Next Article in Journal
Leakage Fault Diagnosis of Lifting and Lowering Hydraulic System of Wing-Assisted Ships Based on WPT-SVM
Previous Article in Journal
Simulation and Experimental Study of Degradation of Polymetallic Nodules in Deep-Sea Multi-Stage Lifting Motor Pump
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Correction

Correction: Diez-Caballero et al. Environmental Compatibility of the Parc Tramuntana Offshore Wind Project in Relation to Marine Ecosystems. J. Mar. Sci. Eng. 2022, 10, 898

1
Tecnoambiente S.L., 08290 Cerdanyola del Vallès, Spain
2
SENER Ingeniería y Sistemas S.A., 08290 Cerdanyola del Vallès, Spain
3
IHCantabria—Instituto de Hidráulica Ambiental de la Universidad de Cantabria, 39011 Santander, Spain
*
Author to whom correspondence should be addressed.
Contribution of the hydrodynamical studies on the Golf de Roses.
J. Mar. Sci. Eng. 2023, 11(1), 25; https://doi.org/10.3390/jmse11010025
Submission received: 11 November 2022 / Accepted: 25 November 2022 / Published: 26 December 2022
(This article belongs to the Topic Marine Renewable Energy)
The authors of this article would like to include a clarification of the original publication [1] in regard to any potential conflicts of interest related to their participation in this article. The authors whose names are listed immediately below report the following additional details regarding their relationship with the work on which the article is based:
  • Conflicts of Interest: Mr. Koldo Diez-Caballero and Mr. Juan Ramón Vidal are employees of Tecnoambiente S.L., an environmental consultant that has developed the hydrographic, geophysical and environmental surveys of the project area, and is developing the Environmental Impact Assessment studies of the offshore wind farm project. Ms. Silvia Troiteiro, Ms. Marta González, Mr. Sergi Ametller and Ms. Raquel Juan are employees of SENER Ingeniería y Sistemas, S.A., a company of the SENER Group. The offshore wind farm mentioned in the article is being developed by BlueFloat Energy International, S.L.U. together with SENER Renewable Investments, S.L. (a company of the SENER Group) as minority partner. Ms. Silvia Troiteiro, Ms. Marta González, Mr. Sergi Ametller and Ms. Raquel Juan have participated in the elaboration of the study referred to in the article and have had access to all information produced by such study. Mr. Javier García-Alba is an employee of the IHCantabria, a non-profit research organization that has developed the specialized hydrodynamic studies to determine the impact of the wind farm on marine dynamics.
The authors state that the scientific conclusions are unaffected. The original publication has also been updated.

Reference

  1. Diez-Caballero, K.; Troiteiro, S.; García-Alba, J.; Vidal, J.R.; González, M.; Ametller, S.; Juan, R. Environmental Compatibility of the Parc Tramuntana Offshore Wind Project in Relation to Marine Ecosystems. J. Mar. Sci. Eng. 2022, 10, 898. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Diez-Caballero, K.; Troiteiro, S.; García-Alba, J.; Vidal, J.R.; González, M.; Ametller, S.; Juan, R. Correction: Diez-Caballero et al. Environmental Compatibility of the Parc Tramuntana Offshore Wind Project in Relation to Marine Ecosystems. J. Mar. Sci. Eng. 2022, 10, 898. J. Mar. Sci. Eng. 2023, 11, 25. https://doi.org/10.3390/jmse11010025

AMA Style

Diez-Caballero K, Troiteiro S, García-Alba J, Vidal JR, González M, Ametller S, Juan R. Correction: Diez-Caballero et al. Environmental Compatibility of the Parc Tramuntana Offshore Wind Project in Relation to Marine Ecosystems. J. Mar. Sci. Eng. 2022, 10, 898. Journal of Marine Science and Engineering. 2023; 11(1):25. https://doi.org/10.3390/jmse11010025

Chicago/Turabian Style

Diez-Caballero, Koldo, Silvia Troiteiro, Javier García-Alba, Juan Ramón Vidal, Marta González, Sergi Ametller, and Raquel Juan. 2023. "Correction: Diez-Caballero et al. Environmental Compatibility of the Parc Tramuntana Offshore Wind Project in Relation to Marine Ecosystems. J. Mar. Sci. Eng. 2022, 10, 898" Journal of Marine Science and Engineering 11, no. 1: 25. https://doi.org/10.3390/jmse11010025

APA Style

Diez-Caballero, K., Troiteiro, S., García-Alba, J., Vidal, J. R., González, M., Ametller, S., & Juan, R. (2023). Correction: Diez-Caballero et al. Environmental Compatibility of the Parc Tramuntana Offshore Wind Project in Relation to Marine Ecosystems. J. Mar. Sci. Eng. 2022, 10, 898. Journal of Marine Science and Engineering, 11(1), 25. https://doi.org/10.3390/jmse11010025

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop