Next Article in Journal
The Role of Extracellular Vesicles in Osteoporosis: A Scoping Review
Next Article in Special Issue
Permeation Increases Biofilm Development in Nanofiltration Membranes Operated with Varying Feed Water Phosphorous Concentrations
Previous Article in Journal
MOF-Derived Nanoporous Carbon Incorporated in the Cation Exchange Membrane for Gradient Power Generation
Previous Article in Special Issue
Tailor-Made Modification of Commercial Ceramic Membranes for Environmental and Energy-Oriented Gas Separation Applications
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Can Large-Scale Offshore Membrane Desalination Cost-Effectively and Ecologically Address Water Scarcity in the Middle East?

1
STEP Consulting GmbH, Eupener Str. 30, 52066 Aachen, Germany
2
Institute of Environmental Engineering, Rheinisch-Westfälische Technische Hochschule Aachen University, Mies-van-der-Rohe Straße 1, 52074 Aachen, Germany
3
Aachener Verfahrenstechnik—Chemical Process Engineering, Rheinisch-Westfälische Technische Hochschule Aachen University, Forckenbeckstr. 51, 52074 Aachen, Germany
*
Author to whom correspondence should be addressed.
Membranes 2022, 12(3), 323; https://doi.org/10.3390/membranes12030323
Submission received: 22 February 2022 / Revised: 8 March 2022 / Accepted: 10 March 2022 / Published: 14 March 2022
(This article belongs to the Special Issue Honorary Issue for Prof. Dr. Anastasios Karabelas)

Abstract

:
The Middle East will face tremendous water scarcity by 2050, which can only be mitigated by large-scale reverse osmosis seawater desalination. However, the coastal land in the region is rare and costly, so outsourcing the desalination facility to artificial islands could become a realistic scenario. This study investigated the ecological and economic challenges and possible advantages of that water supply option by analysing conceptual alternatives for offshore membrane-based desalination plants of up to 600 MCM/y capacity. Key environmental impacts and mitigation strategies were identified, and a detailed economic analysis was conducted to compare the new approach to state-of-the-art. The economic analysis included calculating the cost of water production (WPC) and discussing the differences between offshore alternatives and a conventional onshore desalination plant. In addition, the study investigated the impact of a changing energy mix and potential carbon tax levels on the WPC until 2050. The results indicate that offshore desalination plants have ecological advantages compared to onshore desalination plants. Furthermore, the construction cost for the artificial islands has a much lower effect on the WPC than energy cost. In contrast, the impact of potential carbon tax levels on the WPC is significant. The specific construction cost ranges between 287 $/m2 and 1507 $/m2 depending on the artificial island type and distance to the shoreline, resulting in a WPC between 0.51 $/m3 and 0.59 $/m3. This work is the first to discuss the environmental and economic effects of locating large-scale seawater desalination plants on artificial islands.

1. Introduction

Water scarcity is of growing concern in many parts of the world, causing social and economic stress [1]. Arid and semi-arid regions will especially face tremendous shortcomings in water supply due to population growth and climate change. In Middle East countries such as Jordan and Palestine, the public and industrial freshwater deficits will likely be 1300 million cubic meters per year (MCM/y) in 2050, indicated recently by the SALAM initiative [2]. The SALAM initiative is a multi-lateral research project investigating innovative transboundary water transfer strategies between Israel, Jordan, and Palestine. In this respect, building large-scale seawater desalination plants at the Israelian coastline could be an essential part of the regional solution to produce and transfer the needed freshwater to the demand centres in Jordan and Palestine [3,4]. The water cost for desalination and especially water transport from the Mediterranean Sea to the main demand centre of Amman in the North of Jordan are much lower than Red Sea options [5].
Nowadays, reverse osmosis (RO) is the dominant technology for the realisation of large-scale seawater desalination plants due to its technical maturity and scalability [6]. The fundamentals of RO became common knowledge, and process innovations led to a significant decrease in energy demand from 20 kWh/m3 to 2.5–4 kWh/m3 [6,7,8,9]. Improvements in the efficiency of high-pressure pumps and energy recovery devices are still possible [9,10]. However, the required osmotic pressure limits the potential for further energy demand reduction. Therefore, desalination by reverse osmosis will always be an energy-intensive process [8]. In Israel, the existing desalination plants require a share of about 4 to 5% of the national energy demand. If fossil fuels are the basis for electricity production, the desalinated water has a very high carbon footprint between 0.4 and 6.7 kgCO2eq/m3 [11]. Israel plans to impose a carbon tax from 2023 to 2028, and so the cost of water production will likely increase if the energy mix remains fossil fuel-based [12]. Regarding climate change and the role that greenhouse gases play in it, future desalination plants will most likely be supplied with renewable energy [11]. In this respect, RO is the most appropriate technology for combining desalination with renewable energies since the energy demand is purely electrical [13].
However, environmental risks still exist concerning the intake and brine discharge of onshore desalination plants. Brine discharge can negatively impact marine ecosystems and water and sediment quality due to higher salinity and temperature, and process chemicals [14]. These risks amplify when the desalination capacity needs to be expanded at a specific location. Conventional seawater reverse osmosis desalination plants have a specific footprint from 0.16 m2/(m3/d) (Sorek I facility in Israel) to 0.20 m2/(m3/d), depending on the plant capacity [15,16]. There is potential to reduce the specific footprint further by vertical design and shared spaces in a modular build large-scale plant. An innovative design including a shared central administration, shared chemical and spare part storage, and shared pre-treatment facilities may lead to further reductions in specific footprint. Still, such a large-scale desalination plant competes with urban development for land use, especially in densely populated areas. In Israel, past extensive development made the open coast scarce leading to economic, social, and environmental conflicts [17]. Discussions and public protests have already led to a significant delay in realising an additional onshore desalination plant next to Acre [18]. Conflicts around appropriate land use, especially at the coastline, will likely increase in the future due to population growth, and as land value rises worldwide. This concerns land values in coastal cities such as Singapore, Hong Kong, Dubai, and Tel Aviv [19,20].
Recovering land with offshore structures such as artificial islands can be an approach to counteract these conflicts. Large projects show the feasibility of successfully constructing and maintaining artificial islands for decades. For example, the Kansai Airport in Osaka bay is located up to 7 km from the shoreline and has been in operation since 1994. Recently, Denmark has approved the ambitious plan to build an artificial island 80 km offshore as a hub for surrounding offshore wind farms. The first stage is scheduled to operate by 2033 [21]. Researchers discussed the economic and environmental aspects of building an artificial island off the Israeli coast almost 30 years ago [22], followed by a preliminary assessment in 2002 of constructing an airport offshore of Tel Aviv [23]. In addition, the Center for Urban and Regional Studies at the Technion published an Israel marine plan with a new vision and recommendations for policy measures for the future usage of Israel’s marine space in 2015 [24]. Recovering land for offshore seawater desalination with a capacity of up to 600 MCM/y, as it would be essential to mitigate a major part of the regional water deficit, is a new approach. So far, only desalination concepts implemented on ships, drilling rigs, or small-scale floats have been discussed [25,26].
This article assesses the ecological and economic challenges and possible advantages of large-scale desalination plants realised on artificial islands. The economic analysis includes calculating the cost of water production for discussing the differences between the offshore alternatives and a reference onshore desalination plant. Furthermore, the impact of changes in the energy mix and potential carbon tax levels on the water production cost is investigated until 2050. The study highlights future research opportunities and needs to enhance international discussions on implementing the new membrane-based offshore desalination approach.

2. Methods

2.1. Case Study and Artificial Island Design

Potential options for large-scale desalination plants were determined considering the most appropriate feed points into the existing water transport network and the proximity to the essential demand centres in Israel and Jordan [4]. From all options, the so-called “Haifa option” was investigated due to its proximity to the demand centre in Haifa and the possibility of constructing a tunnel as a connection to Lake Tiberias as natural water storage and distributor to Jordan. This article focuses on the conceptual alternatives for potential large-scale desalination plants on artificial islands in the north of Haifa. Figure 1 shows the regional map of the considered areas and an excerpt from the relevant study concepts. The size of the artificial islands and the distances to shore are drawn to scale. The required area for the concepts was determined to be 344.500 m2, resulting in a length of 1060 m and a width of 325 m.
Three offshore alternatives are conceptually developed at the study location next to Shavei Zion. The intake of the desalination plants is located at a minimum distance of 1 km from the artificial islands. The outfall is located at a distance of 2 km. These distances are based on the experiences of Israeli desalination plants [27]. Table 1 shows the relevant alternatives investigated in the economic and ecological analysis. The water depth was derived from bathymetry data in the Navionics [28].
The marine structure needs to ensure a stable base for protecting the investment in the large-scale seawater desalination plant for at least 50 years. Therefore, the detailed engineering design of marine structures includes the investigation of extreme design conditions (winds, waves, currents, tides), the geotechnical properties (soil mechanics and seismicity), the static design of structural elements, the environmental effects (water circulation, sediment transport) and construction and operational costs [29].
The artificial island’s conceptual design is based on collected and arranged raw wind data from NCEP (National Centers for Environmental Prediction) by the NOAA CFSR Global Model, including hourly average wind speeds and directions given in 1 h intervals for the period between 1994 and 2019 (227,905 lines of data) [30]. The associated significant wave heights were determined from wind speeds, fetch lengths, and storm durations using the simplified CERC Wave Prediction Nomogram (also known as Hassellmann Nomogram) for predicting waves in deep water according to the USACE-Shore Protecting Manual [31]. Given that the fetch lengths are high, the waves were calculated as duration limited. The extreme significant wave heights for different annual return periods and the generation of extreme value distributions were analysed by the Gumbel Distribution [32]. The design wave period has been taken as Ts = 13.0 s and Tm = 11.4 s for a characteristic wave steepness (height/length) of 0.04. The transformed significant wave height of the 100 year return period at a −30 m water depth contour was calculated by considering shoaling. The artificial islands were designed according to conventional rubble mound breakwaters. Rubble mound breakwaters are advantageous since their outer slopes force storm waves to dissipate energy effectively [29]. Additionally, necessary rocks are generally available, and local quarries can supply the stones. The water depth for the economically viable realisation of rubble mound breakwaters is limited to −30 m water depth [33]. Figure 2 shows the conceptual cross-section design of alternative No. 3—5 km offshore from the shoreline of Shavei Zion.
The artificial islands were conceptually designed using granular non-categorised material as reclamation fill protected and stabilised by an outer seawall (Figure 2) [33]. The outer seawall consists of a geotextile filter, core fill formed with quarry run, several filter layers, and an armour layer with concrete blocks. The armour layer protects the structure from erosion by currents and waves. Accropode II blocks were selected for the present study and were designed according to the CLI- Calculator based on the Hudson formula [34]. The filter layers underneath the armour layer prevent the core fill from washing out and protect the sub-layers from erosion. The first filter layer underneath the armour layer was selected according to the Accropode II Design Guideline [35]. According to standard filtering rules, the secondary filter layer was selected [29]. The crest elevation of the structure was determined according to wave run-up and overtopping calculations [29,31]. The artificial island should have a toe structure to ensure its stability by preventing scouring, undermining, and supporting against sliding. The geotextile between the core and reclamation fill has a filter and separation function that prevents washing out [29]. Seismicity and soil mechanics were not considered, so there may be a soil improvement requirement for these concepts, which may increase the investment cost. However, for a conceptual artificial island next to Tel Aviv, the seismic risk was stated to be low [36].

2.2. Desalination Project Context and Design

After the conceptual design of the artificial island, the question of the context of the desalination plant arises. Facilities must be built on the artificial island for all important process steps needed in a conventional onshore desalination plant. Figure 3 shows the most important process components that were considered.
The desalination plant is supplied with seawater via an intake screen system to minimise impingement and entrainment of marine organisms (STEP 1). Via intake piping, seawater is pumped through a second finer screen to the intake pump station (STEP 2). Within the pre-treatment, suspended solids, colloids, and organics are removed by clarification if necessary. However, the RO membranes only allow turbidity of <0.2 NTU and a silt density index (SDI) < 3–5 [6], which can be reached by ultrafiltration or multi-media filters within the pre-treatment (STEP 3). The reverse osmosis system was selected as a two-pass configuration in which the permeate from the first-pass is pressed through a second RO membrane pass (STEP 4). This is particularly important for boron removal using the product water as drinking water or agricultural water. The World Health Organisation recommends keeping the boron concentration in drinking water from desalination below 2.4 mg/L [37]. However, in agricultural water, the critical boron concentration varies with plant type, so values around 0.5 mg/L can already be critical [38,39]. In this respect, two pass systems showed their feasibility in effectively removing boron below the critical limits [6]. Figure 4 shows a simplified flow chart of the two-pass reverse osmosis system combined with energy recovery.
Cartridge filters serve as safety filters to prevent the membranes from being damaged by unseparated particles in the pre-treatment (Figure 3). Energy recovery devices are essential for reducing the total energy demand of the RO desalination process. Alkalinisation, remineralisation, pH adjustment, and disinfection are essential post-treatment steps to make the product water fulfill drinking water requirements (STEP 5). Concentrates and rinse water from the RO process and the pre-treatment are returned to the sea in an outfall system (STEP 6). In contrast to onshore desalination, the power supply must be provided via submarine cables and can be laid in parallel to the product water piping to the coast. All chemicals and additives, for example, antiscalants, must be brought to the island and stored there to optimise operations.
Private sector participation, including market-oriented tendering, is essential to reach competition, leading to fair-priced bids for the site-specific desalination project. Therefore, the membrane-based desalination plant was assumed to be procured according to the Build-Operate-Transfer scheme (BOT). BOT projects are essentially attractive for the private sector since governments provide take-or-pay guarantees reducing the commercial risk [40]. The engineering design, the permission, and the tendering of the artificial island can be expected to take two years, followed by a three-year construction phase. The design and tendering of the desalination plant could be carried out in parallel. However, the desalination plant can only be built after finalising the artificial island, so an additional 2–3 years should be expected for its construction. Therefore, the project could be completed in 2030, assuming immediate realisation. Time delays due to extensive permitting delays were excluded. The technical parameters for the study membrane-based desalination plant are shown in Table 2.

2.3. Method for Water Production Cost Calculation

The water tariff is the price off-takers as water supplies, or bulk users have to pay for desalinated water integrated with the country’s water supply network. Depending on the country, water tariffs are subsidised based on political will [40,42], so it is unsuitable as a technical assessment standard. Therefore we calculated the water production cost (WPC) excluding potential revenues of contractors’ subsidies.
The WPC depends on the yearly fixed and variable costs for operation and maintenance and the financing costs (Figure 5).
The main difference in investment cost between onshore and offshore desalination is in the price for land acquisition compared to the construction cost and piping for the artificial islands. The project’s financing structure can include loans, equity, and potential sponsoring, resulting in the annuity essential in calculating the WPC. The WPC in $/m3 was calculated according to Equation (1) [43]:
W P C = A n n u i t y + O & M f i x + O & M v a r C a p a c i t y
whereas the Annuity [$/y] depends on the financing strategy according to Equation (2):
A n n u i t y = C a p e x S p o n s o r i n g i   1 + i n 1 + i n 1  
Equation (2) includes the interest and repayment rate (i (%)) and the funding period (n (years)).

2.4. Cost Calculation Assumptions for the Desalination Project and Energy Mix

Potential donors may provide equity, reducing the financial expenditures for the desalination project. For example, in the case of the Ashkelon desalination facility, 24% of the capital costs were sponsored [44]. Due to the anticipated high investment cost, we considered a share of sponsoring of 10% (Table 3). According to Israel’s typical BOT contract periods, the funding period was expected to be 25 years [32]. For reasons of comparability, the artificial island was assumed to be financed 25 years like the desalination plant. Nevertheless, the lifetime of the artificial island can be expected to be 50 years. The detailed cost tables showing the specific cost components are attached in Appendix A (Figure A1, Figure A2, Figure A3 and Figure A4).
The cost of energy makes up the largest part of the variable O&M costs. Therefore, it was essential to determine the future energy mix and the Levelized Cost of Energy (LCOE). The LCOE is the average generation cost, including CAPEX and OPEX at the point of connection to the grid [46]. The specific cost for electricity generation from photovoltaics (PV) significantly decreased and is already less than fossil-fueled sources today [47], so it was selected as the most economical renewable energy source to combine with desalination.
For simplification, we assumed an energy mix from photovoltaics (PV) as a renewable energy source and from natural gas-fueled Combined Cycle Power Plants (CCPP) (Table 4). According to the ministry of energy intentions, it can be expected that the share of renewable energy in the energy mix will likely increase to 30% in 2030 [48]. The 2050 targets have been tightened recently, so Israel aims to be carbon neutral by 2050 [49]. This political decision means that net-zero carbon emissions in the energy sector must be achieved. Therefore, the study’s target share in renewable energy has been set to 100% in 2050 (Table 4). Possible compensatory measures or carbon capture and storage measures were neglected.
The decrease in PV LCOE for 2040 and 2050 was based on the findings from Vartiainen et al. since the solar radiation in the study region is comparable [46]. However, the share of renewable energy can only be increased beyond ~30% grid penetration by energy storage systems [50]. Today, the commercial deployment of large-scale energy storage systems such as batteries or hydrogen with fuel cells is limited due to high costs, scarce material, environmental issues, and the necessity for performance and reliability improvements [51,52]. In addition, not every energy storage technology is generally applicable, considering all economic, social, and ecological conditions. For example, the geographic conditions must fit especially for the large-scale realisation of hydro pump storage systems. Therefore, it can be expected that a broad range of energy storage systems will be in the future energy mix [52]. One of the promising technologies is solar electricity storage in molten salt storage combined with a turbine block [50]. The reduced LCOE of PV can compensate for efficiency losses from thermal to electrical energy. Compared to batteries, this concept is ready for immediate implementation and is not limited by materials availability [50]. For simplification, we assumed that the share of renewable energy above 30% is supplied by the combination of PV with a mature energy storage technology. Cost reductions can be expected in the long term due to economy of scale and higher market penetration, so we assumed a slight decrease in costs over the decades until 2050 [50,52,53].
The LCOE of CCPP highly depends on the capacity and price for natural gas, which makes the LCOE impossible to predict for the next decades. In addition, we neglected the higher cost due to lower capacity factors in the case that flexibility in operation is necessary for renewable energy integration. Therefore, we set the CCPPs LCOE to a constant value of 0.06 $/kWh, which is in the lower range of the calculations from the International Energy Agency in 2020 [54]. Depending on the plant’s efficiency, the specific carbon dioxide emissions range between 360 and 575 gCO2eq/kWhel for electricity generation. Upstream and downstream processes may also account for additional emissions of 60 to 130 gCO2eq/kWhel [55]. Therefore, we assumed this study’s specific carbon dioxide emissions to be 400 gCO2eq/kWhel.

3. Results and Discussion

3.1. Assessment of the Offshore Construction Cost

Within the preliminary design phase, the construction costs of the artificial islands were estimated with quantities and unit price rates [29]. Table 5 shows the cost estimate for the artificial island at −30 m water depth using actual unit price rates. In addition, the estimations for Alternatives No. 1 and No. 2 are attached to Appendix B (Table A1 and Table A2).
The reclamation fill unit price was assumed to be for import material from quarries. If it is environmentally viable, most reclamation fill material can be gathered by dredging seabed material around the offshore location, which may dramatically reduce the unit price for reclamation fill. There is further potential in price reductions due to the large reclamation fill volume needed [33]. Investigations indicated suitable reclamation fill material at a distance between −30 and −50 m water depth 3–5 km from the coastline offshore of Tel Aviv [23]. Assuming a 50% decrease in the reclamation fill unit price could reduce the total cost estimation to around 420 Mio. $, resulting in a specific construction cost of 1219 $/m2. The quantities and unit prices have been conservatively estimated, and the actual local prices may vary and need to be specified in the following design stage. The detailed design phase includes investigating nearby quarries and possible dredging locations. If no nearby quarry with the desired material exists, far quarries are explored considering the logistics and transportation costs.
The same approach was used to determine the construction cost of alternatives No. 1 and No. 2 (Table A1 and Table A2 in Appendix B). Their construction costs are expected to be lower due to significantly reduced quantities in filling materials. In the case of alternative No. 1, the required reclamation fill is only one-third (3,393,600 m3) compared to alternative No. 3, due to the significantly lower necessary crest height of +8 m than +14.4 m in alternative No. 3 and the different water depths. In addition, fewer amounts of stones, rocks, and accropodes are necessary since the side facing the land does not need protective structures. The costs for the reclamation fill, stones, or rocks for the filter layer can be expected to be lower due to the direct land connection, reducing the unit prices.
But how do the estimated costs compare to similar projects? The results indicate that the specific construction cost of the artificial islands No. 1, No. 2, and No 3 are 287 $/m2, 760 $/m2, and 1507 $/m2, respectively (Table 6). Several land reclamation and artificial island projects are planned and constructed worldwide, but not every project fits the type rubble-mounted breakwater study design. For this reason, we have selected comparable projects and listed the most important benchmarks. The construction costs have been discounted to the current price level where necessary. Table 6 shows the data of comparable artificial islands projects.
The artificial islands of the Upper Zakum [56,57] and the Sateh Al Razboot [58,59] oilfields are comparably designed projects that have shown their feasibility for almost ten years. The water depths at Upper Zakum range between −6 m and −13 m, located 84 km offshore of Abu Dhabi. All Upper Zakum artificial islands combined have a total footprint of ~1.68 km2, five times the size of the artificial islands in the present study. Likewise, the North Sea Wind Power Hub is an innovative project that could be realised between 2030 and 2050 within the North Sea [60]. The specific construction costs are lower than the costs calculated in this study due to the almost 18 times larger surface area leading to cost advantages due to economies of scale. A large cost reduction factor can also be that dredging material is directly available at the target location for the reclamation fill.
However, the influences can be well explained by comparing alternative No. 3 (~1507 $/m2) and the conceptual airport offshore of Tel Aviv (~1395 $/m2). The reclamation fill levels of 4 m above sea level and crest heights with 14.4 m for alternative No. 3 and 16 m for the offshore airport are comparable [23]. The most significant differences are the water depth and the financing that increased 20 years ago the indirect cost to 45% due to high interest for the capital cost during construction. Reducing the indirect cost leads to an adjusted specific cost of 1263 $/m2 for the offshore airport’s island in 2022. This means that depending on water depth, the cost estimate of Alternatives No. 2 and No. 3 is comparable according to ±10% design accuracy.
In combination with the seawater desalination plant, additional costs must be taken into account for intake and outfall piping as well as pipelines for transporting the product water to the shoreline. Table 7 shows the resulting construction cost for all alternatives, the pipeline lengths, and the resulting specific costs for piping.

3.2. Assessment of the Water Production Cost of the Offshore Alternatives

Large-scale desalination plants built on artificial islands compete with conventional onshore desalination plants. The results indicate that the water production cost (WPC) differs only slightly between the alternatives in 2030. Especially, the difference in the WPC between the onshore desalination plant and the most distant option from the shoreline (5 km offshore) is only ~0.08 $/m3 (Figure 6). The difference is ~48 Mio. $/y during the plant runtime for producing 600 MCM/y of freshwater mainly based on the annuities due to the artificial island construction cost, piping cost, and increased maintenance and repair expenditures.
The construction costs for the artificial island, so the WPC, directly correlate with the water depth due to the required filling material. The higher the water depth, the more filling material is necessary. Therefore, the difference in the cost for the filling material is ~140 Mio $ between alternative No. 2 and No. 3 due to the increase in water depth from −12 m to −30 m. Future projects need to consider the distance to the shore due to piping costs and the water depth.
In all alternatives, 64% (0.153 $/m3) of the variable O&M cost (0.240 $/m3) is on the cost of energy. Depending on the energy mix, additional carbon tax costs may arise in the future, increasing the WPC. Despite the increased capital cost due to the artificial islands and piping construction, the energy cost still has the most significant impact on the WPC. The result is in line with the energy cost of typical SWRO plants that are between 20–35% of the WPC [16].
In 2018, the WPC in seawater reverse osmosis plants ranged between 0.5 and 3 $/m3 (average 1.1 $/m3) depending on the capacity and local constraints as the feedwater salinity [16]. The tender for constructing the new Sorek II desalination plant with a capacity of 200 MCM/y even achieved a water price of 0.45 $/m3 in Israel [61]. Economics of scale, technical advancements in reducing the energy demand, competition in the tendering process, and favourable financing structure can be expected to have the most considerable influence on reaching such a low water price. Our results indicate that bringing the desalination plant to an offshore structure leads to a WPC in the range of today’s most economical plants. However, there are thresholds of the economy of scale for SWRO plants due to cost-effective sizes available on the market. The threshold for O&M costs is already reached at ~150–220 MCM/y capacity and for the SWRO investment costs for 73 MCM/y capacity [16]. Therefore, expanding the plant up to 600 MCM/year does not necessarily lead to a further reduction in investment costs.
Market-oriented tendering and procurement are essential to obtain offers for reasonably priced cost of water production. The WPC can only be kept low in case broader competition is reached. Therefore, it is advantageous to split the construction of the artificial island and the construction and operation of the desalination plant into two independent projects. This ensures that competition is achieved within the respective discipline. Build Operate Transfer (BOT) projects are especially advantageous for public utilities due to cost-effectiveness and precise transfer of risk to the public sector, including construction, technology, and operational risks [62,63]. However, the off-taker of the water purchasing agreements needs to ensure a continuous and reliable supply of electrical energy, connection to the water grid, and a solid land lease agreement [63]. For offshore desalination plants, this applies even more since the project is more complex.

3.3. Effect of a Carbon Tax on the Water Production Cost

Artificial islands are built for at least a 50 year lifetime. Therefore, their influence on the WPC must be evaluated in the context of governmental intentions to reduce carbon dioxide emissions significantly by 2050 [49]. Introducing a carbon tax can be a measure to achieve the essential carbon dioxide reductions, expecting carbon tax levels of up to 150 $/tCO2 in 2050 [64]. The results indicate that the WPC strongly increases depending on the share of renewables and the level of a carbon tax (Figure 7). The strongest increase happens if renewable energy is as low as 30% without additional energy storage technology (WPC 2030). Carbon tax levels of 50–100–150 $/tCO2 led to a rise in WPC of 7–14–21% compared to its absence.
This study assumed that energy storage technologies will increase the share in renewable energy to 65% in 2040 and 100% in 2050. In addition, we anticipated that global investments in renewable energies and storage would also lead to a slight reduction in their LCOE (Table 4). However, increasing the share of energy storage technologies in the energy mix in 2040 and 2050 will still lead to higher WPC than 2030. This leads to an optimisation potential of the energy mix from different sources for membrane-based desalination. Utilising wave energy and wind directly on the artificial island could reduce energy storage needs. Wave energy converters (WECs) could provide a reliable contribution to the supply, but there is still a need for research to reduce costs and bring the technologies to technical maturity [65,66].
Keeping the water tariffs predictable in the next decades will be important to ensure the planning security of companies and the population. Increasing the carbon tax level stepwise from 50–100–150 $/tCO2 from 2030 to 2050 leads to low rises in WPC of 7–7–0% (Figure 7). Israel and Jordan recently signed a declaration of intent to transfer 200 MCM/y of freshwater from Israel to Jordan in exchange for 600 MW electrical energy from PV [49]. Ways must be found to ensure a fair trade of water and energy, regardless of a changing energy mix and carbon tax levels, as this study showed. In this respect, bartering water from Israel against renewable energy from Jordan could also be a beneficial approach to exclude carbon tax levels from the water-energy agreements [67].

3.4. Determination of Threshold Carbon Tax Level to Provide the Incentive to Couple Desalination with Renewable Energy

What would be the threshold carbon tax level necessary to push the complete switch to renewable energies for desalination? This question could be essential to answering if an Independent Power Producer (IPP) for renewable energy generation is included in the desalination project. The results indicate a significant rise in the WPC in case the share of renewable energy in the energy mix will already increase in 2030 (Figure 8).
Between 25% and 50% renewable energy shares, a sharp drop in WPC can be seen, especially at a carbon tax level of 150 $/tCO2. A 25% increase in the renewable energy share reduces the WPC by 0.045 $/m3 due to the carbon tax savings. At the same time, the energy cost increases by only 0.031 $/m2, which explains the difference of 0.014 $/m3 in WPC.
For carbon tax levels of 50 and 100 $/tCO2, there is no financial incentive to increase the share of renewable energy beyond 25%. However, for a threshold carbon tax level of 150 $/tCO2, the lowest WPC is reached for a desalination plant entirely supplied by renewable energy, including storage. Based on the LCOE assumptions for 2030, the electricity generation cost of 0.093 $/kWh results in a WPC of 0.717 $/m3. Therefore, carbon tax levels would need to be higher than 150 $/tCO2 to incentivise switching to a 100% renewable energy supply. This threshold carbon tax level decreases to ~127 $/tCO2 in 2040 and 100 $/tCO2 in 2050 due to the calculated decline in LCOE for PV and energy storage technologies.

3.5. Identification of Environmental Impact and Mitigation Strategies

The construction of an artificial island is a particularly severe interference with nature. Therefore, in planning a large-scale offshore desalination plant, mitigation strategies need to be developed to reduce environmental risks and increase social acceptance.
During the construction phase, the impacts directly correlate with the size of the marine structure and the water depth at the construction site. The mining of filling material, the construction of pipelines, and the artificial island itself can disturb valuable ecosystems resulting in a loss of biodiversity and habitat. The facts mentioned above are even more critical if the area is rich in biodiversity [36,68,69]. However, artificial islands can serve as new habitats and enable the development of unique and highly diverse ecosystems [68].
Artificial islands can change coastal circulation and sediment dynamics, depending on their length and distance to shore. As a result, beach erosion can occur [70]. However, the impacts can be mitigated with countermeasures such as sand bypassing and beach nourishment. The latter is the process of supplying the beach with the sand that has been lost due to erosion. This is only a temporary solution and needs to be repeated every couple of years depending on the extent of the erosion. Therefore, measures against erosion require repeated investments and must be included in the costs when planning an artificial island [71]. An example of a large-scale beach nourishment project is the “Sand Motor” in the Netherlands: a large amount of sand has been piled up on the coast, which is then distributed along the coast by currents, wind, and waves [72]. It is crucial to avoid hindering the longshore sediment transport since the Israeli coast is already prone to erosion due to a negative sand balance [36,73]. Therefore, possible impacts on the coastal environment should be minimised during an artificial island’s planning phase. An adapted size, shape, and distance to shore can significantly reduce the environmental impact [22,36,74]. The proposed artificial island does not affect coastal circulation or sediment dynamics if it is located further than 2.5 km from the shoreline [70]. Figure 9 shows the resulting beach profile of an offshore structure close to the coastline in an extreme scenario.
The desalination process itself raises several environmental concerns. These include the intake of seawater, high energy consumption, and brine discharge. The seawater intake can adversely affect marine life through the impingement and entrainment of marine organisms, leading to biodiversity loss. Nevertheless, technical measures and innovations significantly reduce the impact. The reduction of intake velocity to 0.15 m/s reduces the impingement of fish and the risk of blocking [75]. In addition, innovative behavioural and mechanical barriers such as electric repel systems, filter screens, and fish return mechanisms should be implemented (Figure 10).
These measures effectively prevent the harm of fishes larger than 8–10 cm [77]. However, the entrainment of smaller organisms such as juvenile fish, larvae, or eggs can only be minimised by locating the intake site in a less biologically sensitive area. Many desalination plant intakes are located in coastal and nearshore zones, even though these environments are usually biologically productive areas. Less biologically rich offshore zones start at around 20 m of water depth [75]. Additionally, reducing the entrainment of particulate and dissolved organic matter would improve the intake water quality. This would result in less fouling on the membranes and therefore reduce the pre-treatment and amount of chemicals needed [14].
Brine discharge also negatively impacts marine ecosystems, particularly the water and sediment quality, through increased salinity, higher temperature, and chemicals [14]. Due to the high salt content, brine has a higher density than water, sinks into low mixing zones at the bottom, and does not dilute quickly. This will, in particular, harm benthic organisms [75]. An active diffuser system can improve the dilution rate and discharge the brine at an inclined angle. However, choosing a suitable discharge location is still the best option to reduce the environmental impact. Habitats for rare and endangered species and regions with high biological productivity should be avoided [14]. Areas that are well-flushed and have low biological productivity are the least sensitive to the contents of the brine and are therefore a suitable discharge location. These environments are usually found in a greater depth and, therefore, further away from the shoreline [75].
Other emissions such as noise and light and their environmental impacts must also be considered. However, noise emissions from state-of-the-art desalination plants have a minor environmental impact [78]. As mentioned above, seawater desalination using reverse osmosis has a high energy demand, which will have to be covered by renewable energies in the future. Depending on the location of the artificial island, renewable energy sources could be utilised. Wind energy turbines, solar panels, and wave energy converters may be implemented on the island. Such options would allow synergies to be exploited [79].

3.6. Qualitative Assessment of the Environmental Impact of the Alternatives

Figure 11 shows the qualitative assessment of the alternatives and an onshore plant against criteria based on the identified environmental impacts. The alternatives were classified according to four colour gradations—the darker the box, the more severe the environmental impact. Blanked boxes indicate that there is no effect.
Table 1 is especially high due to the disturbance of valuable coastal ecosystems and significant changes in coastal circulation and sediment dynamics. Changes in coastal circulation and sediment transport are also expected under Alternative No. 2, while Alternative No. 3 has no impact on coastal circulation [70]. This makes it most likely that repeated investments for measures against beach erosion will be necessary for Alternative No.1 and Alternative No.2.
Outfall impacts are identical for the onshore plant, Alternatives No. 1 and No. 2, as they are located at the same site. In contrast, the outfall of Alternative No. 3 is located further offshore, where the environment is likely to be well flushed and less sensitive to brine discharge. Similarly, the intake of Alternative No. 3 is also located five kilometres offshore, resulting in reduced impingement and entrainment of organisms. The intake of the other three desalination plants is located one kilometre offshore, where the biodiversity is usually higher, making impingement and entrainment of marine organisms more likely.
The heatmap shows that the impact of the artificial island’s construction can be minimised by limiting the activity to offshore areas with low sensitivity and avoiding coastal areas. However, there has to be a trade-off between the environmental impact of intake and outfall, the effect of the artificial island on coastal circulation and sediment dynamics, and its increased need for construction material when going further offshore. The heat map indicates that this optimum is between 1 and 5 km offshore. However, in order to identify a suitable location, a local holistic environmental impact assessment needs to be compiled to identify the ecological consequences of the project [80,81].

3.7. Limitations of the Study

An environmental impact assessment (EIA) is a systematic process used to identify, evaluate and mitigate the environmental effects of a proposed project before major decisions and commitments are made [80]. A complete EIA is an essential step to build the basis for the realisation of artificial islands combined with a technical feasibility study. It was beyond the scope of the present study to quantitively weigh and evaluate the environmental impact of the offshore alternatives since site and location-specific data would be needed [14]. However, we qualitatively investigated the impact based on research findings to lay the groundwork for further research.
We neglected the influence of inflation, unforeseen events, and advancement in the RO desalination process on the WPC concerning the economic analysis. There may be significant advancements in reducing the energy demand or increasing the membranes lifetime. In addition, there may be advancements in cost-effective electrical energy storage in the field of batteries or fuel cells that could significantly enhance the combination of RO desalination with renewable energies. In this study, we selected technologies out of the development phase and available on the market today.
Within the framework of the present study, we intended only to carry out a preliminary design based on available data in the literature. The next step is to identify a specific site, including investigating nearby quarries and possible dredging locations. A pilot study should also take water samples at different water depths to assess the water quality. If the water quality is improved compared to conventional intake locations, the operating costs for the pre-treatment of the desalination plant could be reduced.

4. Conclusions

With increasing land value, permitting risks, and water demand, the pressure to recover useable land for desalination purposes will significantly increase in densely populated areas. To our knowledge, this work is the first to discuss the environmental and economic effects of locating large-scale seawater desalination plants on artificial islands. The ecological advantages concerning the intake and outfall of offshore desalination plants could exceed the risks, depending on the local conditions. In addition, artificial islands can serve as new habitats and enable the development of highly diverse ecosystems.
Economic of scale, technical advancements in reducing the energy demand, competition in the tendering process, and favourable financing structure can be expected to have the most considerable influence on lowering the water production cost (WPC) in the last decades. Outsourcing the desalination facility to an artificial island increases the WPC due to increased capital expenditures for piping and the structure itself. Nevertheless, our results indicate that still, the WPC is in the range of today’s most economical plants between 0.51 $/m3 and 0.59 $/m3. The investment costs for the artificial islands are highly dependent on the water depth at the construction site due to the required filling material. Depending on the study concept, the specific construction cost ranges between 287 $/m2 and 1507 $/m2. The distance to the shoreline determines the additional costs for undersea pipelines. However, this study reveals that the influence of energy cost on the WPC is still more significant than the financing cost for the additional construction costs for the artificial islands.
Due to the artificial islands’ lifetime of at least 50 years, the additional effect of potential carbon tax levels on the resulting WPC is not negligible. At this point lies a potential conflict between the intention to keep the WPC low and constant while steering the extension of renewable energy production and storage technologies. There may be advancements in cost-effective electrical energy storage in the field of batteries or fuel cells that could significantly enhance the combination of RO desalination with renewable energies on the way towards carbon neutrality. In the case of supplying freshwater from Israel to Jordan in exchange for renewable energy, as recently agreed in a joint declaration of intent, fair trade mechanisms should consider a changing energy mix for desalination and the level of a potential carbon tax.
The present study intends to motivate decision-makers to undertake further efforts for investigating the social acceptance and social-economic effects of large-scale offshore desalination plants on artificial islands. Decision-makers may also be inspired in identifying suitable locations for artificial islands and stimulate discussions on the implementation of on-site environmental and feasibility studies.

Author Contributions

Conceptualisation, D.J.; Funding acquisition, D.J. and S.Y.; Investigation, D.J. and S.G.; Methodology, D.J.; Software, D.J.; Visualization, D.J.; Writing—original draft, D.J.; Writing—review & editing, S.Y., T.M. and T.W. All authors have read and agreed to the published version of the manuscript.

Funding

The present study was funded by the German Federal Ministry of Education and Research (BMBF), grant number 02WM1533G.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Data is contained within the article.

Acknowledgments

This work was carried out as part of the SALAM Initiative. The SALAM Initiative aims at solving the regional water crisis in the Middle East by promoting transboundary water resources management and regional cooperation. Experts from Germany, Palestine, Jordan, and Israel work in close collaboration with water authorities to develop strategies for water production, allocation, and storage to overcome projected deficits.

Conflicts of Interest

The authors declare no conflict of interest.

Abbreviations

BOTBuild-Operate-Transfer
CAPEXCapital expenditures
CCPPCombined Cycle Power Plant
CERCCoastal Engineering Research Center
CLIConcrete Layer Innovation
EIAEnvironmental Impact Assessment
ERDEnergy Recovery Device
HPHigh pressure pumps
iInterest and repayment rate
IPPIndependent Power Producer
LCOELevelized Cost of Energy
MCM/yMillion cubic meters per year
Mio. Million
nFunding period
NCEPNational Centers for Environmental Prediction
No.Numbers indicating ordinal numeration
NTUNephelometric Turbidity Unit
ODOuter diameter
O&MOperation and Maintenance
O&MfixFixed operation and maintenance costs
O&MvarVariable operation and maintenance costs
OPEXOperational expenditures
ppmParts per million
PVPhotovoltaics
ROReverse Osmosis
SDISilt Density Index
SWROSeawater Reverse Osmosis
TmMean wave period
TsSignificant wave period
UAEUnited Arab Emirates
USACEUnited States Army Corps of Engineers
WECWave Energy Converter
WPCWater Production Cost

Appendix A

Figure A1. Detailed cost table for the economic analysis—onshore desalination.
Figure A1. Detailed cost table for the economic analysis—onshore desalination.
Membranes 12 00323 g0a1
Figure A2. Detailed cost table for the economic analysis—Alternative No. 1.
Figure A2. Detailed cost table for the economic analysis—Alternative No. 1.
Membranes 12 00323 g0a2
Figure A3. Detailed cost table for the economic analysis—Alternative No. 2.
Figure A3. Detailed cost table for the economic analysis—Alternative No. 2.
Membranes 12 00323 g0a3
Figure A4. Detailed cost table for the economic analysis—Alternative No. 3.
Figure A4. Detailed cost table for the economic analysis—Alternative No. 3.
Membranes 12 00323 g0a4

Appendix B

Table A1. Cost estimate for land reclamation: Alternative No. 1.
Table A1. Cost estimate for land reclamation: Alternative No. 1.
Cost Component Volume (m3)Unit Price ($/m3)Total Cost ($)
Reclamation fill3,393,6001033,930,600
Core fill1,074,2221010,742,220
Filter layer (0.4–2 ton)263,391205,267,820
Filter layer (4–6 ton)202,652204,053,040
Armour (18 m3 Accropode)120,08712014,410,440
Toe (4–6 ton)50,479351,766,765
Back Armour (10–12 ton)74,094402,963,760
Direct investment cost --73,134,645
Indirect investment cost
(Engineering, Permitting, Contingency)
35%25,597,126
Total cost 98,731,771
Table A2. Cost estimate for the artificial island: Alternative No. 2.
Table A2. Cost estimate for the artificial island: Alternative No. 2.
Cost ItemVolume (m3)Unit Price ($/m3)Total Cost ($)
Reclamation fill5,421,1581581,317,370
Core fill2,705,1631540,577,445
Filter layer (0.4–2 ton)536,50535s18,777,675
Filter layer (4–6 ton)382,0453513,371,575
Armour (18 m3 Accropode)229,48912027,538,680
Toe (4–6 ton)65,696352,299,360
Back Armour (10–12 ton)202,7605010,138,000
Direct investment cost --194,020,105
Indirect investment cost
(Engineering, Permitting, Contingency)
35%67,907,037
Total cost 261,927,142

References

  1. Schewe, J.; Heinke, J.; Gerten, D.; Haddeland, I.; Arnell, N.W.; Clark, D.B.; Dankers, R.; Eisner, S.; Fekete, B.M.; Colón-González, F.J.; et al. Multimodel assessment of water scarcity under climate change. Proc. Natl. Acad. Sci. USA 2014, 111, 3245–3250. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  2. Rusteberg, B.; Bensabat, J.; de Bourgoing, P.; Al-Karablieh, E.; Sadah, M.-A.; Tamimi, A. Future freshwater deficits in Palestine and Jordan. In The SALAM Initiative: Transboundary Strategies for the Resolution of the Water Deficit Problem in the Middle East; de Bourgoing, P., Nussbaum, P., Rusteberg, B., Sauter, M., Eds.; 2022; ISBN 978-3-943647-10-5. (In Press). Available online: https://www.uni-goettingen.de/en/seminar/642396.html (accessed on 9 March 2022).
  3. The SALAM Initiative: Transboundary Strategies for the Resolution of the Water Deficit Problem in the Middle East. Available online: http://www.iwrm-salam.de/ (accessed on 17 January 2022).
  4. Janowitz, D.; Bensabat, J.; Yüce, S. On- and Offshore Solutions for Large-Scale Seawater Desalination at the Israeli Coast and Gaza. In The SALAM Initiative: Transboundary Strategies for the Resolution of the Water Deficit Problem in the Middle East; de Bourgoing, P., Nussbaum, P., Rusteberg, B., Sauter, M., Eds.; 2022; ISBN 978-3-943647-10-5. (In Press). Available online: https://www.uni-goettingen.de/en/seminar/642396.html (accessed on 9 March 2022).
  5. Rusteberg, B.; Bensabat, J.; de Bourgoing, P.; Zarzar, G.; Al-Karablieh, E.; Sadah, M.-A. Alternative regional water production and transfer strategies. In The SALAM Initiative: Transboundary Strategies for the Resolution of the Water Deficit Problem in the Middle East; de Bourgoing, P., Nussbaum, P., Rusteberg, B., Sauter, M., Eds.; 2022; ISBN 978-3-943647-10-5. (In Press). Available online: https://www.uni-goettingen.de/en/seminar/642396.html (accessed on 9 March 2022).
  6. Fritzmann, C.; Löwenberg, J.; Wintgens, T.; Melin, T. State-of-the-art of reverse osmosis desalination. Desalination 2007, 216, 1–76. [Google Scholar] [CrossRef]
  7. Qasim, M.; Badrelzaman, M.; Darwish, N.N.; Darwish, N.A.; Hilal, N. Reverse osmosis desalination: A state-of-the-art review 2019, 459, 59–104. Desalination 2019, 459, 59–104. [Google Scholar] [CrossRef] [Green Version]
  8. Elimelech, M.; Phillip, W.A. The future of seawater desalination: Energy, technology, and the environment. Science 2011, 333, 712–717. [Google Scholar] [CrossRef] [PubMed]
  9. Zarzo, D.; Prats, D. Desalination and energy consumption. What can we expect in the near future? Desalination 2018, 427, 1–9. [Google Scholar] [CrossRef]
  10. Karabelas, A.J.; Koutsou, C.P.; Kostoglou, M.; Sioutopoulos, D.C. Analysis of specific energy consumption in reverse osmosis desalination processes. Desalination 2018, 431, 15–21. [Google Scholar] [CrossRef]
  11. Tal, A. Addressing Desalination’s Carbon Footprint: The Israeli Experience. Water 2018, 10, 197. [Google Scholar] [CrossRef] [Green Version]
  12. Surkes, S. Israel to Impose Carbon Tax, Starting with Fossil Fuels. Available online: https://www.timesofisrael.com/israel-to-impose-carbon-tax-starting-with-fossil-fuels/ (accessed on 7 December 2021).
  13. Feria-Díaz, J.J.; Correa-Mahecha, F.; López-Méndez, M.C.; Rodríguez-Miranda, J.P.; Barrera-Rojas, J. Recent Desalination Technologies by Hybridization and Integration with Reverse Osmosis: A Review. Water 2021, 13, 1369. [Google Scholar] [CrossRef]
  14. Lattemann, S.; Höpner, T. Environmental impact and impact assessment of seawater desalination. Desalination 2008, 220, 1–15. [Google Scholar] [CrossRef]
  15. Tom Freyberg. Sorek Stands Tall. Available online: https://www.waterworld.com/international/potable-water/article/16201752/sorek-stands-tall (accessed on 10 January 2022).
  16. Voutchkov, N. Desalination Project Cost Estimating and Management; CRC Press: Boca Raton, FL, USA, 2019; ISBN 978-0-8153-7414-5. [Google Scholar]
  17. Alfasi, N. Can Planning Protect the Public Interest? Geogr. Res. Forum 2009, 29, 83–102. [Google Scholar]
  18. Surkes, S. Panel Approves Sixth Desalination Plant to Sate Western Galilee. Available online: https://www.timesofisrael.com/panel-approves-sixth-desalination-plant-to-sate-western-galilee/#gs.f6oh1s (accessed on 6 December 2021).
  19. Kolman, R. New Land in the Water: Economically and Socially, Land Reclamation Pays. Terra Aqua 2012, 128, 3–8. [Google Scholar]
  20. Rik Mirovsky. Canada’s Beaverhall Buys TEL Aviv Nofei Yam Lot. Available online: https://www.jpost.com/business-and-innovation/real-estate/article-694607 (accessed on 5 February 2022).
  21. Broom, D. Denmark Approves Artificial Island to Site 10 GW Offshore Wind Hub. Available online: https://energypost.eu/denmark-approves-artificial-island-to-site-10gw-offshore-wind-hub/ (accessed on 6 December 2021).
  22. Shelf Gdalia, Z.Y. Conference on Shore Extensions and Artifical Islands off the Coast of Israel Haifa Israel: Samuel Neaman Institute. 1994. Available online: https://www.neaman.org.il/EN/Conference-shore-extensions-artifical-islands-off-coast-Israel (accessed on 10 January 2022).
  23. Zimmels, Y.; Boas, A. Construction of a pile-based offshore airport. Ocean Eng. 2002, 30, 127–150. [Google Scholar] [CrossRef]
  24. Assif, S.; Portman, M.; Cohen, Y.; Adler, E.; Porat, I.; Teff-Seker, Y.; Spier, V.; Perlman, A.; Katz, B.; Dror, T.; et al. The Israel Marine Plan. Technion Israel Institute of Technology: Swatow, China, 2015. [Google Scholar]
  25. Serna, Á.; Tadeo, F. Offshore Desalination Using Wave Energy. Adv. Mech. Eng. 2013, 5, 539857. [Google Scholar] [CrossRef]
  26. Kokubun, T. Shift to Floating Seawater Desalination: In Order to Reduce Environmental Issues and Supply Timely to Meet Demand. Available online: https://www.oecd.org/sti/ind/oecd-shipbuilding-workshop-kokubun.pdf (accessed on 9 February 2022).
  27. Kress, N.; Gertner, Y.; Shoham-Frider, E. Seawater quality at the brine discharge site from two mega size seawater reverse osmosis desalination plants in Israel (Eastern Mediterranean). Water Res. 2020, 171, 115402. [Google Scholar] [CrossRef] [PubMed]
  28. Navionics. Nautical Charts Shavei Zion, Israel. Available online: https://www.navionics.com/deu/ (accessed on 7 December 2021).
  29. Construction Industry Research and Information Association; Civieltechnisch Centrum Uitvoering Research en Regelgeving (The Netherlands). The Rock Manual: The Use of Rock in Hydraulic Engineering, 2nd ed.; C683: London, UK, 2007. [Google Scholar]
  30. National Centers for Environmental Prediction. Climate Forecast System Reanalysis (CFSR). Available online: https://www.ncei.noaa.gov/products/weather-climate-models/climate-forecast-system (accessed on 9 February 2022).
  31. United States. Army. Corps of Engineers. Shore Protection Manual. Available online: https://usace.contentdm.oclc.org/digital/collection/p16021coll11/id/1934/ (accessed on 10 January 2022).
  32. Rosen, D.S.; Kit, E. Evaluation of the Wave Characteristics at the Mediterranean Coast of Israel. Isr. J. Earth-Sci. 1982, 30, 120–134. [Google Scholar]
  33. CEC Marine Ltd. Available online: http://www.cecmarine.com/ (accessed on 11 January 2022).
  34. Concrete Layer Innovations. CLI Calculator. Available online: https://www.concretelayer.com/en/solutions/online-resources/calculator (accessed on 4 February 2022).
  35. CLI. ACCROPODE™ II—ECOPODE™ Design Guide Table. Available online: https://www.concretelayer.com/sites/default/files/2019-05/ECOPODE%E2%84%A2_Design%20_Table_2012_0.pdf (accessed on 10 January 2022).
  36. Gill, D.A. Geological Aspects of Planning Artificial Islands Offshore Tel Aviv, Israel; The University of Arizona: Tucson, AZ, USA, 1999. [Google Scholar]
  37. World Health Organization. Guidelines for Drinking-Water Quality; Fourth edition incorporating the first addendum; World Health Organization: Geneva, Switzerland, 2017; ISBN 9789241549950. [Google Scholar]
  38. Grattan, S.R.; Díaz, F.J.; Pedrero, F.; Vivaldi, G.A. Assessing the suitability of saline wastewaters for irrigation of Citrus spp.: Emphasis on boron and specific-ion interactions. Agric. Water Manag. 2015, 157, 48–58. [Google Scholar] [CrossRef]
  39. Grieve, C.M.; Grattan, S.R.; Maas, E.V. Plant salt tolerance. In ASCE Manual and Reports on Engineering Practice No. 71 Agricultural Salinity Assessment and Management, 2nd ed.; Wallender, W.W., Tanji, K.K., Eds.; ASCE: Reston, VA, USA, 2012; Chapter 13; pp. 405–459. [Google Scholar]
  40. Schiffler, M. Perspectives and challenges for desalination in the 21st century. Desalination 2004, 165, 1–9. [Google Scholar] [CrossRef]
  41. Sauvet-Goichon, B. Ashkelon desalination plant—A successful challenge. Desalination 2007, 203, 75–81. [Google Scholar] [CrossRef]
  42. Gude, V.G. Desalination and sustainability—An appraisal and current perspective. Water Res. 2016, 89, 87–106. [Google Scholar] [CrossRef]
  43. Gao, L.; Yoshikawa, S.; Iseri, Y.; Fujimori, S.; Kanae, S. An Economic Assessment of the Global Potential for Seawater Desalination to 2050. Water 2017, 9, 763. [Google Scholar] [CrossRef]
  44. Lokiec, F.; Kronenberg, G. South Israel 100 million m3/y seawater desalination facility: Build, operate and transfer (BOT) project. Desalination 2003, 156, 29–37. [Google Scholar] [CrossRef]
  45. Tenne, A. Sea Water Desalination in Israel: Planning, Coping with Difficulties, and Economic Aspects of Long-Term Risks; Water Authority—State of Israel Desalination Devision. 2010. Available online: https://www.gov.il/BlobFolder/reports/water-authority-data-english/he/12-Desalination-in-Israel.pdf (accessed on 10 January 2022).
  46. Vartiainen, E.; Masson, G.; Breyer, C.; Moser, D.; Román Medina, E. Impact of weighted average cost of capital, capital expenditure, and other parameters on future utility-scale PV levelised cost of electricity. Prog. Photovolt. Res. Appl. 2020, 28, 439–453. [Google Scholar] [CrossRef] [Green Version]
  47. IRENA. Renewable Power Generation Costs in 2019, International Renewable Energy Agency, Abu Dhabi. 2020. Available online: https://www.irena.org/publications/2020/Jun/Renewable-Power-Costs-in-2019 (accessed on 10 January 2022).
  48. Ministry of Energy Israel. Promotion of Renewable Energy in the Israeli Energy Sector. Available online: https://www.gov.il/en/departments/general/renewable_energy (accessed on 17 January 2022).
  49. Ministry of Energy Israel. UAE, Jordan and Israel Collaborate to Mitigate Climate Change with Sustainability Project. Available online: https://www.gov.il/en/departments/news/press_221121 (accessed on 10 January 2022).
  50. Gordon, J.M.; Fasquelle, T.; Nadal, E.; Vossier, A. Providing large-scale electricity demand with photovoltaics and molten-salt storage. Renew. Sustain. Energy Rev. 2021, 135, 110261. [Google Scholar] [CrossRef]
  51. Luo, X.; Wang, J.; Dooner, M.; Clarke, J. Overview of current development in electrical energy storage technologies and the application potential in power system operation. Appl. Energy 2015, 137, 511–536. [Google Scholar] [CrossRef] [Green Version]
  52. Gür, T.M. Review of electrical energy storage technologies, materials and systems: Challenges and prospects for large-scale grid storage. Energy Environ. Sci. 2018, 11, 2696–2767. [Google Scholar] [CrossRef]
  53. Schmidt, O.; Melchior, S.; Hawkes, A.; Staffell, I. Projecting the Future Levelized Cost of Electricity Storage Technologies. Joule 2019, 3, 81–100. [Google Scholar] [CrossRef] [Green Version]
  54. IEA; NEA. Projected Costs of Generating Electricity (2020 Edition). 2020. Available online: https://www.iea.org/reports/projected-costs-of-generating-electricity-2020 (accessed on 10 January 2022).
  55. Weisser, D. A guide to life-cycle greenhouse gas (GHG) emissions from electric supply technologies. Energy 2007, 32, 1543–1559. [Google Scholar] [CrossRef]
  56. National Marine Dredging Company. UPPER ZAKUM FIELD DEVELOPMENT. Available online: https://www.nmdc.com/site/projectDetails/10 (accessed on 4 February 2022).
  57. Concrete Layer Innovations. Upper Zakum Oil Field, Artificial Islands Project North and West. Available online: https://www.concretelayer.com/en/upper-zakum-oil-field-artificial-islands-project-north-and-west (accessed on 4 February 2022).
  58. Concrete Layer Innovations. Artificial Islands for Satah Al-Razboot (SARB). Available online: https://www.concretelayer.com/en/artificial-islands-satah-al-razboot-sarb (accessed on 4 February 2022).
  59. Dredging International, MEDCO. SARB Island Project—EuDA 2013 AGM Conference. Available online: https://www.european-dredging.eu/pdf/04_SARB_Islands.pdf (accessed on 10 January 2022).
  60. Michael Daly. $2 Billion Artificial Island Planned as North Sea Wind Power Hub. Available online: https://www.stuff.co.nz/business/world/90402105/2-billion-artificial-island-planned-as-north-sea-wind-power-hub (accessed on 4 February 2022).
  61. Ministry of Energy Israel. The World’s Lowest Price of Desalinated Water in the Sorek 2 Desalination Plant Tender. Available online: https://www.gov.il/en/departments/news/desalination_260520 (accessed on 6 December 2021).
  62. Marmelshtein, Y. Attracting private funding through public finance: A case study of desalination of sea water in Israel. In Proceedings of the OECD-WWC-Netherlands Roundtable on Financing Water, Tel Aviv, Israel, 13 September 2017; Volume 13. [Google Scholar]
  63. Lokiec, F.; Meerovitch, R. Implementation of build-operate-transfer schemes: Obstacles & solutions. In Proceedings of the World Congress on Desalination and Water Reuse, Tianjin, China, 20–25 October 2013. [Google Scholar]
  64. IMF. Chapter 3: Mitigating Climate Change. In World Economic Outlook, October 2020: A Long and Difficult Ascent; IMF: Washington, DC, USA, 2020; pp. 85–114. ISBN 978-1-51355-815-8. [Google Scholar]
  65. Dialyna, E.; Tsoutsos, T. Wave Energy in the Mediterranean Sea: Resource Assessment, Deployed WECs and Prospects. Energies 2021, 14, 4764. [Google Scholar] [CrossRef]
  66. Schallenberg-Rodríguez, J.; Del Rio-Gamero, B.; Melian-Martel, N.; Lis Alecio, T.; González Herrera, J. Energy supply of a large size desalination plant using wave energy. Practical case: North of Gran Canaria. Appl. Energy 2020, 278, 115681. [Google Scholar] [CrossRef]
  67. Janowitz, D.; Margheri, M.; Yakhoul, H.; Bensabat, J.; Rusteberg, B.; Yüce, S. Bartering Blue Water vs. Green Energy—Innovative Swap-Options for Cooperation between Israel and Jordan. In Proceedings of the International Conference on Water Management and Sustainability: Solutions for Arid Region (WMS-EXPO2020); Dubai, United Arab Emirates, 22–24 March 2022, (Accepted by the Program Committee for presentation).
  68. Degraer, S.; Carey Drew, A.; Coolen, J.W.P.; Hutchinson, Z.L.; Kerckhof, F.; Rumes, B.; Vanaverbeke, J. Offshore wind farm artificial reefs affect ecosystem structure and functioning. Oceanography 2020, 33, 48–57. [Google Scholar] [CrossRef]
  69. Dugan, J.E.; Airoldi, L.; Chapman, M.G.; Walker, S.J.; Schlacher, T. Estuarine and Coastal Structures: Environmental Effects, A Focus on Shore and Nearshore Structures. Treatise Estuar. Coast. Sci. 2011, 8, 17–41. [Google Scholar]
  70. Black, K.P.; Andrews, C.J. Sandy Shoreline Response to Offshore Obstacles Part 1: Salient and Tombolo Geometry and Shape. J. Coast. Res. 2001, 29, 82–93. [Google Scholar]
  71. Landry, C.; Keeler, A.; Kriesel, W. An Economic Evaluation of Beach Erosion Management Alternatives. Mar. Resour. Econonomics 2003, 18, 105–127. [Google Scholar] [CrossRef]
  72. Luijendijk, A.; Taal, M. Sand Motor. Available online: https://www.deltares.nl/en/projects/sand-engine/ (accessed on 6 December 2021).
  73. Zviely, D.; Kit, E.; Rosen, B.; Galili, E.; Klein, M. Shoreline migration and beach-nearshore sand balance over the last 200 years in Haifa Bay (SE Mediterranean). Geo-Mar. Lett. 2009, 29, 93–110. [Google Scholar] [CrossRef]
  74. Guo, X.; Chen, C.; Tang, J. Numerical Simulation of the hydrodynamic effects of an artificial island. Fresenius Environ. Bull. 2018, 27, 2671–2682. [Google Scholar]
  75. Missimer, T.M.; Jones, B.; Maliva, R.G. Intakes and Outfalls for Seawater Reverse-Osmosis Desalination Facilities: Innovations and Environmental Impact. Springer International Publishing: Basel, Switzerland,, 2015; ISBN 978-3-319-13202-0. [Google Scholar]
  76. Callaghan, T.P. Entrainment and Impingement of Organisms in Power Plant Cooling. Encycl. Energy 2004, 447–457. [Google Scholar] [CrossRef]
  77. Aqseptence Group. Sustainable and Eco-friendly Fish Protection in Water Intakes. 2021. Available online: https://www.passavant-geiger.com/fileadmin/Resources/Passavant_Geiger_Noggerath/Products/Documents/Geiger_R_Electric_Fish_Repelling/Geiger_Fish_Protection_Technologies_EN__3_.pdf (accessed on 10 January 2022).
  78. Chavand, V.; Evenden, C. Noise Assessment of a Desalination Plant. In Proceedings of the 20th International Congress on Acoustics, ICA 2010, Sydney, Australia, 23–27 August 2010. [Google Scholar]
  79. Pérez, C.; Iglesias, G. Integration of Wave energy Converters and Offshore Windmills. In Proceedings of the 4th International Conference on Ocean Energy, Dublin, Ireland, 17–20 October 2012. [Google Scholar]
  80. United Nations Environment Programme. Desalination: Resource and Guidance Manual for Environmental Impact Assessment; World Health Organization: Geneva, Switzerland, 2008; Available online: https://wedocs.unep.org/handle/20.500.11822/30011;jsessionid=CC649D9AA7F8A9A96CEC2407B3DA0FCC (accessed on 10 January 2022).
  81. Chee, S.Y.; Othman, A.G.; Sim, Y.K.; Mat Adam, A.N.; Firth, L.B. Land reclamation and artificial islands: Walking the tightrope between development and conservation. Glob. Ecol. Conserv. 2017, 12, 80–95. [Google Scholar] [CrossRef] [Green Version]
Figure 1. Map of the region including the considered areas for new desalination plants investigated in the SALAM initiative and a zoom-in on the study relevant alternatives No. 2 and No. 3 next to Shavei Zion.
Figure 1. Map of the region including the considered areas for new desalination plants investigated in the SALAM initiative and a zoom-in on the study relevant alternatives No. 2 and No. 3 next to Shavei Zion.
Membranes 12 00323 g001
Figure 2. Conceptual cross-section design of alternative No. 3—5 km offshore −30 m water depth [33].
Figure 2. Conceptual cross-section design of alternative No. 3—5 km offshore −30 m water depth [33].
Membranes 12 00323 g002
Figure 3. Desalination project context on the artificial islands.
Figure 3. Desalination project context on the artificial islands.
Membranes 12 00323 g003
Figure 4. Simplified flow chart of two-pass reverse osmosis desalination with energy recovery.
Figure 4. Simplified flow chart of two-pass reverse osmosis desalination with energy recovery.
Membranes 12 00323 g004
Figure 5. The main influences on the water production cost.
Figure 5. The main influences on the water production cost.
Membranes 12 00323 g005
Figure 6. Comparison of the specific water production cost for all alternatives.
Figure 6. Comparison of the specific water production cost for all alternatives.
Membranes 12 00323 g006
Figure 7. Comparison of water production cost varying the carbon tax level for Alternative No. 3.
Figure 7. Comparison of water production cost varying the carbon tax level for Alternative No. 3.
Membranes 12 00323 g007
Figure 8. Comparison of the specific water production cost varying the share of renewable energy for alternative No. 3.
Figure 8. Comparison of the specific water production cost varying the share of renewable energy for alternative No. 3.
Membranes 12 00323 g008
Figure 9. Expected beach profile of an offshore structure close to the coastline (extreme scenario) [33].
Figure 9. Expected beach profile of an offshore structure close to the coastline (extreme scenario) [33].
Membranes 12 00323 g009
Figure 10. Fish return system adapted from [76].
Figure 10. Fish return system adapted from [76].
Membranes 12 00323 g010
Figure 11. Heatmap for the environmental assessment of the alternatives.
Figure 11. Heatmap for the environmental assessment of the alternatives.
Membranes 12 00323 g011
Table 1. Alternatives for marine structures for large-scale desalination plants next to Shavei Zion.
Table 1. Alternatives for marine structures for large-scale desalination plants next to Shavei Zion.
AlternativesWater DepthCrest Height of the Structure
above Chart Datum
No. 1—Artificial Island
Land reclamation
−5 m+8 m
No. 2—Artificial Island
1 km offshore
−12 m+14 m
No. 3—Artificial Island
5 km offshore
−30 m+14.4 m
Table 2. Technical parameters for the reverse osmosis desalination plant.
Table 2. Technical parameters for the reverse osmosis desalination plant.
Parameter Value Unit
TypeBOT project
Membrane-based
Two-pass SWRO system
Capacity600MCM/y
Availability>95%
Feed TDS40,500ppm [41]
Permeate TDS300ppm [41]
Recovery rate~45% [41]
Energy demand3kWh/m3 [16]
Table 3. Essential parameters for the economic assessment.
Table 3. Essential parameters for the economic assessment.
Parameter Value Unit
Financing costs
Share of sponsoring/equity from total capital costs10%
BOT contract/funding period25years [45]
Sum interest rate and repayment rate5%
Fixed O&M costs
Maintenance and repair desalination plant3%
Maintenance and repair infrastructure (onshore)1%
Maintenance and repair infrastructure (offshore)2%
Variable O&M costs
Chemicals0.03 $/m3 [6,16]
Replacement of membranes and cartridge filters0.04$/m3 [16]
Waste disposal0.017$/m3 [16]
Table 4. Variation in the energy mix and assumed Levelized Cost of Energy (LCOE).
Table 4. Variation in the energy mix and assumed Levelized Cost of Energy (LCOE).
Parameter Value
(2030)
Value
(2040)
Value
(2050)
Unit
Share of
Renewable
energy
3065100%
LCOE PV0.03 [50]0.015 [46]0.01 [46]$/kWh
LCOE PV +
Storage
0.12 [50]0.110.10$/kWh
Total LCOE
Renewable
0.030.0660.073$/kWh
LCOE CCPP0.060.060.06$/kWh
Table 5. Cost estimate for the artificial island—Alternative No. 3.
Table 5. Cost estimate for the artificial island—Alternative No. 3.
Cost ItemVolume (m3)Unit Price ($/m3)Total Cost ($)
Reclamation fill9,800,23015147,003,450
Core fill7,652,64815114,789,720
Filter layer (0.4–2 ton)953,9643533,388,740
Filter layer (4–6 ton)796,0193527,860,665
Armour (24 m2 Accropode)303,99812036,479,760
Toe structure (10–12 ton)297,1165014,855,800
Back Armour (10–12 ton)202,7605010,138,000
Direct investment cost--384,516,135
Indirect investment cost
(Engineering, Permitting, Contingency)
35%134,580,647
Total cost 519,096,782
Table 6. Data of comparable artificial islands projects based on rubble mound breakwaters.
Table 6. Data of comparable artificial islands projects based on rubble mound breakwaters.
Artificial Island
Projects
Construction Cost per Square Meter (2022)Water Depth
(Distance to Shore)
Project
Description
Location
Alternative No. 1
(conceptual evaluation in this study)
~287 $/m2−10 m
(Land reclamation)
Rectangular Shape
~0.1 billion $, ~0.34 km2
North Haifa, Israel
Alternative No. 2
(conceptual evaluation in this study)
~760 $/m2−12 m
(1 km offshore)
Rectangular Shape
~0.26 billion $, ~0.34 km2
North Haifa, Israel
Alternative No. 3
(conceptual evaluation in this study)
~1507 $/m2−30 m
(5 km offshore)
Rectangular Shape
~0.52 billion $, ~0.34 km2
North Haifa, Israel
Upper Zakum Field
Development
(constructed) [56,57]
~469 $/m2 *2−6 m to −13 m
(84 km offshore)
Falcon-shaped, 2011–2014
~ 0.63 billion $ (2011), ~1.68 km2
Abu Dhabi, UAE
Sateh Al Razboot oilfield (constructed) [58,59]-−13 m to −15 m
(120 km offshore)
Falcon-shaped, 2011–2013
~0.32 km2
Abu Dhabi, UAE
Artificial Island North Sea Wind Power Hub (planned) [60]~333 $/m2−18 m
(100 km offshore)
Expected Realisation
between 2030–2050
~2 billion $, 6 km2
Middle of North Sea between Europe and the United Kingdom
Artificial Island for an airport offshore Tel Aviv
(conceptual) [23]
~1395 $/m2 *1~−19.5 m
(1.35 km offshore)
Rectangular Shape
~2.1 billion $ (2002), 2.32 km2
Tel Aviv, Israel
*1 adjusted value using 55% inflation rate from 2002 to 2022. *2 adjusted value using 25% inflation rate from 2011 to 2022.
Table 7. Direct investment costs for all offshore alternatives including piping and the marine structures.
Table 7. Direct investment costs for all offshore alternatives including piping and the marine structures.
AlternativeIntake Piping *1Outfall Piping *1Product Piping *1Piping ($) + Structure ($) = Total Cost ($)
No. 1—Artificial Island
Land reclamation
1 km
~20 Mio. $
2 km
~33 Mio. $
Discharge already
at shoreline
~53 Mio. $ + ~73 Mio. $ = 126 Mio. $
No. 2—Artificial Island
1 km offshore
Intake
at site
1 km
~17 Mio. $
1 km
~17 Mio. $
~34 Mio. $ + ~194 Mio. $ = 228 Mio. $
No. 3—Artificial Island
5 km offshore
Intake
at site
Outfall
at site
5 km
~83 Mio. $
~83 Mio. $ + ~385 Mio. $ = 468 Mio. $
*1 The cost for the HDPE pipes was estimated concerning plant modules with a capacity of 200 MCM/y. For 400 MCM/y intake ~ 3 × 1800 mm OD pipes, for 200 MCM/y brine outfall ~ 2 × 1400 mm OD pipes, for 200 MCM/y product water transport ~ 2 × 1400 mm OD pipes.
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Janowitz, D.; Groche, S.; Yüce, S.; Melin, T.; Wintgens, T. Can Large-Scale Offshore Membrane Desalination Cost-Effectively and Ecologically Address Water Scarcity in the Middle East? Membranes 2022, 12, 323. https://doi.org/10.3390/membranes12030323

AMA Style

Janowitz D, Groche S, Yüce S, Melin T, Wintgens T. Can Large-Scale Offshore Membrane Desalination Cost-Effectively and Ecologically Address Water Scarcity in the Middle East? Membranes. 2022; 12(3):323. https://doi.org/10.3390/membranes12030323

Chicago/Turabian Style

Janowitz, Daniel, Sophie Groche, Süleyman Yüce, Thomas Melin, and Thomas Wintgens. 2022. "Can Large-Scale Offshore Membrane Desalination Cost-Effectively and Ecologically Address Water Scarcity in the Middle East?" Membranes 12, no. 3: 323. https://doi.org/10.3390/membranes12030323

APA Style

Janowitz, D., Groche, S., Yüce, S., Melin, T., & Wintgens, T. (2022). Can Large-Scale Offshore Membrane Desalination Cost-Effectively and Ecologically Address Water Scarcity in the Middle East? Membranes, 12(3), 323. https://doi.org/10.3390/membranes12030323

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop