Solving a Multimodal Routing Problem with Pickup and Delivery Time Windows under LR Triangular Fuzzy Capacity Constraints
Abstract
:1. Introduction
- (1)
- Both the pickup and delivery time windows are incorporated into the MRP to improve the time efficiency of the entire transportation process, in which early pickup and delayed delivery are forbidden, and the storage caused by delayed pickup and early delivery is minimized. Through this setting, the weaknesses of both soft and hard time windows are fixed.
- (2)
- The uncertainty of both travel capacities of transportation modes on the arcs and transfer capacities between different transportation modes at the nodes of the multimodal network is modeled by LR triangular fuzzy numbers (LRTFNs), in which we define the uncertainty level of the LR triangular fuzzy capacity (LRTFC).
- (3)
- Based on the chance-constrained linear programming (CCLP) model using the credibility measure, we analyze the influence of the confidence level and the uncertainty level on the MRPPDTWCU and summarize the insights that help multimodal transportation to deal with the uncertain environment.
2. Problem Description
3. Fuzzy Nonlinear Optimization Model for MRPPDTWCU
3.1. Symbols in the Model
- (1)
- Sets, indices, and parameters:
- (2)
- Variables
3.2. Fuzzy Nonlinear Optimization Model
- Equation (2) is the optimization objective of the MRPPDTWCU and aims to minimize the total costs of transportation that include travel costs, transfer costs, and storage costs at the origin and the destination.
- Equation (3) is the container flow equilibrium constraint.
- Equations (4) and (5) ensure that containers are unsplittable in the transportation process from the shipper to the receiver.
- Equations (6) and (7) ensure that the optimal route yields a smooth connection between the travel process on the selected arcs and the transfer process at the selected nodes. (Equations (3)–(7) are the general constraints of the MRP considering unsplittable flow [13]).
- Equation (8) ensures that container pickup time at the origin should be no earlier than the lower bound of the shipper’s pickup time window.
- Equation (9) calculates the storage period of the containers at the origin using a continuous piecewise linear function.
- Equation (10) determines the container delivery time.
- Equation (11) ensures that the container delivery time at the destination should be no later than the upper bound of the receiver’s delivery time window.
- Equation (12) uses the same function as Equation (9) to present the storage period of the containers at the destination.
- Equations (13) and (14) ensure that the container volume does not exceed the LRTFCs of the optimal route.
- Equations (15)–(20) are the variable domain constraints.
4. Model Defuzzification and Linearization
5. Numerical Case Verification
6. Conclusions
- (1)
- The modeling of pickup and delivery time windows is able to provide both the shipper and the receiver with on-time transportation services. Such a consideration also enables the shipper, receiver, and MTO to make a balance between the travel and transfer costs and the storage costs to realize the cost minimization.
- (2)
- Compared to the deterministic modeling, the MRP under capacity uncertainty enables the shipper, receiver, and MTO to make more flexible decisions, in which they can make tradeoffs between the economy and reliability of transportation.
- (3)
- The capacity uncertainty shows a significant influence on the MRPPDTWCU from two aspects. The first is the confidence level that is introduced into the MRPPDTWCU by the FCCP and reflects the reliability of transportation, and the second is the uncertainty level of the fuzzy capacities.
- (4)
- Improving the confidence level to achieve a reliable multimodal route scarifies the transportation economy. Therefore, the shipper and the receiver should make tradeoffs between the reliability and economic objectives by determining a suitable confidence level, in which the sensitivity shown in Figure 2 can provide a solid reference. Then, the MTO can plan the optimal route based on their demand using the proposed model.
- (5)
- To address the higher uncertainty level of the fuzzy capacity, the shipper and the receiver need to increase their transportation budget. To help them reduce the budget and meanwhile maintain a high confidence level to ensure reliable transportation, the MTO needs to use transportation services and transfer services with stable capacities.
Author Contributions
Funding
Data Availability Statement
Conflicts of Interest
References
- Wang, Q.Z.; Chen, J.M.; Tseng, M.L.; Luan, H.M.; Ali, M.H. Modelling green multimodal transport route performance with witness simulation software. J. Clean. Prod. 2020, 248, 119245. [Google Scholar] [CrossRef]
- Sun, Y.; Sun, G.; Huang, B.; Ge, J. Modeling a carbon-efficient road–rail intermodal routing problem with soft time windows in a time-dependent and fuzzy environment by chance-constrained programming. Systems 2023, 11, 403. [Google Scholar] [CrossRef]
- Macharis, C.; Bontekoning, Y.M. Opportunities for OR in intermodal freight transport research: A review. Eur. J. Oper. Res. 2004, 153, 400–416. [Google Scholar] [CrossRef]
- Caris, A.; Macharis, C.; Janssens, G.K. Decision support in intermodal transport: A new research agenda. Comput. Ind. 2013, 64, 105–112. [Google Scholar] [CrossRef]
- Shahedi, A.; Gallo, F.; Saeednia, M.; Sacco, N. Lead-time-based freight routing in multi-modal networks considering the Physical Internet. J. Supply Chain Manag. Sci. 2023, 4, 61–80. [Google Scholar] [CrossRef]
- Verma, M.; Verter, V. A lead-time based approach for planning rail-truck intermodal transportation of dangerous goods. Eur. J. Oper. Res. 2010, 202, 696–706. [Google Scholar] [CrossRef]
- Dua, A.; Sinha, D. Quality of multimodal freight transportation: A systematic literature review. World Rev. Intermodal Transp. Res. 2019, 8, 167–194. [Google Scholar] [CrossRef]
- Sun, Y.; Hrušovský, M.; Zhang, C.; Lang, M. A time-dependent fuzzy programming approach for the green multimodal routing problem with rail service capacity uncertainty and road traffic congestion. Complexity 2018, 2018, 8645793. [Google Scholar] [CrossRef]
- Zhang, D.; He, R.; Li, S.; Wang, Z. A multimodal logistics service network design with time windows and environmental concerns. PLoS ONE 2017, 12, e0185001. [Google Scholar] [CrossRef] [PubMed]
- Zhang, X.; Jin, F.Y.; Yuan, X.M.; Zhang, H.Y. Low-carbon multimodal transportation path optimization under dual uncertainty of demand and time. Sustainability 2021, 13, 8180. [Google Scholar] [CrossRef]
- Fazayeli, S.; Eydi, A.; Kamalabadi, I.N. Location-routing problem in multimodal transportation network with time windows and fuzzy demands: Presenting a two-part genetic algorithm. Comput. Ind. Eng. 2018, 119, 233–246. [Google Scholar] [CrossRef]
- Yuan, X.; Jiang, Y.; Zhang, X. Research on robust optimization of interval-based fuzzy intermodal transport paths under low-carbon policies. Ind. Eng. Manag. 2021, 26, 134–141. [Google Scholar]
- Li, X.; Sun, Y.; Qi, J.; Wang, D. Chance-constrained optimization for a green multimodal routing problem with soft time window under twofold uncertainty. Axioms 2024, 13, 200. [Google Scholar] [CrossRef]
- Tang, J.; Pan, Z.; Fung, R.Y.; Lau, H. Vehicle routing problem with fuzzy time windows. Fuzzy Sets Syst. 2009, 160, 683–695. [Google Scholar] [CrossRef]
- Dragomir, A.G.; Doerner, K.F. Solution techniques for the inter-modal pickup and delivery problem in two regions. Comput. Oper. Res. 2020, 113, 104808. [Google Scholar] [CrossRef]
- Sun, Y. Fuzzy approaches and simulation-based reliability modeling to solve a road–rail intermodal routing problem with soft delivery time windows when demand and capacity are uncertain. Int. J. Fuzzy Syst. 2020, 22, 2119–2148. [Google Scholar] [CrossRef]
- Qi, Y.; Harrod, S.; Psaraftis, H.N.; Lang, M. Transport service selection and routing with carbon emissions and inventory costs consideration in the context of the Belt and Road Initiative. Transp. Res. Part E Logist. Transp. Rev. 2022, 159, 102630. [Google Scholar] [CrossRef]
- Zhang, Y.; Guo, W.; Negenborn, R.R.; Atasoy, B. Synchromodal transport planning with flexible services: Mathematical model and heuristic algorithm. Transp. Res. Part C Emerg. Technol. 2022, 140, 103711. [Google Scholar] [CrossRef]
- Delbart, T.; Molenbruch, Y.; Braekers, K.; Caris, A. Uncertainty in intermodal and synchromodal transport: Review and future research directions. Sustainability 2021, 13, 3980. [Google Scholar] [CrossRef]
- Lu, K.; Liao, H.; Zavadskas, E.K. An overview of fuzzy techniques in supply chain management: Bibliometrics, methodologies, applications and future directions. Technol. Econ. Dev. Econ. 2021, 27, 402–458. [Google Scholar] [CrossRef]
- Hosseini, A.; Pishvaee, M.S. Capacity reliability under uncertainty in transportation networks: An optimization framework and stability assessment methodology. Fuzzy Optim. Decis. Mak. 2022, 21, 479–512. [Google Scholar] [CrossRef]
- Huang, Y. A two-stage stochastic model for intermodal transportation operational planning problem under capacity shortage. In Proceedings of the 2021 IEEE International Conference on Recent Advances in Systems Science and Engineering (RASSE), Shanghai, China, 12–14 December 2021; pp. 1–9. [Google Scholar]
- Uddin, M.; Huynh, N. Reliable routing of road-rail intermodal freight under uncertainty. Netw. Spat. Econ. 2019, 19, 929–952. [Google Scholar] [CrossRef]
- Uddin, M.; Huynh, N.N.; Ahmed, F. Assignment of freight traffic in a large-scale intermodal network under uncertainty. Highlights Sustain. 2024, 3, 1–15. [Google Scholar] [CrossRef]
- Zimmermann, H.J. Applications of fuzzy set theory to mathematical programming. In Readings in Fuzzy Sets for Intelligent Systems; Elsevier: Amsterdam, The Netherlands, 1993; pp. 795–809. [Google Scholar]
- Lu, Y.; Lang, M.; Sun, Y.; Li, S. A fuzzy intercontinental road-rail multimodal routing model with time and train capacity uncertainty and fuzzy programming approaches. IEEE Access 2020, 8, 27532–27548. [Google Scholar] [CrossRef]
- Sun, Y.; Yu, N.; Huang, B. Green road–rail intermodal routing problem with improved pickup and delivery services integrating truck departure time planning under uncertainty: An interactive fuzzy programming approach. Complex Intell. Syst. 2022, 8, 1459–1486. [Google Scholar] [CrossRef]
- Zarandi, M.H.F.; Hemmati, A.; Davari, S. The multi-depot capacitated location-routing problem with fuzzy travel times. Expert Syst. Appl. 2011, 38, 10075–10084. [Google Scholar] [CrossRef]
- Sakawa, M.; Nishizaki, I.; Uemura, Y. Interactive fuzzy programming for multi-level linear programming problems with fuzzy parameters. Fuzzy Sets Syst. 2000, 109, 3–19. [Google Scholar] [CrossRef]
- Kundu, P.; Kar, S.; Maiti, M. Multi-objective multi-item solid transportation problem in fuzzy environment. Appl. Math. Model. 2013, 37, 2028–2038. [Google Scholar] [CrossRef]
- Bierwirth, C.; Kirschstein, T.; Meisel, F. On transport service selection in intermodal rail/road distribution networks. Bus. Res. 2012, 5, 198–219. [Google Scholar] [CrossRef]
- Wang, Z.X.; Liu, Y.J.; Fan, Z.P.; Feng, B. Ranking L–R fuzzy number based on deviation degree. Inf. Sci. 2009, 179, 2070–2077. [Google Scholar] [CrossRef]
- Zhou, J.; Yang, F.; Wang, K. Fuzzy arithmetic on LR fuzzy numbers with applications to fuzzy programming. J. Intell. Fuzzy Syst. 2016, 30, 71–87. [Google Scholar] [CrossRef]
- Compaoré, A.; Somé, K.; Poda, J.; Somé, B. Efficiency of MOMA-Plus method to solve some fully fuzzy LR triangular multiobjective linear programs. J. Math. Res. 2018, 10, 77–87. [Google Scholar] [CrossRef]
- Gani, A.N.; Duraisamy, C.; Veeramani, C. A note on fuzzy linear programming problem using LR fuzzy number. Int. J. Algorithms Comput. Math. 2009, 2, 93–106. [Google Scholar]
- Xu, J.; Zhou, X. Approximation based fuzzy multi-objective models with expected objectives and chance constraints: Application to earth-rock work allocation. Inf. Sci. 2013, 238, 75–95. [Google Scholar] [CrossRef]
- Zheng, Y.; Liu, B. Fuzzy vehicle routing model with credibility measure and its hybrid intelligent algorithm. Appl. Math. Comput. 2006, 176, 673–683. [Google Scholar] [CrossRef]
- Zhu, H.; Zhang, J. A credibility-based fuzzy programming model for APP problem. In Proceedings of the 2009 International Conference on Artificial Intelligence and Computational Intelligence, Shanghai, China, 7–8 November 2009; Volume 1, pp. 455–459. [Google Scholar]
- Peykani, P.; Hosseinzadeh Lotfi, F.; Sadjadi, S.J.; Ebrahimnejad, A.; Mohammadi, E. Fuzzy chance-constrained data envelopment analysis: A structured literature review, current trends, and future directions. Fuzzy Optim. Decis. Mak. 2022, 21, 197–261. [Google Scholar] [CrossRef]
- Roshanaei, V.; Luong, C.; Aleman, D.M.; Urbach, D.R. Reformulation, linearization, and decomposition techniques for balanced distributed operating room scheduling. Omega 2020, 93, 102043. [Google Scholar] [CrossRef]
- Sun, Y.; Lang, M. Bi-objective optimization for multi-modal transportation routing planning problem based on Pareto optimality. J. Ind. Eng. Manag. 2015, 8, 1195–1217. [Google Scholar] [CrossRef]
- Xiong, G.; Wang, Y. Best routes selection in multimodal networks using multi-objective genetic algorithm. J. Comb. Optim. 2014, 28, 655–673. [Google Scholar] [CrossRef]
Transportation Modes | Travel Costs (CNY/TEU) | Travel Time (h) |
---|---|---|
Rail | ||
Road | ||
Water |
Transfer Types | Transfer Time (h/TEU) | Transfer Costs (CNY/TEU) |
---|---|---|
Rail~Road | 0.067 | 5 |
Rail~Water | 0.133 | 7 |
Road~Water | 0.100 | 10 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Ge, J.; Sun, Y. Solving a Multimodal Routing Problem with Pickup and Delivery Time Windows under LR Triangular Fuzzy Capacity Constraints. Axioms 2024, 13, 220. https://doi.org/10.3390/axioms13040220
Ge J, Sun Y. Solving a Multimodal Routing Problem with Pickup and Delivery Time Windows under LR Triangular Fuzzy Capacity Constraints. Axioms. 2024; 13(4):220. https://doi.org/10.3390/axioms13040220
Chicago/Turabian StyleGe, Jie, and Yan Sun. 2024. "Solving a Multimodal Routing Problem with Pickup and Delivery Time Windows under LR Triangular Fuzzy Capacity Constraints" Axioms 13, no. 4: 220. https://doi.org/10.3390/axioms13040220
APA StyleGe, J., & Sun, Y. (2024). Solving a Multimodal Routing Problem with Pickup and Delivery Time Windows under LR Triangular Fuzzy Capacity Constraints. Axioms, 13(4), 220. https://doi.org/10.3390/axioms13040220