Promotion of the Application of BIM in China—A BIM-Based Model for Construction Material Recycling
Abstract
:1. Introduction
2. Materials and Methods
2.1. Structure of the Research Methodology
2.2. Selection of the Research Method and Data Collection
2.3. Design of the Questionnaire Survey
2.3.1. Structure of the Questionnaire
2.3.2. Selection of the Participants
2.3.3. Ethical Considerations and Limitations of the Questionnaire
- Uncertainty of the sample size;
- Negative influence on the quality of responses due to the literacy level of participants;
- Possible unsophistication of the advice given for the proposed recycling model;
- The data quality cannot be guaranteed since questionnaires are often completed hastily and carelessly [13].
3. Research Results and Discussion
3.1. Questionnaire Survey Part One: Necessity of Development
- Inappropriate demolition and recycling plan (R = 89%; 33/37) and
- China does not have a mature industrial chain for recycling waste building materials (R = 86%; 32/37).(Here, R is the percentage of respondents who agree or strongly agree with the given reason.)
3.2. Proposed Developed BIM-Based Recycling Model
3.2.1. Developing the Existing Model
3.2.2. Proposed Model
3.2.3. Design and Conceptual Phase
3.2.4. Construction and Operation Phase
3.2.5. Demolition Phase
3.2.6. Comparison with Results from Other Research
3.3. Questionnaire Survey Part Two: Feasibility of the Model and Advice
3.3.1. Universality of Applying BIM in Recycling in China
3.3.2. Feasibility of the Developed Model
- Communication for information is more important than a dynamic visualized model for reducing waste and increasing the recycling rate.
- Reducing waste is more important than recycling it.
“This model can be further improved to reduce waste through making the best use of BIM at design phase.”
“Organization management in construction can be combined to this model to reduce waste and increase the recovery rate at construction phase.”
“Hoping the application of BIM in recycling can be popularized in China to improve the current situation.”
“China should promulgate relevant laws and regulations.”
4. Conclusions and Future Prospects
4.1. Conclusions
- Inefficiency of demolition and recycling plans and the lack of a mature chain for building material recycling lead to the waste of construction materials;
- The most common method at present for the disposal of waste materials is landfill;
- The application of BIM in recycling in China and the proposed model in particular were supported by more than 90% of participants;
- Development of the current recycling plan is imperative, and the proposed model will provide an improvement in material recycling in China, with economic and environmental benefits.
4.2. Limitations
4.3. Recommendations and Future Prospects
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Conflicts of Interest
References
- Pacheco-Torgal, F.; Tam, V.W.Y.; Labrincha, J.A.; Ding, Y.; De Brito, J. Handbook of Recycled Concrete and Demolition Waste; Elsevier: Amsterdam, The Netherlands, 2013. [Google Scholar]
- Rajendran, P.; Gomez, C.P. Implementing BIM for waste minimization in the construction industry: A literature review. In Proceedings of the 2nd International Conference on Management, Langkawi Kedah, Malaysia, 11–12 June 2012; pp. 557–570. [Google Scholar]
- Van der Heijden, J.; van Bueren, E. Regulating sustainable construction in Europe: An inquiry into the European Commission’s harmonization attempts. Int. J. Law Built Environ. 2013, 5, 5–20. [Google Scholar] [CrossRef]
- Hebel, D.E.; Wisniewska, M.H.; Heisel, F. Building from Waste: Recovered Materials in Architecture and Construction; Birkhäuser: Basel, Switzerland, 2014. [Google Scholar]
- National Development and Reform Commission of China. Annual Report of the Comprehensive Utilization of Resources in China; NDRC: Beijing, China, 2014. Available online: http://hzs.ndrc.gov.cn/newgzdt/201410/W020141015503508422029.pdf (accessed on 10 July 2019). (In Chinese)
- Guthrie, P.M.; Woolveridge, A.C.; Patel, V.S. Waste Minimisation in Construction; Construction Industry Research and Information Association: London, UK, 1997; Volume 133. [Google Scholar]
- Lund, H.F. The McGraw-Hill Recycling Handbook; McGraw-Hill: New York, NY, USA, 1993. [Google Scholar]
- Ding, Z.; Zuo, J.; Wu, J.; Wang, J.Y. Key factors for the BIM adoption by architects: A China study. Eng. Constr. Archit. Manag. 2015, 22, 732–748. [Google Scholar] [CrossRef]
- Akinade, O.O.; Oyedele, L.O.; Ajayi, S.O.; Bilal, M.; Alaka, H.A.; Owolabi, H.A.; Arawomo, O.O. Designing out construction waste using BIM technology: Stakeholders’ expectations for industry deployment. J. Clean. Prod. 2018, 180, 375–385. [Google Scholar] [CrossRef]
- Ge, X.J.; Livesey, P.; Wang, J.; Huang, S.; He, X.; Zhang, C. Deconstruction waste management through 3D reconstruction and BIM: A case study. Vis. Eng. 2017, 5, 13–27. [Google Scholar] [CrossRef] [Green Version]
- Porwal, A.; Hewage, K.N. Building information modelling–based analysis to minimize waste rate of structural reinforcement. J. Constr. Eng. Manag. 2011, 138, 943–954. [Google Scholar] [CrossRef]
- Bilal, M.; Oyedele, L.O.; Akinade, O.O.; Ajayi, S.O.; Alaka, H.A.; Owolabi, H.A.; Qadir, J.; Pasha, M.; Bello, S.A. Big data architecture for construction waste analytics (CWA): A conceptual framework. J. Build. Eng. 2016, 6, 144–156. [Google Scholar] [CrossRef]
- Hamidi, B.; Bulbul, T.; Pearce, A.; Thabet, W. Potential application of BIM in cost-benefit analysis of demolition waste management. In Proceedings of the Construction Research Congress 2014: Construction in a Global Network, Atlanta, GA, USA, 19–21 May 2014; pp. 279–288. [Google Scholar]
- Jalaei, F.; Zoghi, M.; Khoshand, A. Life cycle environmental impact assessment to manage and optimize construction waste using Building Information Modeling (BIM). Int. J. Constr. Manag. 2019, 1–18. [Google Scholar] [CrossRef]
- Spisakova, M.; Mandicak, T. Sustainable Design of Construction through Waste Management Using Building Information Modelling. In Proceedings of the 18 International Multidisciplinary Scientific GeoConference SGEM 2018, Albena, Bulgaria, 30 June–9 July 2018. [Google Scholar]
- Naoum, S. Dissertation Research and Writing for Construction Students; Routledge: Abingdon, UK, 2012. [Google Scholar]
- Poynter, R.; Williams, N.; York, S. The Handbook of Mobile Market Research: Tools and Techniques for Market Researchers; John Wiley & Sons: Hoboken, NJ, USA, 2014. [Google Scholar]
- Cohen, L.; Manion, L.; Morrison, K. Research Methods in Education; Routledge: Abingdon, UK, 2002. [Google Scholar]
- Gillham, B. Developing a Questionnaire; A&C Black: London, UK, 2008. [Google Scholar]
- Cao, D.; Wang, G.; Li, H.; Skitmore, M.; Huang, T.; Zhang, W. Practices and effectiveness of building information modelling in construction projects in China. Autom. Constr. 2015, 49, 113–122. [Google Scholar] [CrossRef] [Green Version]
- Luo, H.; Guo, H.L.; Gao, Y.S.; Liu, J.J. A Study of Using Construction Waste and Recyclable Materials in Modern Landscape Design. IOP Conf. Ser. Earth Environ. Sci. 2018, 186, 012060. [Google Scholar] [CrossRef] [Green Version]
- Bakchan, A.; Faust, K.M.; Leite, F. Seven-dimensional automated construction waste quantification and management framework: Integration with project and site planning. Resour. Conserv. Recycl. 2019, 146, 462–474. [Google Scholar] [CrossRef]
- McAuley, B.; Hore, A.; West, R. BICP Global BIM Study—Lessons for Ireland’s BIM Programme; Construction IT Alliance: Dublin, Ireland, 2017. [Google Scholar]
Section | Main Content | Question Number | |
---|---|---|---|
Part 1 | Background of the participants | Occupation and duration | 1,2 |
BIM | Application of BIM in China | 3,4,5,6 | |
Waste and recycling | Waste of building materials in China and situation of recycling | 7,8,9,10,11,12 | |
part 2 | Proposed BIM-based recycling model | Feasibility of the model and advice on it | 13,14,15,16 |
Types | Number | Length | Number |
---|---|---|---|
Academic | 13 | 1–5 years | 20 |
Junior Manager | 17 | ||
Intermediate Manager | 6 | 6–10 years | 14 |
Senior Manager | 1 | 15+ years | 3 |
Total | 37 |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Share and Cite
Zhang, K.; Jia, J. Promotion of the Application of BIM in China—A BIM-Based Model for Construction Material Recycling. Recycling 2021, 6, 16. https://doi.org/10.3390/recycling6010016
Zhang K, Jia J. Promotion of the Application of BIM in China—A BIM-Based Model for Construction Material Recycling. Recycling. 2021; 6(1):16. https://doi.org/10.3390/recycling6010016
Chicago/Turabian StyleZhang, Kefei, and Jing Jia. 2021. "Promotion of the Application of BIM in China—A BIM-Based Model for Construction Material Recycling" Recycling 6, no. 1: 16. https://doi.org/10.3390/recycling6010016
APA StyleZhang, K., & Jia, J. (2021). Promotion of the Application of BIM in China—A BIM-Based Model for Construction Material Recycling. Recycling, 6(1), 16. https://doi.org/10.3390/recycling6010016