2.1. Kazakhstan’s Circularity Baseline for CDW Management
Firstly, an investigation was conducted to determine the level of circularity in CDW in Kazakhstan. This analysis compared the CDW treatment plans in Kazakhstan [
8] with those of European Union countries (EU28) [
9,
10]. Regrettably, the results indicated that many indicators pertinent to secondary raw materials (SRM), innovation, and green jobs are not being developed in Kazakhstan. This has resulted in a lack of statistical indicators or proxies available to measure progress in these areas. To accurately assess the CE baseline in Kazakhstan, several indicators under the green growth framework are required. These include waste generation intensity and recovery ratios, the share of renewable energy sources, demand-based CO
2 productivity, and carbon productivity based on demand.
The recovery rate of CDW in the construction sector across EU-28 countries was found to be impressive (up to 90%) [
11]. However, in Kazakhstan, this rate is only a minuscule 2.96% [
5]. One of the key principles of the CE is to design waste and pollution out of the system. Therefore, CE strategies must aim to reduce and recycle CDW production while simultaneously promoting the creation of closed-loop systems to manage this resource effectively.
Kazakhstan’s “Green Taxonomy” [
12] includes “green buildings” as a distinct classification, underscoring the strategic importance of adopting sustainable technologies in the construction sector. The taxonomy refers to international construction standards such as LEED, BREEAM, EDGE, and DGNB as benchmark indicators.
2.2. Kazakhstan’s Construction, Renovation, and Demolition Waste Management Activities
CDW is a diverse category that covers numerous materials, such as concrete, bricks, wood, glass, metals, and plastic. CDW also encompasses waste generated from the construction and demolition of buildings, infrastructure, road planning, and maintenance. While some components of CDW have high value, others can be reprocessed into new products or materials. Interestingly, recent research indicates that, on average, 95% of these materials are stored in buildings, while the remaining 5% end up in landfills [
13]. Separating and recovering CDW is a well-established, readily available, and generally inexpensive process (
Figure 1). However, hazardous materials such as solvents and asbestos can threaten the environment and require certain recycling efforts if not separated at the source.
Table 1 provides an overview of the estimated amount of waste generated in Kazakhstan in 2019, classified according to low- and high-value recovery potential. Nevertheless, Kazakhstan has not established a monitoring, recycling, or material recovery system for CDW. Since the material flow data for waste streams are unreliable, these estimations were made based on the material inputs to the sector, which were reported by national statistics [
14].
2.3. Cost–Benefit Assessment
The foundation of this project was laid upon the amendments made to the Environmental Code of Kazakhstan in 2016, which expanded the list of prohibited waste types in landfills, including CDW. As of December 2020, the disposal of CDW in conventional landfills was banned, leading to the establishment of specialized landfill sites for CDW by the municipal authorities, or Akimats, in major cities such as Astana and Almaty. During stakeholder consultations with landfill managers and representatives from the construction department, it became evident that the existing shredding technologies at these landfill sites were outdated and inadequate for effective recycling. The urgent need for new CDW recycling centers was identified to enhance recycling capabilities and maximize material recovery from CDW.
The project requires several key activities, some of which are not covered in this paper. These include identifying appropriate sites for constructing CDW recycling centres, selecting advanced recycling technologies tailored to CDW, and physically establishing these centres. The project aims to achieve several quantitative milestones, with the program implementation year (8 years) being a crucial one. Over a period of eight years, approximately 84 million tonnes of CDW will be recycled. The recycling operations will have a consistent annual capacity increase of 25%. Full-cycle CDW recycling centers will be successfully installed in eight major cities. The recycling process will achieve an impressive 95% efficiency rate.
To measure the effectiveness of the upgrades made to the CDW recycling centres, we utilized the annual amount of CDW recycled as the primary key performance indicator (KPI). This selection was made to establish a tangible and measurable means of monitoring progress toward our objectives and to fulfil the expectations of our stakeholders. By focusing on this specific metric, we can ensure that our efforts are concentrated on achieving our desired outcomes and that we can assess the impact of our initiatives accurately. The success of this endeavour was contingent upon the collaboration of various key stakeholders, including construction companies, Akimats (municipal authorities), landfill polygons (specialized landfill operators), regulatory governance bodies, supporting actors, and other related industries. These stakeholders were crucial in providing resources, expertise, and support throughout the project lifecycle. The key implementers of this project were the Akimats and landfill polygons. They were responsible for overseeing the construction and operation of the recycling centres, ensuring compliance with regulations, and facilitating the smooth execution of recycling activities.
The amount of construction, renovation, and demolition waste in Kazakhstan varies depending on the type of interventions and projects. For instance, the government plans to invest in 112 infrastructure projects worth KZT 5.5 trillion by 2025 [
15]. This includes constructing and reconstructing 10,000 km of roads and repairing 11,000 km of the road network throughout the country. The Nurly Zhol (
https://idfrk.kz/en/products/state-programs/nurly-zhol-2020-2025/) (accessed on 1 August 2023) initiative also allocates USD 9 billion to develop and modernize the country’s roads, railways, ports, airports, and IT infrastructure. Moreover, due to rapid urbanization, new construction is prioritized over re-urbanization activities. In Kazakhstan, CDW primarily originates from construction and renovation activities. Therefore, the country needs to focus on enhancing the design of construction projects; selecting more sustainable, durable, easy-to-maintain, and highly recyclable materials; and adopting sustainable production techniques. This approach will encourage a more circular value chain, promoting a more eco-friendly and sustainable environment.
The initial investment required for the CDW recycling renovation program (including assembling and commissioning): The installation cost of modern recycling encompasses the investment needed for facilities and infrastructure. A cost–benefit analysis was conducted for a large city context, estimating costs for eight active construction cities in Kazakhstan. The initial investment estimate was based on similar projects in the EU and obtained by direct communication with similar project holders, such as CDE RECO Solutions in Norway. The initial investment required to set up a recycling plant in Kazakhstan was estimated to be USD 5 million. It is proposed that these plants have a high capacity and the ability to process up to 300 tons of waste per hour.
According to the data obtained from Nur-Sultan landfill management during stakeholder engagement activities, it has been estimated that around 8.5 thousand tonnes of waste were received in the last three months of 2021, which translates to approximately 35 thousand tonnes per year. The total amount of waste generated in the country is estimated to be 9 million tonnes. Notably, landfilling is not allowed in the Ecological Code of the Republic of Kazakhstan. Therefore, 80% of the waste is expected to be sent to recycling centres, based on the EU’s objective to recycle 80% of construction and demolition waste. Additionally, there is a projected 25% annual increase in the total amount of waste collected annually.
The aim of the plants is to achieve an efficiency rate of 75% while recycling 84 million tons of waste in eight years. To achieve this goal, eight such plants will be required. Each of these eight plants is assumed to operate for 220 working days per year. The recycling process is expected to be carried out safely and in an environmentally friendly manner using modern technology and equipment (
Figure 1) to ensure that the recycling process is efficient and effective.
The percentage distributions of the costs are illustrated in
Figure 2. The reinvestment requirements are assumed to be 1% of the annual investment cost. Operating costs include administrative costs of project and service provision and are estimated to be the same as the reinvestment cost, adding another 1% on top of the project cost per year. Operating costs are estimated based on the required personnel and average wage payments. The technical requirements include support from the service technology providers and consultation, along with other expenses for research and development, which is also estimated to be USD 400,000 in total for the program implementation time.
Benefits (cost saving for construction/demolishing through recycling rather than landfilling): The primary output of CDW recycling operations is mostly aggregate, which can replace virgin materials in various sectors. This is an essential aspect of the project, as it helps conserve natural resources and reduces the need to extract and transport virgin materials. The recycled products generated from CDW have a considerable commercial value, which is a significant monetary benefit of the project. For instance, the selling price for gravel and similar products in the region is approximately USD 10 per ton, assuming a 95% recovery rate based on current experience in the polygons. This means that the project has the potential to generate considerable revenue, making it a viable and sustainable solution for waste management. The calculated cash flow of the project is illustrated in
Figure 3.
The key findings of this research indicate a potential to recycle up to 84 million tons of construction and demolition waste (CDW) over ten years, resulting in an annual 25% national capacity increase in recycling (
Figure 4). Moreover, installing full-cycle CDW recycling centres in major cities will ensure up to 95% recycling efficiency. A net cost-discounted evaluation of the project has been calculated, which shows that the project would cost approximately USD 48 million. The project’s cost–benefit ratio is 0.59, indicating that its costs exceed its benefits. The payback period is estimated to be 9.91 years, indicating that the initial investment will be recovered within this period. Overall, these findings highlight the potential of the project to reduce CDW and contribute to a more sustainable environment while generating economic benefits for the stakeholders involved.
2.4. Co-Benefits Assessments
In the quest for sustainable development and responsible waste management practices, upgrading CDW recycling centres in KZ has undergone a comprehensive cost–benefit analysis. This analysis assesses the positive impacts and ancillary benefits this project will bring to Kazakhstan’s communities, environment, and economy. The primary objective of this project is to achieve a substantial reduction in waste through the recycling of low-grade CDW generated in major cities. Over eight years, this translates to diverting a significant 84 million tons of CDW from traditional landfill disposal. This achievement represents a remarkable commitment to sustainable waste management practices, effectively addressing environmental concerns associated with waste accumulation. While precise national-level data on energy reduction are currently unavailable, a qualitative assessment reveals the potential for significant energy savings. The project’s assumption that recycled CDW, specifically gravel, requires significantly less energy for production strongly indicates its energy-efficient approach. By potentially reducing energy requirements by up to 72% compared to raw material production, the project aligns with broader sustainability goals and showcases its potential to enhance energy conservation within the construction sector.
The project’s impact on pollution reduction associated with raw construction material production is notably high, even in the absence of precise national-level data. By targeting reductions in related greenhouse gas (GHG) emissions by up to 70%, resulting in a quantified reduction of 2.6 ktCO2e and a significant decrease in photochemical smog production by up to 87%, the project underscores its commitment to mitigating environmental pollution. These reductions translate to improved air quality, reduced environmental harm, and potential health benefits for the populace, underlining its substantial positive environmental impact.
The project’s emphasis on recycling CDW generates an environment conducive to job creation. While precise national-level employment data are currently unavailable, establishing recycling centres, logistical operations, and emerging new markets for recycled materials is anticipated to result in high employment opportunities. This aligns with the project’s overarching goal of stimulating local economic development and providing increased livelihood prospects for the community. While the economic impact on a sectoral level is categorized as moderate, this project significantly contributes to enhancing the competitiveness and sustainability of the construction sector. Recycling CDW offers a more sustainable and cost-effective alternative to raw material usage in construction.
Although the cost differential may not be highly significant for contractors, the project’s additional benefits, such as reduced environmental impacts and enhanced resource efficiency, underscore its vital role in promoting a more competitive and environmentally responsible construction industry.
2.5. Financial Options for the Project Implementation
The upgrading project for the CDW recycling centres in Kazakhstan is estimated to cost USD 48 million. To fund this initiative, a combination of financing options has been proposed. The primary funding source is private-sector financing, which will be facilitated through a public–private partnership (PPP) arrangement. Additionally, the municipality will provide the land required for the project. The funding plan is summarised in
Figure 5, and the implementation period is suggested to be 1 to 4 years.
It is suggested that the project’s funding strategy allocates a significant portion, up to 30%, to private-sector financing through a PPP model. This approach involves collaboration between the public sector (municipality) and private investors, leveraging the strengths of both sectors to secure the necessary funds. This allocation aligns with best practices for infrastructure development projects, where private sector involvement can contribute expertise, capital, and operational efficiency. The project’s reliance on the municipality for the provision of land is a practical approach, as it reduces the initial capital burden on the project. The municipality’s land allocation reduces costs and ensures that suitable sites are made available for the recycling centre’s construction. The project’s implementation period spans from Years 1 to 4. This timeline is reasonable for the development of a large-scale CDW recycling centre. It allows for careful planning, design, and construction and the initiation of operational activities within a realistic timeframe. The inclusion of private-sector financing through a PPP model indicates a commitment to leveraging private investment and expertise in waste management. This approach can lead to efficient project execution, improved technology adoption, and potentially reduced financial risks for the municipality. While the initial capital investment is substantial, it is essential to consider the long-term financial sustainability of the recycling centre. Revenue generation from recycling operations, cost recovery mechanisms, and potential income streams from recycled materials should be evaluated to ensure the project’s financial viability beyond the implementation period. The PPP model can help mitigate certain project risks, such as construction delays, operational challenges, and cost overruns, by sharing responsibilities and risks between the public and private sectors. A well-structured PPP agreement should address risk allocation and dispute resolution mechanisms. During the implementation period, close monitoring and accountability mechanisms should be in place to ensure that funds are utilized efficiently and per the project’s objectives. Transparent financial reporting and performance evaluation will be critical.
2.6. Comparison with Neighbouring Countries
In addition to presenting the implementation of CDW recycling centers in Kazakhstan, this study expands its scope to include a comparative analysis with other Central Asian countries such as Uzbekistan, Kyrgyzstan, Turkmenistan, and Tajikistan. This comparison can be helpful in understanding the broader applicability of the findings developed in this study.
In Uzbekistan, recycling rates are claimed to be in their nascent stage; around 23% of total waste is recycled (including CDW) [
16,
17], while the waste management strategy aims for 60% to be recycled. The recent agreement on waste-to-energy plants and other waste treatment initiatives [
18] demonstrates the country’s readiness for the adoption of CDW sustainable initiatives and significant recycling market potential, similar to Kazakhstan. While social commitment to sustainable waste practices is active in Kyrgyzstan, governmental legislative actions do not clearly state recycling rates and CDW recycling goals [
19,
20].
Similarly, there are no clear statistics concerning the recycling rates of construction waste in Turkmenistan and Tajikistan, nor the countries’ waste recycling goals. The data on specific facilities for CDW recycling in Central Asian countries and, particularly, recycling centers is either limited (e.g., in Uzbekistan) or not readily available. In general, disparities in the application and execution of legal and regulatory frameworks among Central Asian countries, influenced by variations in socioeconomic status, lead to uneven enforcement capabilities of legal and regulatory measures [
21].
Thus, the cost–benefit assessment of upgrading CDW recycling centers in Kazakhstan can benefit the whole Central Asian region by providing information for sustainable waste management practices and catalyzing positive environmental changes across the region. The implementation process can provide valuable insights for other countries with similar backgrounds, especially from the Central Asian region.