Next Article in Journal
Real-Time Road Hazard Information System
Next Article in Special Issue
Roof Isolation and Girder-to-Column Dissipative Connections in Seismic Design of Precast R/C Structures
Previous Article in Journal
Cost Overruns in Tunnelling Projects: Investigating the Impact of Geological and Geotechnical Uncertainty Using Case Studies
 
 
Article

Article Versions Notes

Infrastructures 2020, 5(9), 74; https://doi.org/10.3390/infrastructures5090074
Action Date Notes Link
article pdf uploaded. 8 September 2020 15:06 CEST Version of Record https://www.mdpi.com/2412-3811/5/9/74/pdf-vor
article xml file uploaded 9 September 2020 12:48 CEST Original file -
article xml uploaded. 9 September 2020 12:48 CEST Update -
article pdf uploaded. 9 September 2020 12:48 CEST Updated version of record https://www.mdpi.com/2412-3811/5/9/74/pdf-vor
article html file updated 9 September 2020 12:50 CEST Original file -
article xml file uploaded 10 September 2020 07:47 CEST Update -
article xml uploaded. 10 September 2020 07:47 CEST Update https://www.mdpi.com/2412-3811/5/9/74/xml
article pdf uploaded. 10 September 2020 07:47 CEST Updated version of record https://www.mdpi.com/2412-3811/5/9/74/pdf
article html file updated 10 September 2020 07:48 CEST Update -
article html file updated 22 July 2022 06:26 CEST Update https://www.mdpi.com/2412-3811/5/9/74/html
Back to TopTop