Su, T.; Huang, H.; Zhou, Y.; Yu, G.
Dam Operation for Mitigating Ice Jam Flooding Risks under the Adjustment of River Channel-Forms: Implications from an Evaluation in the Ningxia-Inner Mongolia Reach of the Upper Yellow River, China. Water 2019, 11, 1136.
https://doi.org/10.3390/w11061136
AMA Style
Su T, Huang H, Zhou Y, Yu G.
Dam Operation for Mitigating Ice Jam Flooding Risks under the Adjustment of River Channel-Forms: Implications from an Evaluation in the Ningxia-Inner Mongolia Reach of the Upper Yellow River, China. Water. 2019; 11(6):1136.
https://doi.org/10.3390/w11061136
Chicago/Turabian Style
Su, Teng, Heqing Huang, Yuanyuan Zhou, and Guoan Yu.
2019. "Dam Operation for Mitigating Ice Jam Flooding Risks under the Adjustment of River Channel-Forms: Implications from an Evaluation in the Ningxia-Inner Mongolia Reach of the Upper Yellow River, China" Water 11, no. 6: 1136.
https://doi.org/10.3390/w11061136
APA Style
Su, T., Huang, H., Zhou, Y., & Yu, G.
(2019). Dam Operation for Mitigating Ice Jam Flooding Risks under the Adjustment of River Channel-Forms: Implications from an Evaluation in the Ningxia-Inner Mongolia Reach of the Upper Yellow River, China. Water, 11(6), 1136.
https://doi.org/10.3390/w11061136