Site Measurement Study on Mechanical Properties of SMW Piles of Building Structures in Sandy Soil Areas
Abstract
:1. Introduction
2. Retaining Structures of the Foundation Pit
3. Site Measurement Design
3.1. Selection of Measured SMW Piles
3.2. Layout of Stress Monitoring Points
3.3. Main Construction Conditions
4. Stress Analysis of H-Shaped Steel in Measured SMW Piles
- (1)
- Under construction condition 1, the excavation depth of the foundation pit was only −2.01 m, and the first layer of supports was set. The lateral soil pressure was small, so the overall stress of the H-shaped steel was small. The maximum tensile and compressive stresses occurred in Section 1 at −3.31 m, and the stress values were 14.9 MPa and −20.1 MPa, respectively. The reason why the absolute value of compressive stress was larger is that in addition to the normal stress generated by the bending moment, the compressive stress generated by axial pressure was also superimposed on this section. The axial pressure can be considered to be mainly caused by the vertical force transmitted by the first supporting system to the SMW pile through the crown beam. At the section of −7.49 m, which is very close to Section 4 (−7.51 m), the inner and outer stress curves intersect at a point, and the compressive stress value was −0.11 MPa. It indicates that this section only had axial pressure and the bending moment was zero; thus, the section was the contraflexure point of the bending moment of H-shaped steel. According to the bending moment of the H-shaped steel, the outside of the H-shaped steel above this section was tensile, while the inside of the H-shaped steel below this section was tensile. The tensile and compressive stresses of the H-shaped steel below the contraflexure point were close to zero, indicating that this construction condition had little influence on mechanical performance of this part of the SMW pile.
- (2)
- Under construction condition 2, the excavation depth of the foundation pit further increased to −6.41 m, and the second layer of supports was set. The lateral soil pressure was larger, so the overall stress of the H-shaped steel noticeably increased. The maximum tensile and compressive stresses occurred in Section 3 at −6.11 m, and the stress values were 39.3 MPa and −60.8 MPa, respectively. This section corresponds to the position of the second layer of supports, and there is a large difference between the algebraic values for tensile and compressive stresses, indicating that this section was subjected to a large bending moment. This is because the bending moment diagram of the H-shaped steel produced a turning point and the bending moment reached an extreme value under the action of the pre-added axial pressure of the second layer of supports. At the section −9.49 m, the inner and outer stress curves intersected, and the compressive stress value was −7.67 MPa, indicating that this section was the contraflexure point of the bending moment of the H-shaped steel. The increase in compressive stress indicates that the axial pressure of the H-shaped steel increased. This was caused by the vertical force further transmitted to the SMW pile through the waist beam by the second layer of the support system. Below the contraflexure point, there was still a difference between the tensile and compressive stresses, indicating that the H-shaped steel still bore a bending moment.
- (3)
- Under construction condition 3, the excavation depth of the foundation pit increased to −11.46 m, the base was reached, and the concrete cushion of the base was poured. The lateral soil pressure was at its greatest at this stage, so the overall stress on the H-shaped steel was at its greatest. The greatest values in terms of tensile and compressive stresses also appeared in Section 3 at −6.11 m, with these being 48.6 MPa and −82.3 MPa, respectively, corresponding to the position of the second layer of supports. At this time, the difference between the tensile and compressive stresses was at its most significant, indicating that the bending moment of this section was also the largest. At the base section of −11.46 m, the outer and inner compressive stresses were −18.38 MPa and −29.97 MPa, respectively. The two stress values were different, but the difference was not large, indicating that the H-shaped steel also bore a bending moment, with the bending moment value being small. The contraflexure point appeared at the section −11.79 m, slightly downward, and the H-shaped steel below the contraflexure point still bore a bending moment. This part of the SMW pile can be used as the embedded end.
- (4)
- Under construction conditions 4 and 5, the internal structure and the backfilling of the foundation pit were in the process of being constructed. Due to the offsetting part of the soil and water pressure outside of the foundation pit, the shape of the inner and outer stress curves of the H-shaped steel was similar to that for construction condition 3, but the overall stress on the H-shaped steel was reduced. The maximum tensile and compressive stresses under construction condition 4 were 45.86 MPa and −78.01 MPa, respectively, which are lower than those under construction condition 3. The contraflexure point appeared at the section −12.01 m below the base, which is further down when compared with construction condition 3. The maximum tensile and compressive stresses under construction condition 5 were 43.76 MPa and −76.99 MPa, respectively, which show a continued decrease from the basis of construction condition 4. The contraflexure point appeared at the section −12.19 m below the base, which is further down when compared with construction condition 4.
- (1)
- Construction conditions 1 to 3 correspond to foundation pit excavation, and the overall stress of the H-shaped steel increased gradually under these conditions. With the exception of when the first layer of supports was set, the maximum tensile and compressive stresses of the H-shaped steel under construction condition 1 appeared at the uppermost Section 1. After setting the second layer of supports, the maximum tensile and compressive stresses of the H-shaped steel under construction conditions 2 and 3 appeared at Section 3, corresponding to the position of the second layer of supports.
- (2)
- The excavation depths of the foundation pit from construction conditions 1 to 3 were 2.01 m, 6.41 m and 11.46 m (the base), respectively, and the corresponding contraflexure point depths of the H-shaped steel were −7.49 m, −9.49 m and −11.79 m, respectively. The contraflexure points were all below the excavation face, and it can be considered that the embedded end of the SMW pile gradually moved below the base.
- (3)
- The SMW pile can be regarded as a compression-bending member. Taking construction condition 3 as an example, the bending moment at the base section was very small, and the SMW pile below the contraflexure point can be regarded as the embedded end. The first layer of supports can be used as the elastic support of the upper end. Because this section is still below the ground, there is a bending moment, but the value of that bending moment is not large. The second layer of supports can be used as an intermediate elastic support, and the pre-added axial pressure of the supports makes the bending moment produce an extreme value, which is also the maximum bending moment value. Even if the effect of axial pressure is further considered, the H-shaped steel at this section still produces maximum tensile and compressive stresses. The maximum tensile and compressive stresses were 48.6 MPa and −82.3 MPa, respectively. The steel grade used for the H-shaped steel was Q235 B. The maximum stress value was far less than the designed strength value for the steel, and the safety of the SMW pile met the requirements.
- (4)
- Construction conditions 4 to 5 correspond to the construction of the internal structure and the backfilling of the foundation pit. Compared with construction condition 3, under these conditions, the overall stress of the H-shaped steel was reduced, the maximum tensile and compressive stresses were gradually reduce and the position of the contraflexure point was still within a small range below the base and gradually moved down, indicating that this stage had little influence on the mechanical performance of the SMW pile.
5. Axial Force Analysis of H-Shaped Steel in SMW Piles
- (1)
- Under construction condition 1, the foundation pit was excavated to −2.01 m, the reinforced concrete crown beam was poured and the first layer of steel supports was set. All test sections, including Section 1 at −3.31 m, were below the first layer of supports. The axial pressure of the H-shaped steel was mainly generated by the dead weight of the SMW pile, crown beam and the first layer of supports. Since the dead weight of crown beam and supports was constant, and the dead weight of the SMW pile increased gradually with the increase in depth, the axial pressure had a trend of increasing gradually. The maximum axial pressure occurred in Section 7 at −11.46 m, and the axial force value was −176 KN.
- (2)
- Under construction condition 2, the foundation pit was excavated to −6.41 m, a steel waist beam was installed and a second layer of steel supports was set. Section 3 and all the following test sections were below the second layer of supports. As the cemented soil at one side of the foundation pit was removed, the corresponding frictional resistance decreased. The axial pressure of Section 1 (−3.31 m) and Section 2 (−4.71 m) increased compared with that of construction condition 1. Due to the dead weight of the waist beam and corresponding supports, the axial pressure of Section 3 (−6.11 m) suddenly increased compared with that of Section 2. The axial pressure in the following sections gradually increased, and the maximum axial pressure occurred in Section 5 at −8.91 m, with the axial force value being −293 KN. The soil buried at a depth of 9.3 m to 13.6 m is fine sand. The frictional resistance of cemented soil formed by fine sand is relatively large, resulting in a decrease in the axial pressure of the H-shaped steel in the range of Section 6 (−10.21 m) to Section 8 (−12.76 m).
- (3)
- Under construction condition 3, the foundation pit was excavated to −11.46 m, the base was reached and the concrete cushion was poured. The test sections, including Section 7 and Section 8, were below the base. The frictional resistance provided by the cemented soil greatly reduced because all the cemented soil of the H-shaped steel at the side of the foundation pit was removed. Compared with construction condition 2, the axial pressure of all sections of H-shaped stee noticeably increased. The axial force of the H-shaped steel gradually increased with an increase of depth. The maximum axial pressure appeared in Section 6 at −10.21 m, and the axial force value was −481 kN. Due to the large frictional resistance provided by the cemented soil formed based on fine sand in the range of Section 7 (−11.46 m) to Section 8 (−12.76 m), the corresponding axial pressure of the H-shaped steel decreased.
- (4)
- Construction conditions 4 and 5 correspond to the construction of the internal structure and the backfilling of the foundation pit. The second layer of supports and the first layer of supports were removed. The original weight of the two layers of supports passed through the waist beam and crown beam was eliminated. Compared with construction condition 3, the distribution law of axial force with depth remained unchanged, while the axial pressure value decreased to a certain extent. The maximum axial pressure occurred in Section 6 at −10.21 m under construction condition 4, and the axial force value was −413 kN. The change in the axial force of the H-shaped steel under construction conditions 4 and 5 was not obvious.
6. Bending Moment Analysis of H-Shaped Steel in SMW Piles
- (1)
- Under construction condition 1, the excavation depth of the foundation pit was not large and only the first layer of supports was set. The corresponding lateral soil pressure was small, resulting in a small bending moment in the H-shaped steel along the height direction. The maximum positive bending moment occurred in Section 1 (−3.31 m), and the bending moment value was 111 KN·m. It can be considered that the H-shaped steel bent to the side of the foundation pit, and the bending moment of H-shaped steel below this section gradually decreased. The bending moment distribution curve intersected the vertical axis at a point adjacent to Section 4 (−7.51 m). The bending moment here was zero, which can be regarded as the contraflexure point of the H-shaped steel. In the portion below this point, the bending moment made the H-shaped steel bend to the outside of the foundation pit, and the bending moment value was close to zero, indicating that this construction condition had little influence on mechanical performance of this portion.
- (2)
- Under construction condition 2, the excavation depth of the foundation pit was increased and the second layer of supports was further set. The corresponding lateral soil pressure increased, and the bending moment of the H-shaped steel noticeably increased. According to the distribution state of the bending moment curve, most of the upper range of the H-shaped steel bore a positive bending moment, and the H-shaped steel continued to bend to the inner side of the foundation pit. The maximum positive bending moment occurred in Section 3 (−6.11 m), with bending moment value of 261 KN·m. This is where the second layer of supports was set. The large axial pressure pre-added in the supports was the equivalent to a large, concentrated force applied to the H-shaped steel. The bending moment curve bent at this section, and the bending moment value reached its extreme value, which was the maximum value. At the depth of −9.49 m, the bending moment curve also intersected the vertical axis at a point. Here, the bending moment was zero, which was the contraflexure point of the H-shaped steel. Below this section, the bending moment caused the H-shaped steel to be strained at the inner side of the foundation pit. The H-shaped steel still bore a bending moment, and the bending moment gradually increased. At the bottom Section 8 (−12.76 m), the bending moment value reached −101 KN·m.
- (3)
- Under construction condition 3, the foundation pit was excavated to the base. The lateral soil pressure reached its maximum, and the bending moment of the H-shaped steel also reached its maximum. In most of the above ranges, the H-shaped steel bears positive bending moments, and the bending moment values were large. The maximum positive bending moment still occurred in Section 3 (−6.11 m), where the second layer of supports is set, with a bending moment value of 371 KN·m. At the base, Section 7 (−11.46 m), the H-shaped steel still bore a positive bending moment, which was 49 KN·m. At its lower depth of −11.79 m, the bending moment curve intersected the longitudinal axis and the bending moment value was zero. This was the contraflexure point of H-shaped steel, and there was a certain of negative bending moment in the lower portion of the H-shaped steel.
- (4)
- Under construction conditions 4 and 5, two layers of supports were removed successively from bottom to top in the process of foundation pit backfilling. The shape of the bending moment distribution curve is practically the same as that of construction condition 3, but the overall bending moment of the H-shaped steel decreased gradually. The maximum positive bending moments under construction conditions 4 and 5 were 340 KN·m and 287 KN·m, respectively, which were further reduced compared with construction condition 3. The positions of the contraflexure points under construction conditions 4 and 5 appeared at −12.01 m and −12.19 m below the base, which further gradually moved down compared with construction condition 3.
- (5)
- From construction conditions 1 to 5, the positions of the contraflexure points of the H-shaped steel are −7.49 m, −9.49 m, −11.79 m, −12.01 m and −12.19 m, respectively. It can be seen that during the whole construction process, from foundation pit excavation to backfilling, the position of the contraflexure point gradually moves down. It can be considered that the embedded end of the SMW pile gradually moves down and stabilizes below the base.
7. Shearing Force Analysis of H-Shaped Steel in SMW Piles
- (1)
- Under construction condition 1, the first layer of supports was set and the overall shearing force of the H-shaped steel was small. The maximum positive shearing force occurred in Section 1 (−3.31 m), with a value of 32 KN. The shearing force below this section underwent changes, with the overall trend gradually decreasing. At a depth of −9.25 m, the shearing force decreased to zero. From this depth down, the shearing force was very small and changed little.
- (2)
- Under construction condition 2, the second layer of supports was set and the shearing force of the H-shaped steel increased significantly. The upper portion of the H-shaped steel mainly bore the negative shearing force. The negative shearing force with the largest absolute value occurred at the depth of −5.25 m, with the value of −48 KN. The shearing force value was zero at the depth of −6.45 m, which is just near the position of the second layer of support (−6.11 m). Due to the concentrated force provided by the supports, the shape of the shearing force curve changed, with indications that the shearing force value changed both positively and negatively. If an ideal concentrated force is applied, the shearing force curve should be abrupt here. Considering that the shearing force curve is obtained by taking the derivative of the bending moment fitting curve, the shearing force curve slowly changed from the above negative shearing force to the below positive shearing force. The lower portion of the H-shaped steel mainly bore the positive shearing force. The maximum positive shearing force occurred at the depth of −8.82 m, with a value of 81 KN.
- (3)
- Under construction condition 3, the foundation pit was excavated to the base and the shearing force of H-shaped steel reached its maximum. The upper portion of the H-shaped steel bore the negative shearing force. Compared with construction condition 2, the shearing force further increased. The negative shearing force with the largest absolute value occurred at the depth of −5.68 m, with a value of −63 KN. This is also the negative shearing force with the largest absolute value among the five construction conditions. The shearing force value was zero at the depth of −7.23 m, which is also near the position of the second layer of supports. The shearing force curve slowly changed, and the shearing force value changed from the above negative value to the below positive value. The lower portion of the H-shaped steel bore the positive shearing force, and the shearing force increased as the depth increased. In the bottom Section 8 (−12.76 m), the shearing force reached its maximum, with a value of 123 KN. This is the maximum positive shearing force among five construction conditions and also the shearing force with the largest absolute value.
- (4)
- Under construction conditions 4 and 5, the second supporting system and the first supporting system were successively removed along the foundation pit depth from bottom to top. Compared with construction condition 3, the overall shearing force of the H-shaped steel was significantly reduced. The upper portion of the H-shaped steel still bore negative shearing force. The negative shearing force with the largest absolute value was −41 KN. The lower portion of the H-shaped steel still bore positive shearing force. The maximum positive shearing force was 99 KN.
8. Conclusions
- (1)
- Three SMW piles with clear mechanical properties were selected on site. Reinforcement dynamometers were arranged in several typical test sections along the H-shaped steel. The stress distribution state of the H-shaped steel with foundation pit depth and the development of and changes in the related laws according to the construction process were monitored. These works laid the foundation for the subsequent internal force analysis of H-shaped steel in an SMW pile.
- (2)
- The axial force of the H-shaped steel is mainly caused by the dead weight of the SMW pile, the dead weight of the crown beam and the first supporting system, the dead weight of waist beam and the second supporting system and the frictional resistance of the cemented soil, etc. Under several construction conditions, the H-shaped steel only bears axial pressure, which varies with the depth of foundation pit, the setting and removal of the two supporting systems and the frictional resistance of the cemented soil. The axial pressure generally increases with the increase in foundation pit depth under the influence of various factors. The maximum axial pressure appeared in Section 6 (−10.21 m) under construction condition 3, with an axial force value of −481 kN. The frictional resistance of cemented soil based on fine sand near the base is large and the axial pressure is small.
- (3)
- The bending moment of the H-shaped steel is mainly caused by the lateral soil pressure and the concentrated forces provided by the first supporting system and the second supporting system. Under construction condition 3, the overall bending moment reached its maximum, and the upper most portion of the H-shaped steel bore positive bending moment. At the same time, the portion of the SMW pile below the contraflexure point slightly below the base can be regarded as the embedded end, which this bearing a small bending moment at the base section. The first supporting system can be used as the elastic support of the upper end, and there is still a bending moment at the corresponding section. The second supporting system can be used as the intermediate elastic support, with a maximum positive bending moment occurring in the corresponding section, with the value of 371 KN·m.
- (4)
- With an increase in the excavation depth of the foundation pit, the contraflexure point of the bending moment of the H-shaped steel in the SMW pile gradually moves down. The contraflexure points are all below the excavation face. In the process of foundation pit backfilling, the contraflexure point continues to move down slightly. It can be considered that in the whole construction process, the embedded end of the SMW pile gradually moves down and stabilizes below the base.
- (5)
- The shearing force of the H-shaped steel is mainly affected by the lateral soil pressure and the concentrated forces of the first and second supporting systems. The overall shearing force reaches its maximum under construction condition 3. At the same time, the upper portion of H-shaped steel bears a negative shearing force, which its largest absolute value being −63 KN. The lower portion of the H-shaped steel bears a positive shearing force, which produces a maximum positive shearing force value of 123 KN. Near the middle second supporting system, the shearing force is zero, the value changes from positive to negative and the shearing force curve is in a transition stage.
Author Contributions
Funding
Conflicts of Interest
References
- Russell, A.R.; Chapman, M.; Teh, S.H.; Wiedmann, T. Cost and Embodied Carbon Reductions in Cutter Soil Mix Walls through Fibre Reinforcement. Geosynth. Int. 2017, 24, 280–292. [Google Scholar] [CrossRef]
- Zhang, J.W.; Chen, Y.L. Experimental Study on Mitigations of Seismic Settlement and Tilting of Structures by Adopting Improved Soil Slab and Soil Mixing Walls. Sustainability 2018, 10, 4069. [Google Scholar] [CrossRef] [Green Version]
- Fatahi, B.; Khabbaz, H.; Fatahi, B. Mechanical Characteristics of Soft Clay Treated with Fibre and Cement. Geosynth. Int. 2012, 19, 252–262. [Google Scholar] [CrossRef] [Green Version]
- Yi, Y.; Liu, S.; Puppala, A.J. Laboratory Modelling of T-shaped Soil-cement Column for Soft Ground Treatment under Embankment. Geotechnique 2016, 66, 85–89. [Google Scholar] [CrossRef]
- Rashid, A.S.A.; Kueh, A.B.H.; Mohamad, H. Behaviour of Soft Soil Improved by Floating Soil-cement Columns. Int. J. Phys. Model. Geotech. 2018, 18, 95–116. [Google Scholar] [CrossRef]
- Ter-Martirosyan, A.; Sidorov, V.; Sobolev, E. Dynamic Properties of Soil Cements for Numerical Modelling of the Foundation’s Basis Transformed under the Technology of Deep Soil Mixing: A Determination Method. Buildings 2022, 12, 1028. [Google Scholar] [CrossRef]
- Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Technical Specification for Soil Mixed Wall: JGJ/T 199-2010; China Architecture & Building Press: Beijing, China, 2010. (In Chinese) [Google Scholar]
- Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Technical Code for Testing of Building Foundation Piles: JGJ 106-2014; China Architecture & Building Press: Beijing, China, 2014. (In Chinese) [Google Scholar]
- Liu, Y.; Hu, J.; Li, Y.P.; Li, L.H. Statistical Evaluation of the Overall Strength of a Soil-cement Column under Axial Compression. Constr. Build. Mater. 2017, 132, 51–60. [Google Scholar] [CrossRef]
- Shu, B.; Gong, H.; Chen, S.; Ren, Y.; Li, Y.; Yang, T.; Zeng, G.; Zhou, M.; Barbieri, D.M.; Li, Y. Case Study of Solid Waste Based Soft Soil Solidifying Materials Applied in Deep Mixing Pile. Buildings 2022, 12, 1193. [Google Scholar] [CrossRef]
- Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Technical Specification for Retaining and Protection of Building Foundation Excavations: JGJ 120-2012; China Architecture & Building Press: Beijing, China, 2012. (In Chinese) [Google Scholar]
- Hasheminezhad, A.; Bahadori, H. Seismic Response of Shallow Foundations over Liquefiable Soils Improved by Deep Soil Mixing Columns. Comput. Geotech. 2019, 110, 251–273. [Google Scholar] [CrossRef]
Test Section | Distance to the Ground (m) |
---|---|
Section 1 | 3.31 |
Section 2 | 4.71 |
Section 3 (second layer of supports) | 6.11 |
Section 4 | 7.51 |
Section 5 | 8.91 |
Section 6 | 10.21 |
Section 7 (the base) | 11.46 |
Section 8 | 12.76 |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Xian, Q.; Wang, Z.; Liu, X.; Ma, S.; Xiao, Z. Site Measurement Study on Mechanical Properties of SMW Piles of Building Structures in Sandy Soil Areas. Buildings 2022, 12, 1733. https://doi.org/10.3390/buildings12101733
Xian Q, Wang Z, Liu X, Ma S, Xiao Z. Site Measurement Study on Mechanical Properties of SMW Piles of Building Structures in Sandy Soil Areas. Buildings. 2022; 12(10):1733. https://doi.org/10.3390/buildings12101733
Chicago/Turabian StyleXian, Qingjun, Zhe Wang, Xiaosong Liu, Shaokui Ma, and Zhaoran Xiao. 2022. "Site Measurement Study on Mechanical Properties of SMW Piles of Building Structures in Sandy Soil Areas" Buildings 12, no. 10: 1733. https://doi.org/10.3390/buildings12101733
APA StyleXian, Q., Wang, Z., Liu, X., Ma, S., & Xiao, Z. (2022). Site Measurement Study on Mechanical Properties of SMW Piles of Building Structures in Sandy Soil Areas. Buildings, 12(10), 1733. https://doi.org/10.3390/buildings12101733