Wu, R.; Wu, Y.; Sun, B.; Zhou, G.; Zheng, L.
Monitoring of Overburden Failure with a Large Fractured-Height Working Face in a Deep Jurassic Coal Seam Based on the Electric Method. Appl. Sci. 2024, 14, 10293.
https://doi.org/10.3390/app142210293
AMA Style
Wu R, Wu Y, Sun B, Zhou G, Zheng L.
Monitoring of Overburden Failure with a Large Fractured-Height Working Face in a Deep Jurassic Coal Seam Based on the Electric Method. Applied Sciences. 2024; 14(22):10293.
https://doi.org/10.3390/app142210293
Chicago/Turabian Style
Wu, Rongxin, Yuze Wu, Binyang Sun, Guanqun Zhou, and Leilei Zheng.
2024. "Monitoring of Overburden Failure with a Large Fractured-Height Working Face in a Deep Jurassic Coal Seam Based on the Electric Method" Applied Sciences 14, no. 22: 10293.
https://doi.org/10.3390/app142210293
APA Style
Wu, R., Wu, Y., Sun, B., Zhou, G., & Zheng, L.
(2024). Monitoring of Overburden Failure with a Large Fractured-Height Working Face in a Deep Jurassic Coal Seam Based on the Electric Method. Applied Sciences, 14(22), 10293.
https://doi.org/10.3390/app142210293