1. Introduction
Various kinds of renewable energy have been so far integrated into electrical power distribution networks in the form of Distributed Generation (DG) systems to reduce societys’ dependence on fuel resources. Meanwhile, Energy Storage Systems (ESSs) are also connected to the network. The grid-connected DGs and ESSs greatly change the characteristics of the network and complicate the operation optimization, and the intermittence of renewable energy poses risks to the operation of the whole network. To address these issues, active management of the network and DGs/ESSs has been broadly utilized, suppressing the intermittence of the renewable energy and reducing the peak-valley differences of the loads. The active management also puts off the upgrade of power facilities [
1,
2], improves the power supply reliability, and results in the conversion of the traditional distribution network into an Active Distribution Network (ADN).
To date, abundant research have been done on the active management and operation optimization of grid-connected DGs/ESSs. Some forms of renewable energy, e.g., wind generation and photovoltaic arrays,
etc., are intermittent and thus increase the fluctuation of the net load of the ADN lines. High power density ESS [
3,
4] has been utilized to suppress the short-term power fluctuation, while high energy density ESS is utilized to smooth the renewable energy power in the long term [
5,
6], as well as reduce the peak-valley load differences of ADN lines [
7,
8]. Hybrid storage systems, consisting of both high power density ESS and high energy density ESS, by combining the merits from these two types of the ESS, are regarded as more advantageous [
9,
10,
11]. The real-time control of ESSs suppresses the impact of intermittent energy sources on the network, however, operation optimization of the whole network should be considered in the real-time control of ESS. Different ADN optimization models considering the line losses or electricity costs are presented in [
12,
13], and optimization strategies are discussed in [
14,
15] for the operation of combined heating, cooling and power systems. Since the powers of individual DGs/ESSs are the variables that need to be optimized in the optimization, the computation cost increases rapidly with the number of DGs/ESSs considered. Moreover, various kinds of DGs, ESSs, loads and networks are combined into a system, which is able to actively regulate its power. The power regulating ability is one of the key distinctions of ADNs from traditional distribution networks, and this has not been well studied yet.
In this work, the power supply and storage capacity of the network is analyzed, and a long-term operation optimization model is proposed based on the capacity to maximize the DG/ESS economic benefits. Within an ADN line, the Local Autonomy Control Region (LACR), which consists of DGs/ESSs, loads and network, is operated as a whole. The power supply & storage capacity index of the LACR is proposed to quantify the maximum power regulation range of the LACR, considering both the DG/ESS power constraints and the network restrictions. The power supply and storage capacity index of an ADN line is also presented to quantify the maximum power exchanged between adjacent ADN lines through tie switches. Practical algorithms are used to calculate the power supply and storage indexes, and an operation optimization model of an ADN line based on the indexes is proposed to maximize the economic benefits of DG/ESS. The power supply reliability of the ADN line is also considered in the optimization. Finally the indexes of power supply and storage capacity and the optimization are demonstrated in a case study.
2. Power Supply & Storage Capacity of Local Autonomy Control Region
According to the survey of the CIGRE C6.11 working group, active distribution networks are distribution networks that have systems in place to control a combination of Distributed Energy Resources (DERs) [
16], and have the ability to manage the electricity flows. With the active management of DERs and electricity flows, feeders of the traditional distribution network are converted to ADN lines. Within an ADN line, part of the DERs and loads make up a Local Autonomy Control Region which is managed and operated as a whole to reduce the optimization computation cost and relieve the communication pressure between the control center and DERs [
17,
18]. As shown in
Figure 1, three LACRs exist in ADN line A and line B. The area of the LACR is generally specified according to the topological connection and the allocation of the autonomic controller. The branch with an autonomic controller and more than one DER is regard as a LACR. The autonomic controller receives the control target of the whole LACR from the control center, and coordinates the operation of DERs within the LACR, according to that control target.
Figure 1.
ADN line and local autonomy control region.
Figure 1.
ADN line and local autonomy control region.
The maximum export/import power of LACR needs to be calculated so that the LACR could be regarded as a whole in the operation optimization of the ADN line. The power supply and storage capacity of the LACR is defined as the maximum export/import real power of the LACR, considering power constraints of DGs/ESSs as well as any restrictions of node voltage and maximum branch current. The power supply capacity of the LACR is the maximum export power (power
α in
Figure 1), whose positive direction is defined as injecting into an ADN line, while the power storage capacity is the maximum import power of LACR (power
β in
Figure 1), whose positive direction is defined as injecting into the LACR. The power constraints of DGs/ESSs, node voltage restrictions, branch current and SOC of ESSs are considered in the calculation of the capacity, as discussed below.
2.1. Power Constraints of Distributed Generation
DGs can be classified into two categories according to their power controllablity: power controllable DGs and uncontrollable DGs. The power of biomass power generators, micro gas turbines or fuel cells is controllable, while the wind generation and photovoltaic cell power is intermittent and dependent on the weather. The power restrictions of the two types of DG are shown in Equation (1):
where
Fctrl is the set of power controllable DGs;
Pi is the power of the
ith power-controllable DG; while
and
are the minimum operating power and the rated power;
Finte is the set of power uncontrollable DGs;
Pj is the power of
jth power-uncontrollable DG; and
is the expected maximum power according to the weather forecast. Some of the intermittent renewable energy generators have the ability to adjusting the power by changing the operating point, but in order to maximize the exploitation of renewable energy, the renewable energy generators are assumed to be operated at their maximum power point according to the power forecasting.
2.2. Power Constraints of Energy Storage System
The charging/discharging power of an ESS is subjected to both constraints of rated power and constraints of the ESS’ SOC. The change of SOC during charging/discharging is calculated by Equation (2):
where
ΔSoc(Δ
T) is the change of SOC during time period of [
T,
T +
ΔT];
μ and
η are charging/discharging efficiencies respectively;
Pc and
Pd are charging/discharging power;
ER is the rated energy capacity of the ESS.
As excessive charging or discharging may cause damage to the ESS, Equation (3) should be satisfied:
where
Soc(
T) is the SOC at time
T; while
and
are the upper and lower limitation of SOC respectively. After the charging/discharging in the time interval [
T,
T +
ΔT], the value of SOC at
T +
ΔT should satisfy the Inequation (3). Then Inequation (4) is derived according to Equations (2) and (3), ignoring the power changes during [
T,
T +
ΔT]. The symbols in Equation (4) have the same meaning with those in Equations (2) and (3):
The power constraints of ESS are shown as Equation (5), considering constraints of both SOC and rated charging/discharging power.
and
are the rated charging/discharging power,
and
are the maximum charging/discharging power calculated according to the constraints:
2.3. The Model of Power Supply & Storage Capacity of Local Autonomy Control Region
The power supply and storage capacity of a LACR is the maximum power that the LACR can supply to or receive from an ADN line, considering both the power constraints of the DG/ESS and constraints of node voltages and branch currents. The model of the capacity is given by Equations (6)–(8), in which, Equations (6) and (7) are the objective functions and Equation (8) are the constraints:
In Equations (6) and (7),
,
are the power supply and storage capacity to be calculated. The computations of “∑”, “+”, “−” are calculated by the power flow method, in which network losses are considered.
FESS is the set of ESSs inside the LACR, and
FL is the set of loads.
Pc,k and
Pd,k are the charging and discharging power of the
kth ESS.
Pl is the power of
lth load.
Equation (8a) is the node voltage restriction, where Vmax and Vmin are the upper and lower node voltage limitations. Equation (8b) is the branch current restriction, where Ib,Rated is the rated maximum current of the bth branch. Equation (8c) is the power constraint of power controllable DGs, and Equations (8d,e) are charging/discharging power constrains of ESSs.
The positive direction of the power supply capacity of the LACR is defined as power injected into the ADN line, while that of the power storage capacity is defined as power received from the ADN line. A LACR may have the characteristics of power controllable DGs, power controllable loads or storage systems, according to the value of its power supply and storage capacity.
As shown in
Figure 2, positive power supply capacity and negative storage capacity indicate that the maximum power supplied by DGs/ESSs in the LACR is greater than the power of loads, and the LACR has the characteristic of power controllable DGs. On the contrary, negative power supply capacity and positive storage capacity means that the maximum power supplied by DGs/ESSs is smaller than the power of loads, and the LACR has the power controllable load characteristics. Besides, if both power supply capacity and storage capacity are positive, the power regulating range of the LACR is large, and the LACR is regarded as having the energy storage system characteristics.
Figure 2.
Characteristics of a LACR according to the power supply/storage capacity.
Figure 2.
Characteristics of a LACR according to the power supply/storage capacity.
3. The Power Supply & Storage Capacity of ADN Line
The power supply and storage capacity of an ADN line denotes the maximum power exchanged between adjacent ADN lines, as shown in
Figure 3. In
Figure 3a, since a fault occurs in line B, the load of line B is transferred to line A by closing tie switch I-II, and the power supply capacity of line A indicates the maximum power supplied to the ADN line B through the two tie switches. Supposing excessive renewable energy exists in line B, as shown in
Figure 3b, then in order to maximize the exploitation of the renewable energy, the network is reconfigured and the excessive renewable energy of line B is consumed or stored by line A. The power storage capacity of line A indicates the maximum power injected into line A through tie switch I-II by line B.
Figure 3.
(a) Power supply capacity of ADN line; (b) Power storage capacity of ADN line.
Figure 3.
(a) Power supply capacity of ADN line; (b) Power storage capacity of ADN line.
In
Figure 3 there is more than one tie switch between the ADN lines, and the power supply and storage capacity is the maximum summation of the power transmitted by all the tie switches. If there is no adjacent line, the power supply and storage capacity of ADN line is 0.
The model of power supply and storage capacity of ADN line is shown in Equations (9)–(11):
Subject to:
where
and
are the supply capability and storage capability of ADN line;
PB is the power injected into ADN line by high-voltage distribution network;
Pm is the power of
mth LACR, whose positive direction is defined as injecting into the ADN line;
Pi is the power of the loads outside the LACR. Equations (11a,b) are the constraints of node voltage and branch current. Equation (11c) is the power restriction of the LACR, and
,
are the power supply capability and storage capability of the
mth LACR, respectively, which are calculated by Equations (6) and (7). Equation (11d) is the power constraint of the high-voltage grid. The power of the high-voltage grid injected into ADN line should be positive. The network loss is considered in the computation of “∑”, “+” and “−”. Other symbols in Equations (9)–(11) have the same meaning as those in Equations (6)–(8).
4. Algorithm of the Power Supply & Storage Capacity of the LACR and ADN Line
The power supply and storage capacity of the LACR and ADN line are proposed in order to reduce the calculation costs and complexity of the operation optimization of DGs/ESSs and ADN lines. Therefore the algorithm used for calculating the capacity should be practical.
Both the node voltage and branch current of the network will change with the DG/ESS power. As the constraints of node voltage and branch current are considered in the model of power supply and storage capacity, the change of voltage and current caused by DGs/ESSs need to be quantified.
The voltage deviation rate [
19] of the network is defined in Equation (12), which indicates the voltage deviation of all the nodes in the network from the nominal voltage:
where
Ui and
Pi are the voltage and real power of
ith node;
M is the count of nodes in the network;
Unom is the nominal voltage, while
Umin and
Umax are the lower and upper limitation of the voltage according to the voltage quality standard.
Unom,
Umin and
Umax are constants. Taking a medium distribution network for instance,
,
and
. |
Pi| is regarded as the weight of the voltage deviation of the
ith node. The smaller the voltage deviation of the nodes in the network, the smaller the value of
RD, and
RD will be 0 if the voltage of all the nodes is equal to the nominal voltage. The loading rate of the network is defined in Equation (13), which indicates the mean loading rate of all the cables and overhead conductors in the network:
where
Ij is the current of
jth conductor; and
Ij,max is the rated maximum current of the conductor;
RL is the mean loading rate of the whole network.
The value of
RD and
RL will change with the power of DG/ESS, and the changes of
RD and
RL are regards as the impact of DG/ESS on the network. The impact factor of
kth DG/ESS is defined as Equation (14), in which, Δ
Pk is the power change of the
kth DG/ESS, Δ
RD and Δ
RL denote the changes of
RD and
RL caused by Δ
Pk:
The impact factor is different for different DGs/ESSs. The value of Ck is dependent on the topological connection of the DGs/ESSs and the branch current of the network.
A stepwise optimization method is implemented to calculate the power supply and storage capacity. The power of DG/ESS is initialized to 0, then a loop is started, in which the impact factors os DGs/ESSs on the network are calculated and the power of the DG/ESS with the minimum impact factor is increased by one power step. Constraints are verified in the loop, and the loop will stop if the constraints are not satisfied. The algorithm processes for power supply and storage capacity of the LACR and ADN line are discussed below.
4.1. Algorithm of Power Supply and Storage Capacity of the LACR
In the proposed algorithm procedure, the DGs/ESSs in LACRs are sorted according to their impact factor on the network, and the power of the DG/ESS with the minimum impact factor is increased by one power step. The constraints in Equation (8) are also verified in the loop. The algorithm procedure of the power supply capacity of LACR is described as follows:
- (1)
Initialization. The power of all DGs/ESSs in the LACR is initialized to 0, and the upper and lower limitation of DGs’/ESSs’ power are calculated according to the power constraints discussed in
Section 2.1 and
Section 2.2. A list is created which consists of all the DGs/ESSs inside the LACR, and the loop starts.
- (2)
The impact factors of each DG/ESS are calculated according to Equation (14).
- (3)
The DGs/ESSs in the list created in step (1) are sorted according to their impact factors. The power of the DG/ESS with the minimum impact factor is increased by one power step.
- (4)
Constraints Verification. The constraints stated in Equation (8) are verified in the loop. If any constraint cannot be satisfied, cancel the power increment in step (3), and remove the DG/ESS from the list.
- (5)
If all the DGs/ESSs are removed from the list, the loop stops and go to step (6), else go to step (2).
- (6)
Power flow algorithm is executed to calculate the total power of the LACR supplied to the ADN line which is the power supply capacity of the LACR.
The block diagram of the power supply capacity calculation of the LACR is depicted in
Figure 4. The calculation process of the power storage capacity of the LACR is similar to that of the power supply capacity, while the different exists in the step (3): the power of DG/ESS with the minimum impact factor decreases by one step or the discharging power increases.
Figure 4.
Block diagram of calculating the power supply capacity of the LACR.
Figure 4.
Block diagram of calculating the power supply capacity of the LACR.
4.2. Algorithm of the Power Supply & Storage Capacity of ADN Line
The power supply capacity of the ADN line is equal to the maximum power supplied to an adjacent line through a closed tie switch. In order to calculate the power supply capacity of an ADN line, the adjacent line is assumed to be a virtual power-controllable load, and PV is used to represent the power of the virtual load. During the iterations, the value of PV increases step by step and the constraints stated in Equation (11) are verified. If any of the constraints is not satisfied, the loop stops and the value of power supply capacity of ADN line is equal to PV. If there is more than one tie switch between the two ADN lines, the adjacent line is assumed to be the same amount of virtual power-controllable load, and the power supply capacity is equal to the maximum total power of all virtual loads.
Figure 5.
Block diagram of calculating the power supply capacity of an ADN line.
Figure 5.
Block diagram of calculating the power supply capacity of an ADN line.
The process of the algorithm is shown in
Figure 5. The iteration process of computing the power storage capacity of an ADN line is similar to that of power supply capacity, while a difference exists in the assumption of the adjacent line. The adjacent line is assumed to be a virtual energy source (P-Q bus), and the maximum power of the virtual energy source is the power storage capacity of the ADN line.
5. Operation Optimization of an ADN Considering the Power Supply Reliability Based on the Power Supply and Storage Capacity
An operation optimization model is proposed in this section based on the aforementioned power supply and storage capacity of an LACR and ADN lines. With the active management of power controllable DGs and ESSs, the operation optimization of ADN brings economic benefits. The requirement for the network backup capacity will be reduced with the reduction of load peak-valley differences. The investment of upgrading the power facilities are postponed with the peak shaving, and the network losses are also reduced. The objective of the operation optimization in this paper is to maximize the economic benefits of ADN during 24 h. The LACR in the ADN line is operated as a whole, and the power of the LACR in 24 h is the variable to be optimized.
The economic benefit is calculated as Equation (15), in which the benefit consists of four parts: reduction of peak shaving cost, generation benefit of DGs, reduction of the network loss and the benefit of ESS charging/discharging at different electricity prices:
In Equation (15)
Eps is the energy of peak shaving of DG/ESS; and
pps is the peak shaving cost of the grid;
ED,g is the energy generated by power controllable DG; and
p(
t) Δ
Eloss is electricity price at time
t; is the reduction of the network loss;
is the energy discharged by ESS. A positive value of
denotes discharged energy, while a negative value denotes charged energy.
The power supply reliability of an ADN line is considered in the optimization. When a fault occurs in an ADN line, the network is reconfigured, and the load of the faulty line is transferred to adjacent lines [
20]. The maximum load transfer capacity of the ADN line is quantified by its power supply capacity according to the definition of the power supply capacity of the ADN line. Therefore, the constraint of power supply reliability is expressed as Equation (17a), in which
is the power supply capacity of the ADN line at time
t, and
PR is the outage load that needed to be transferred. The optimization model is shown by Equations (16) and (17):
The symbols in Equation (16) have the same meaning as those in Equation (15). Equation (17a) is the constraint of power supply reliability, and Equation (17b) is the power constraint of the
kth LACR.
Pk(t) is the power of the
kth LACR at time
t, and the positive direction of is to inject into the ADN line.
,
are the power supply/storage capacity of the
kth LACR, which are the upper and lower limitations of
Pk(t). Equations (17c,d) are the constraints of node voltage and branch current. Since the LACR is operated as a whole, the count of variables to be optimized is reduced. The power supply and storage capacity quantifies the power regulating range of the LACR and the maximum power supplied to adjacent lines, which reduces the count of constraints. Accordingly, the computation cost and complexity are reduced by applying the power supply and storage capacity in the optimization model.
6. Case Study
The methodology presented in this paper is tested using a 10 kV active distribution network with three DGs, two ESSs and 22 loads, as shown in
Figure 6. The network consists of two lines: line A and line B, and the two lines are connected together through one tie switch. Two LACRs exist in line A, and the rated maximum apparent power of the wires in the network is 4 MVA. The objective of line A’s operation optimization is to maximize the economic benefits. The power supply reliability of line B is considered in the optimization of line A, and the load of line B will be transferred to line A if fault occurs at line B. The optimization model is given by Equations (16) and (17).
Figure 6.
Topological connection of ADN.
Figure 6.
Topological connection of ADN.
The electrical specifications of the DGs/ESSs are shown in
Table 1. ES1, ES2 and MT are dispatchable. The minimum operating power of MT is 10 kW, and the contract energy generated in 24 h is 2000 kWh. ES1 and ES2 are sodium-sulphur battery (NAS) energy storage systems. In practice, NAS batteries are limited to discharge less than 90% of their theoretical capacity to limit the corrosive properties of the material [
21]. Correspondingly the upper and lower limitations of SOC in this case are set to 95% and 10%, respectively. The wind generation power is dependent upon wind speed, as shown in
Figure 7. The electricity price is 0.68 CNY/kWh during the time [
9,
22], and is 0.33 CNY/kWh for the rest of the time. [
17,
19] period is peak time while [
5,
7] is the valley time. The peak shaving cost of the grid is 0.167 CNY/kWh [
22].
Table 1.
Electrical specifications of the DGs/ESSs.
Table 1.
Electrical specifications of the DGs/ESSs.
Name | Type | Rated power | Energy capacity | Min operating power |
---|
ES1 | NAS battery energy storage | 300 kW | 2400 kWh | 0 |
ES2 | NAS battery energy storage | 200 kW | 1600 kWh | 0 |
MT | Micro turbine | 280 kW | - | 10 kW |
WG1 | Wind generation | 500 kW | - | - |
WG2 | Wind generation | 1000 kW | - | - |
Figure 7.
Load of ADN and power of wind generator.
Figure 7.
Load of ADN and power of wind generator.
The total load of ADN lines and the power of wind generations during 24 h are shown in
Figure 7. The peak and valley load of line A are 3.65 MW and 1.65 MW, respectively, and the mean load is 2.61 MW. The mean square error of the load is 3.15 × 10
11. The power intermittence of wind generation increases the power fluctuation of line A. A genetic algorithm is implemented to solve the optimization.
Figure 8 shows the optimum result of the charging/discharging power and SOC of ES1, ES2.
Figure 8.
(a) Power of ES1 and ES2 after the optimization; (b) SOC of ES1 and ES2.
Figure 8.
(a) Power of ES1 and ES2 after the optimization; (b) SOC of ES1 and ES2.
As shown in
Figure 8, ES1 and ES2 charge during [0,8], and discharge during [
10,23], maximizing the benefits of charging/discharging at different electricity prices. The discharging power reaches the rated ESS discharging power during the peak time, and the charging power reaches the rated charging power during the valley time, maximizing the energy of peak shaving.
Figure 9 shows the power of MT and the net load of line A after the optimization. As the contract energy of MT generated in 24 h is 2000 kWh, MT stops when the electricity price is 0.33 in order to maximize the benefit of electricity generation, and operates at its rated power during the peak time to maximize the energy of peak shaving. The peak-valley difference of the net load of line A is reduced from 2.33 MW to 1.05 MW after the optimization, as shown in
Figure 9b.
Figure 9.
(a) Power of MT after the optimization; (b) Net load of line A after the optimization.
Figure 9.
(a) Power of MT after the optimization; (b) Net load of line A after the optimization.
Without the operation optimization, ES1 and ES2 are assumed to charge/discharge at constant power considering the electricity price, and MT also operates at constant power during [
7,23], as shown in
Figure 10. The economic benefits of ADN with/without optimization are compared in
Table 2.
Figure 10.
Operations of ES1, ES2 and MT without optimization.
Figure 10.
Operations of ES1, ES2 and MT without optimization.
Table 2.
Comparison of economic benefits with/without the optimization.
Table 2.
Comparison of economic benefits with/without the optimization.
Operation | Benefit of peak shaving | Generation benefit of MT | Benefit of loss reduction | Benefit of electricity price difference of ESS |
---|
Without optimization | 2194 kWh | 366 CNY | 1272 CNY | 594.7 kWh | 527.8 CNY | 998 CNY |
With optimization | 3812 kWh (174%) | 637 CNY (174%) | 1360 CNY (107%) | 736.7 kWh (124%) | 644.5 CNY (122%) | 1141 CNY (114%) |
Compared with the operation without optimization, the benefits of peak shaving and loss reduction increase by 74% and 22%. The generation benefit of MT and benefit of electricity price difference of ESS increase by only 7% and 14%, that is because the change of electricity price has already been considered in the operation of ESSs and MT without optimization, as shown in
Figure 10. The total benefit is 3782 CNY after the optimization, while that is 3163 CNY before the optimization.
The power supply & storage capacity of LACR1 and LACR2 in the optimization are shown in
Figure 11. The optimized power of LACR1 and LACR2 are regulated within the power adjustable ranges determined by their power supply and storage capacity, and the Constraint (17b) is satisfied. The load is light in LACR1, and is less than the power of ES1 and WG1. Both of the power supply capacity and storage capacity of LACR1 are positive most of the time, as shown in
Figure 11a, and LACR1 has energy storage system characteristics. LACR2 consists of ES2, MT and WG2, and the load is heavy in LACR2. The power supply capacity of LACR2 is negative most of the time, as shown in
Figure 11b, and LACR2 has power controllable load characteristics.
Figure 11.
(a) Power supply and storage capacity and actual power of LACR1; (b) Power supply & storage capacity and actual power of LACR2.
Figure 11.
(a) Power supply and storage capacity and actual power of LACR1; (b) Power supply & storage capacity and actual power of LACR2.
Power supply reliability is considered in the optimization. The power supply capacity of line A before and after the optimization are calculated, as shown in
Figure 12. The fault is assumed to occur at the outlet breaker of line B, and all the loads of line B need to be transferred to line A. During the time period [
18,
20] the loads of both line A and line B are heavy, and the power supply capacity of line A before the optimization cannot meet the requirement of the load transfer of line B. The operation optimization increases the power supply capacity of line A during the peak hours, and consequently the constraint of power supply reliability is satisfied.
Figure 12.
Power supply capacity of ADN Line A after optimization.
Figure 12.
Power supply capacity of ADN Line A after optimization.
The computation cost of the optimization based on the power supply and storage capacity of the ADN is compared with that based on individual DGs/ESSs, as shown in
Table 3. Both the optimization models are resolved by a genetic algorithm. Since the application of power supply and storage capacity reduces the number of variables and constraints in the optimization model, the number of iterations of the algorithm is reduced obviously (from 162 to 103). The power supply and storage capacity are calculated in the iteration of the algorithm, which increases the calculation time of the single cycle in the iteration. However, the total calculation time of the optimization based on power supply and storage capacity is reduced (from 215 s to 187 s).
Table 3.
Computation cost comparison of the optimization in different models.
Table 3.
Computation cost comparison of the optimization in different models.
Optimization model | Algorithm | Number of iterations | Calculation time |
---|
Based on individual DG/ESS, without power supply &storage capacity | GA | 162 | 215 s |
Based on power supply & storage capacity | GA | 103 (63.2%) | 187 s (87.0%) |
The calculation time is reduced by 13% with the application of power supply and storage capacity in the study case, in which there are only two ESSs and one DG to be optimized. As the number of DGs/ESSs increases, the benefit of applying the power supply and storage capacity will be more significant.