Nikjow, M.A.; Liang, L.; Qi, X.; Sepasgozar, S.M.E.; Chileshe, N.
Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. Sustainability 2021, 13, 9503.
https://doi.org/10.3390/su13179503
AMA Style
Nikjow MA, Liang L, Qi X, Sepasgozar SME, Chileshe N.
Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. Sustainability. 2021; 13(17):9503.
https://doi.org/10.3390/su13179503
Chicago/Turabian Style
Nikjow, Mohammad Ajmal, Li Liang, Xijing Qi, Samad M. E. Sepasgozar, and Nicholas Chileshe.
2021. "Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects" Sustainability 13, no. 17: 9503.
https://doi.org/10.3390/su13179503
APA Style
Nikjow, M. A., Liang, L., Qi, X., Sepasgozar, S. M. E., & Chileshe, N.
(2021). Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. Sustainability, 13(17), 9503.
https://doi.org/10.3390/su13179503