4):3222. https://doi.org/10.3390/su15043222
Chicago/Turabian StyleYoon, Jae-Wook, and Seung-Hyun Lee. 2023. "Development of a Construction-Site Work Support System Using BIM-Marker-Based Augmented Reality" Sustainability 15, no. 4: 3222. https://doi.org/10.3390/su15043222
APA StyleYoon, J. -W., & Lee, S. -H. (2023). Development of a Construction-Site Work Support System Using BIM-Marker-Based Augmented Reality. Sustainability, 15(4), 3222. https://doi.org/10.3390/su15043222