Next Article in Journal
Challenging Tendering-Phase Factors in Public Construction Projects—A Delphi Study in Saudi Arabia
Next Article in Special Issue
Improving Design Quality by Contractor Involvement: An Empirical Study on Effects
Previous Article in Journal
Response Modification Factors for Multi-Span Reinforced Concrete Bridges in Pakistan
Previous Article in Special Issue
Analysing Gender Issues in the Australian Construction Industry through the Lens of Empowerment
 
 
Article

Article Versions Notes

Buildings 2022, 12(7), 922; https://doi.org/10.3390/buildings12070922
Action Date Notes Link
article pdf uploaded. 29 June 2022 17:03 CEST Version of Record https://www.mdpi.com/2075-5309/12/7/922/pdf-vor
article xml file uploaded 30 June 2022 12:37 CEST Original file -
article xml uploaded. 30 June 2022 12:37 CEST Update https://www.mdpi.com/2075-5309/12/7/922/xml
article pdf uploaded. 30 June 2022 12:37 CEST Updated version of record https://www.mdpi.com/2075-5309/12/7/922/pdf
article html file updated 30 June 2022 12:38 CEST Original file -
article html file updated 12 August 2022 23:20 CEST Update https://www.mdpi.com/2075-5309/12/7/922/html
Back to TopTop