Zhu, Q.; Xi, J.; Hu, X.; Chong, H.-Y.; Zhou, Y.; Lyu, S.
Stakeholder Mapping and Analysis of Off-Site Construction Projects: Utilizing a Power–Interest Matrix and the Fuzzy Logic Theory. Buildings 2024, 14, 2865.
https://doi.org/10.3390/buildings14092865
AMA Style
Zhu Q, Xi J, Hu X, Chong H-Y, Zhou Y, Lyu S.
Stakeholder Mapping and Analysis of Off-Site Construction Projects: Utilizing a Power–Interest Matrix and the Fuzzy Logic Theory. Buildings. 2024; 14(9):2865.
https://doi.org/10.3390/buildings14092865
Chicago/Turabian Style
Zhu, Qing, Jiade Xi, Xin Hu, Heap-Yih Chong, Yijun Zhou, and Sainan Lyu.
2024. "Stakeholder Mapping and Analysis of Off-Site Construction Projects: Utilizing a Power–Interest Matrix and the Fuzzy Logic Theory" Buildings 14, no. 9: 2865.
https://doi.org/10.3390/buildings14092865
APA Style
Zhu, Q., Xi, J., Hu, X., Chong, H. -Y., Zhou, Y., & Lyu, S.
(2024). Stakeholder Mapping and Analysis of Off-Site Construction Projects: Utilizing a Power–Interest Matrix and the Fuzzy Logic Theory. Buildings, 14(9), 2865.
https://doi.org/10.3390/buildings14092865