Vassena, G.P.M.; Perfetti, L.; Comai, S.; Mastrolembo Ventura, S.; Ciribini, A.L.C.
Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices. Buildings 2023, 13, 2488.
https://doi.org/10.3390/buildings13102488
AMA Style
Vassena GPM, Perfetti L, Comai S, Mastrolembo Ventura S, Ciribini ALC.
Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices. Buildings. 2023; 13(10):2488.
https://doi.org/10.3390/buildings13102488
Chicago/Turabian Style
Vassena, Giorgio P. M., Luca Perfetti, Sara Comai, Silvia Mastrolembo Ventura, and Angelo L. C. Ciribini.
2023. "Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices" Buildings 13, no. 10: 2488.
https://doi.org/10.3390/buildings13102488
APA Style
Vassena, G. P. M., Perfetti, L., Comai, S., Mastrolembo Ventura, S., & Ciribini, A. L. C.
(2023). Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices. Buildings, 13(10), 2488.
https://doi.org/10.3390/buildings13102488