Siatras, V.; Bakopoulos, E.; Mavrothalassitis, P.; Nikolakis, N.; Alexopoulos, K.
Production Scheduling Based on a Multi-Agent System and Digital Twin: A Bicycle Industry Case. Information 2024, 15, 337.
https://doi.org/10.3390/info15060337
AMA Style
Siatras V, Bakopoulos E, Mavrothalassitis P, Nikolakis N, Alexopoulos K.
Production Scheduling Based on a Multi-Agent System and Digital Twin: A Bicycle Industry Case. Information. 2024; 15(6):337.
https://doi.org/10.3390/info15060337
Chicago/Turabian Style
Siatras, Vasilis, Emmanouil Bakopoulos, Panagiotis Mavrothalassitis, Nikolaos Nikolakis, and Kosmas Alexopoulos.
2024. "Production Scheduling Based on a Multi-Agent System and Digital Twin: A Bicycle Industry Case" Information 15, no. 6: 337.
https://doi.org/10.3390/info15060337
APA Style
Siatras, V., Bakopoulos, E., Mavrothalassitis, P., Nikolakis, N., & Alexopoulos, K.
(2024). Production Scheduling Based on a Multi-Agent System and Digital Twin: A Bicycle Industry Case. Information, 15(6), 337.
https://doi.org/10.3390/info15060337